HomeMy WebLinkAboutBLD03-042Waterman 8c Katz Building
181 Quincy Street, Suite 301
Port Towmaend. WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
I CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-~42 Issued: 02/27/03 Parcel Number: 948 329 401
Job Address: 1109 Third Street Zoning: R-II Type: V-N Occupancy: R-3
Nature of Work: Reulace two windows in living room with same size windows.
Owner: Martin Fetting
(360) 385-3196
Contractor: KDesigners - KDESI**0330S
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REni1iRED INSPECTIONS
•
APPROVED/DATE
FRAMINGlFINAL:
Windows -safety glazing where applicable per
attached details.
Window Ufactor - .40 or better
NFRC window sticker must be on
windows at inspection time
Air Seal
FINAL
Smoke Detectors throughout; battery powered
Smoke Detectors adequate in existing
construction
House Numbers -min. 5" high
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit ItBLD03-042
GENERAL CONDITIONS
1. Contractors workin on this ro'ect are re wired to have a Labor & Industries contractor's re 'stration
g P l q ~
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entranci~ (see attached_details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings; sodding, etc, once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
s~eduling the Building Department's final inspection.
7. Final Inspections are required ,prior to occupancy; a Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2