CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 far Inspection
Permit Number: BLD03-~38 Issued: 03/06/03 Parcel Number: 955 900 011
Owner/Contractor: Hamilton Heights LLC Installer: Kozelisky's Home Services WAINS0626
Job Address: Lot 11; 2278 Rainier Street Zoning: PUD Type: V-N
Occupancy: R-3/iJ-1 Total Occupant Load: 4/1
Nature of Work: Set Manufactured Home with attached site-built garage and concrete deck,
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
* * *Hours of Construction are limited to 7: 30 a m. to 6: 00 p. rn. Monday through
Friday and prohibited on weekends and national holidays * * *
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT
CONTROL
See details attached to MIP03-021 and
General Condition #2
Silt Fence
Drive Off Mat
SLAB/CONCRETE ~,:
!
~ ,
~ ~
~
~''~ it
'~ +,~r
Setbacks ~
_
_ _
~ ,
,
.
. ~-,~
Forms
Monolithic Slab/Foundation (garage)
Reinforcement ~ - ~ _ ~~~
-~_ ,
Anchor Bolts
Deck Piers
Alternate Braced Wall Panel Holdown Hardware
LIFER - __ _ ° .; t ;~'; ~ ~ ~~° ~' ~..
c `- `.~-
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
~~.~~:~~
Permit # BLD03-03~
' ,~
REQUIRED INSPECTIONS APPROVED/DATE
PLUMBING (prior to skirting)
Water Supply -Main shut-off valve (port or ball valve)
installed in water supply piping prior to connection to home,
min. 3/s"diameter, same as supply pipe
Pressure Reduction Valve if > 80 psi
Hose Bibs (backflow protection required) I,~,t.~
Pipe Insulation -Outside & in crawl space chi /
Pressure Test -100 p.s i. for 15 minutes 4 ~
~
Pressure relief valve drain - to exterior of skirting, exhaust I
dawmvard between 6"and 24"above ground
Drainage Piping -sloped min. '/s "per foot
MECHANICAL (prior to skirting)
Ducts & Duct Insulation
Dryer Exhaust -vented to outside. Extension into crawl space
requires venting through skirting with no dips; follow dryer
ti
t
'
i
t
t
t
l
bi
d l
th
d
ti
L~IS/a3
manufac
ruc
urer
s
ns
ons;
o
a
com
ne
eng
of
uc
ng
not to exceed 14' w/ 2-90° elbows ~c r
FLOOR FRAMING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed per
manufacturer's installation manual; clearance of 18"min. from ~
lowest point of I-beam and the ground or footing for min. of ~
75% `of area under home w/ 12 "min. elsewhere unless ~ ~ ~b3
installation manual specifies; otherwise area around home
graded to provide runoff away from home.
FRAMING:
Engineered roof truss plan to be on-site at time of inspection
Walls
Alternate Braced Wall Panels
Header
Roof
GarageJHouse Attachment
DRY WALL NAILING
Garage/House Occupancy Separation with 20 minute
self-closing door
f
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 4
~,
•
Pennit # BLD03-038
RE
ONS
FINAL
Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number -minimum 5" numbers
Plumbing
Mechanical
Final -Building
No holes or gaps greater than '/r "allowed
in skirting. Skirting to be rated for contact with
earth if backfill is irrvolveci!
Crawl space ventilation per installation
manual @ 1 sq. ft./ISO sq. ft. (12 required);
located close to corners, on at least two
opposing sides for cross ventilation.
Crawl space access must provide access to
all areas under home; minimum 18 " x 24 "
unless specked otherwise; covered with vinyl,
pressure-treated wood or metal.
A'1'1:
~~
r J l
1. .. ((( t 111
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's fmal inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
~~
Permit # BLD03-038
,~
8. All building permits ezpire if no progress has been made within sia months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep yon
building permit active.
9. Revisions require review and approval prior to waking changes in the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.