HomeMy WebLinkAboutBLD03-043
~~
•
•
Waterman & Katz Building
I81 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360379-5086 Fa:360-385-7675
CITY OF PORT TOV~NSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD~3-043 Issued: 03/28/03 Parce[ Number: 948336209
Job Address: 65 Hancock Street Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: 2 Nature of Work: Expand Single-.family Dwelling
Owner: Randy Unbedacht Contractor: Same as Owner
GENERAL CONDITIONS APPLY: See Last Page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
D L'!1T TTA L`il 7NCUTi'!''TTl1NQ
APPRf)VF11/i)ATF
DEMOLITION
Materials from demolition shall be taken to the Jefferson
County Landfill or other approved off-site location meeting
all state and local codes
Q o5
.
FOOTINGS ¢ 2803
, ~~
~~c~
e
Footings
Forms
Reinforcement /~
~~7
~
~L ,
Interior Footings /
Porch/Deck Piers ,5 I t7- ~ J3
FOUNDATION
Stem Wall ~ ~ ~ 03
Forms ~ pp
Reinforcement ~ V
Anchor Bolts & Washers ~ ~- '
Engineered Hotdowns
Crawl Access
Foundation
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Permit #03-043
REQUIRED INSPECTIONS APPUnvFnmaTF
FLOOR FRAMING
Beam
Beam Pockets O ~ ~'l~ 0 3
Joists G
Blocking
Treated Wood to Concrete
Positive Connections
Anchor Bolts & Washers O
~ / '? d 3
PLUMBING
EX7Sting
MECHANICAL
Bath Fan
Kitchen Fan
Environmental Air Exhaust ducting (with backdraft dampers),
insulation (R-4) and terminus (located 3' from openings
into building)
FRAMING
Walls
Engineered Shear Walls
CeilinglRoof
Engineered Pasts, Beams, Headers and Joists
Attic Venting - @ eave and ridge
Window U-Factor -per WA7TSUN _
0~. ~ I 6 ~
Window -escape
Window -safety glazing
Fresh Air Intakes -window port required
Door Ufactor -per WAT7SUN -~
Truss Positive Connection
Air Seal
Fireblocking
Weather Resistive Barrier
INSULATION -see attached WATTSUN
Floor --
Walls _' ~ ;~L_
~. ~ l~„~~p3
Ceiling ____ ~-~b
/
Vapor Barrier required: paint, faced Batts, etc.
Baines
6 mil poly in crawl space ~..,,.- ~ ~ 5 ,~ ~
i
Cali 48 hours before you dig-for utility line locates
1-800-424-5555
Page 2 of 4
~, Building Permit #03-043
RF.(ITTTRF.T) TN~PF.C'TT(~N4 APPROVED/DATE
DRYWALL NAILING
~
~~
~ '
Walls ,
,;
;~
Ceilings
FINAL
House Numbers - 5" numbers
Decks/Landings/Guardrails
Stairs/Handrails - NA, < .200 square feet
~
Insulation Certificate if applicable ~
Vapor Barrier Paint Certificate if applicable
Smoke Detectors throughout
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
n
Building Prnnit #03-043
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits ezpire if no progress has been made within sia months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
l.~l
---~
Call 48 hours before ou di for utili line locates
Y g t3'
1-800-424-5555
Page 4 of 4