HomeMy WebLinkAboutBLD03-041Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BI.DU3-041 Issued: 03/14/03
Job Address: 301 Calhoun Street Zoning: R-II
Nature of Work: Replace 64 square foot covered front porch.
Owners: Tomoko Shaffer and Janis Marquardt
379-5734
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.(1TTTRFT) TNCPFC.TT(1N4
r
L
Parcel Number: 957 306 501
Type: V-N
Occupancy: R~3
Contractor: Owner
A PPR nVFn/n A TF
FOOTINGS
Setbacks
Forms - sonatubes
Footings
Reinforcement
FRAMING/FINAL -Framing and final inspections may
be done at the same time if all elements of construction are ~/
~~ ~- r ~ ~ S ,~__.~ L1
available for inspection r
Joists
~
Ledgers ,
Rafter Positive Connection
r~_ C.,Z~ ~'~^~ v ~ ,
Positive Connection Post-to-Beam
Post Base/Positive Connection
Treated Wood to Concrete
Rafters
Blocking
Seismic Ties
Guardrails
House Numbers -check for 5" numbers
Smoke Detectors
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit #BLD03-041
ENERAL CONDITION
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TE5C) measures shall be installed on-site and inspected prior
to beginning construction; calf 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shalt be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements. have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedulinE the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within sig months, or if no inspections are done
by the Building Department within one year. Call" for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2