HomeMy WebLinkAboutBLD03-044r ~~ ,. 3
U
•
•
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Fax 36085-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-044 Issued: 03/21!03 Parcel Number: 936 903 201
Job Address: 5531 Kuhn Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: 5 Nature of Work: Construct Single-family Dwelling
Owner: Mike Fleming Contractor: Ray Weber - WEBERC*0330D
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.(1TiTRF.T) TN4PF.f TTnN~
APPRnVF.n/nATF.
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS -per architectural details
Setbacks
Footings
Forms
Reinforcement -per architectural design
Interior Footings
Porch Piers
Deck
LIFER
FOUNDATION -per architectural detail; all
elements require inspection prior to cover
Stem Wall
-Forms
Reinforcement -per architectural design
Anchor Bolts & Washers -per architectural design
Post to Foundation Wall Positive Connection
Engineered Holdowns
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
~ ~,
Building Permit #03-044
RE UIRED INSPECTIONS APPROVED/DATE
GROUNDWORK PLUMBING
Pressure Test '
Pipe Joints Exposed
Pipe Bedding
SLAB
Interior footings 'Q
Insulation - R-10 fully insulated
Hydronic Heat Tubing ~~ ~ -
~ ~, 3
FLOOR FRAMING
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
f
81
~ ~ ~,
Hydronic Heat Tubing (__.t
t
~wc ~(~ 03
Joists
Blocking 1 -
~ ~ Y~
Positive Connections
Treated Wood to Concrete ~ ~3
Anchor Bolts & Washers
Foundation Vents
Crawl. Access
PLUMBING
Rough-In (D-V-T & Clean outs) U iD~erQ(o p o~ t ~ b3 '
IG ~~uNfco~r~ 4-'Ii~e= ~~%/~
l 111
ter Hammer Arrestors
Gas Supply (~Oc.tG~ -1 0 ,
~ Ll "Zi~~C) j
Hose Bibbs - backflow rotection re uired
ipe nsulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
Boiler -manufacturer's installation instructions
shall be on-site at time of inspection
Whole House Fan -Master Bath
Source Specific Exhaust Fans @ bathroom (SOcfm),
laundry room, (50 cfm) and kitchen (100 cfm)
Environmental air exhaust ducting (with backdraft
dampers}, insulation (R-4) and terminus (3' from
o enin s into buildin )
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
i
i
s
4 t r
•
•
REQUIRED INSPECTIONS
Building Permit #03-044
APPROVED/DATE
FRAMING
Walls
Roof
Rafter positive connection
Attic venting -ridge & eave
Posts, beams and headers
~,
~ r ~~°" P ,~~
~
~ ~
Attic Access {.'
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better T- ^~''~~
_. _
' r - 0.58 or better _
- -- - -___
NFRC sticker must be on windows, doors &
skylights at time of inspection
Air Seal
Fresh Air Intake - wall ports awl ~,,,1 Do ~
Fireblocking
Weather Resistive Barrier
INSULATION ~ ~ x :.
~ !' ~ ,- ~
~ ~ ~ ~ ~
Floor (R-30) _
Walls (R-21) _._~.T.-._..._. __ _ _ _ _
ili .- -_ _ _____-.--__~
e
ng
Baffles _ ._..__._____~___. f
______~~
Vapor Barrier -paint ~~
-- -
__
ac po y m crawl space ~ ---
~ T~
z
- ~--' - ~ `~ C ,,
DRYWALL NAILING
Walls
~ °~2 3
Interior braced wall panels p lC
Ceiling
FINAL
Public Works Sign-off ~-~
~
~
LPG t ~~
~
House Numbers - 5" numbers '
Plumbing f '', j
MechanicaUHeating -~'
Insulation Certificate ,~'~,~~
Vapor Barrier Paint Certificate
Smoke Detectors
Stairs, Decks & Landings
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
* .w.:
Building Permit #03-044
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries i
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have beep completed and•inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Buildm~ Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8.
9. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
10. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
11. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
Waterman & Kat: Building
s 181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Fai 360-385-7675
CITY OF PORT TO~`~NSEND
t
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-044R-1 Issued: 04!30/03 Parcel Number: 936 903 201
Job Address: 5531 Kuhn Zoning: R-II Type: V-N Occupancy: RR=3
Total Occupant Load: 5 Nature of Work: Revision 1: Revise foundation and roof
framing
Owner: Mike Fleming Contractor: Ray Weber- WEBERC*0330D
GENERAL CONDITIONS APPLY: See last Wage
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
NOTE: See original permit for all other inspections
RFf1TTTRFiI TNCPF(`'TT(1NC APPRnVF.n/i)ATF.
FOOTINGS -per architectural details
Setbacks
Footings
Forms ~~
~
~
Reinforcement -per architectural design ~
j
ntenor Footings
h Pi
~ ~ ~~-
P
~
orc
ers o rc
. ~ ~ ~ r 5
S-,3
LIFER ~GS
FOUNDATION -per architectural detail; all
elements require inspection prior to cover / l~ ~ ^'
°C
~) S ' ~ 3 r°3
Stem Wall
Forms
Reinforcement -per architectural design
Anchor Bolts & Washers -per architectural design
Post to Foundation Wall Positive Connection
Engineered Holdowns
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 3
.~
Building Permit #03-044R-1
RE UIRED INSPECTIONS
FRAMING
Walls
Roof
Rafter positive connection
Trusses -Engineered truss plan to be on site at
inspection
Truss positive connection ~,,
,,~,, ~~ t ~, ~ ~ ~, /~
'
~
Attic venting -ridge & eave {-~~
r --'
"-'"'~ 1
Posts, beams and headers `-
Attic Access
Windows -escape
Windows -safety glazing
Window U-factor - 040 or better _ _. _._~.____ _ _ ___.____________.___.~
Door U-factor - 0.20 or better _ _ _
_ _
NFRC sticker must be on windows, doors &
skylights at time of inspection
Air Seal
Fresh Air Intake - ports ~ r ~,~iL~r,~..?
Fireblocking
Weather Resistive Barrier
INSULATION F,~-~,1~~ .~..~. ~~ ~~'*, ;~ ~'~
Floor (R-30) -
eilin ~' ault R-30, Truss R-38)
_.
--_
--....____._.
Baffles . _
Vapor Barrier -paint
_ ~ T
mi ack poly in craw space ~R~ 2
APPROVED/DATE
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Building Permit #03-044R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. -Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall .review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
• 385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3