Loading...
HomeMy WebLinkAboutBLD03-035r l~ I Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDU3-035 Issued: 03/13/03 Parcel Number: 974 402 201 Job Address: 517 Bryan Street NOTE: should structure become an ADU, please apply for a separate address at that time Separate permit will be required when structure use is changed from residential storage to future dwelling unit. Zoning: R-II Type: V-N Occupancy: R-3 Total Occupant Load: 2 Nature of Work: Construct two story heated storage -possible future ADU. Owners: Thomas A. Heuberger Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE • SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: All elements of engineering require inspection prior to cover RF.(1TTTRF.TI TNCPF.f TT(lNC A A PPR (1VF11/n A TF. TEMP EROSION & SEDIMENT CONTROL -' ~ S S "~ S ~ ~ ~ ~ S ~-~ ~'~ Un See General Condition No. 2 ~ Silt Fence as needed ~ ~~ y ~ Q 3 ~:?-~ L.L. h-~- c~ .~=~ ~'~- Drive OffMat to restrict sediment from leaving the site FOOTINGS -SLAB Setbacks Footings Forms Reinforcement Anchor bolts Porch/Deck Piers LIFER Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pemut # BLD03-03~ REQUIRED INSPECTIONS APPROVED/DATE ' FOUNDATION @ South wall Stem Wall Forms Reinforcement Anchor Bolts FLOOR FRAMING Joists Blocking Treated Wood to Concrete Anchor Bolts & Washers PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrester @ clothes & dishwashers Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater -EXISTING R-10 under if electric Seismic Restraint -strap tank @ 1/3 points 18" A. F. F. Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) r s w Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Pemvt # BLD03-035 RE UIRED INSPECTIONS APPROVED/DATE FRAMING Walls Ceilings Roof Blocking Rafter Positive Connections Roof Venting - eave and ridge vents Deck Windows -escape Windows -safety glazing r ~~.., Windows Ufactor -.~0 or better for unlinuted glazing ,' (!; :,p ~ ~ NFRC window sticker must be on windows, skylights & `~ 1-~ ~'- ~ ' f ;" r ~o doors at inspection time____ - Fresh Air Intake (Wall Ports) __-- l7oors U-Factor g9- or betterTRated doors ~ garage/house ~ ~~~ ,' ; f r ~F/~ °~ & house/ADU ~ ~ ~"~' Air Seal Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30) ~ i ~ Walls (R-21) ~~ ~ ~,'` Ceiling (R 30~ ___ `, Vapor Barner: paint _ _._ Baffles _ } ~ ~~))~ r~ _ . ,(, J) (,^{+ f DRY WALL NAILING ~ " One- hour @ Storage/shop and @ north wall ^ , ;, ~-:~J'..~, ;~ "~'~ , , ~ -~ ~=, ~: •" ', Walls ~ ~ Ceiling FINAL Public Works Sign-Ofd ~.~~ House Numbers - 5" minimum -, Plumbing Mechanical/Heating ~ , ,. _ ~ r ~ ' i _ '1 __ ~ ~ ~~ , Vapo€-Barxi~-Paint-C-ertifca~e 1a~`~ ~ ~ ~ Insulation-Certiftrate ,,tj; Smoke Detectors Final -Building Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 3 of 4 Permit # BLDO3-o3 ~; ~F , GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; cat1385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free .of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval Qrior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 Waterman & Katz Building 181 Quincy Street Suite 301 Port Townsend, WA 98368 Phone (360) 379-3208 Fax (360) 385-7675 CITE OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TIIIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD~3-035R-1 Issued: 06/16/03 Parcel Number: 974 402 201 Job Address: 517 Brvan Street Zoning: R-II Type: V-N Occupancy: R-3 4 Total Occupant Load: No Change Nature of Work: Revision #1: WATTSUN submitted to compensate for .50 U-Factor window_in heated storage space. Owner: Thomas Neuberger Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 See original permit BLD03-035 for other inspections. RF.nI1TRE1) jNSPECTi(~N~ APPRnVED/DATE FRAMING Window Ufactor -per alterations calculations ~~ ~~ ~ ~ ~ ~ ~ ~ ~ ~ ~~~ NFRC window sticker must be on ` ~ ' - ' ~ ~` ~ = ~ windows and skylights at inspection time INSULATION Below Grade Walls - R-7.5 Foam Ext. 2' depth On-Grade Slab - R-10 Fully Insulated - - --- _. __ _ _ _ Floors - R-21 .~.,I r #!~ ~ ~,~ Ceiling - R-30 _ ,, _ y Above Grade Walls -See alteration calculations _____ _ .._.._ __ _.____..__~~__.___T._.__ r______.. ___.__.._r_____.... __ _ Doors - U-0.16 _ . ~~~ y'~` .. r ~~ "r~ _ FINAL -see original inspection record • Page 1 of 2 Permit # BLD03-0358-I 1 GENERAL CONDITION 1. Contractors working on this project are required to have a Labor & Industries contractor's registration • number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- • residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. f Page 2 of 2