Waterman & Katz Building
181 Quincy Stmt, Suite 301
Port Townsend, WA 98368
Phone: 360379-5086 Fsz 360385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD~3-033 Issued: 03/13/03 Parcel Number: 948 309 701
ia~'i
Job Address:~YCleveland Street Zoning: R-II Type: V-N .Occupancy: R-3
Total Occupant Load: 4 Nature of Work: Construct Single-family Dwelling
Owner: TIR Corporation Contractor: Same as Owner - TIRCO*052N3
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.C1TTiRF.il TNCPF.fTI(1NC
APPR(1VF.n/1)ATF,
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive OffMat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
~ Z ~ ~ 'S
~ ~ S S~ ~~- L. ~'
Footings ~~- C.-~ r~~J~--
Forms
Reinforcement
Interior Footings
Porch Piers
LIFER
FOUNDATION
Stem Wall ,,p~
Forms ~ I
Reinforcement ~ I ~ Ci3
Anchor Bolts & Washers
Beam Pockets
Crawl Access
Foundation Vents - 8 required
0 own ar ware
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Permit #03A33 .l
REnUIRED iN~PE ("TInN4 a ppu ~vFnm n TF ~
FLOOR FRAMING - -- - - _ - -- - _ - _
NOTE: Engineered BCI f loor plan shall be on-site
~~ ~
G~
Joists r
Blocking ®a S s ~ ~
Shield under Posts
~~ ~ ~
Girder to Concret
Positive Connections /~
Treated Wood to Concrete Gc~.~~~--
Anchor Bolts & Washers
PLUMBING ¢~~~. ASH 6lr.~G'i B ~o I t 03
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestors
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior
MECHANICAL ~-.fr;~,~o~ ~ -t 3
LPG Stove
Whole house fan ,
Kitchen Fan (100 cfm)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
FRAMING ~~- ~,,~-Yale ~- f 4~
Walls
Roof
Rafter positive connection
Attic venting -ridge & eave
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Air Seal
Fresh Air Intake -window ports
Fireblocking
Weather Resistive Barrier
1
Call 48 hours. before you dig for utility line locates
1-800-424-5555
Page 2 of 4
•
•
Building Permit #03-033
1
R F (1T TTR FT) TNCPF.f'TTnN4
APPROVED/DATE
INSULATION
Floor (R-30 )
Walls (R-21) - ___ -- ___ _ -- ---
Ceiling (R-38) -- - ----- _-- _
Baffles ~ - -
Vapor Barrier -paint
6 mil black poly in crawl space
-
~ ~,, ~l-~ ~ _ ~ ~ \ ~ - ~
1
DRYWALL NAILING ~
Walls ~~`~ a~.,~~~'" ,/ r:,-h~~. °2;
Ceiling
Enclosed Usable Space under Stairs
FINAL
Public Works Sign-off
LPG
House Numbers - 5" numbers
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint. Certificate
Smoke Detectors
Stairs, Decks & Landings
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit #03-033 ~
l
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is repaired. Public Works approval
must be received Arior to scheduling the Building Deaartment's final insuection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits ezpire if no progress has been made within sia months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
City of Port Townsend
Building and Community Development
Waterman-Katz Building
181 Quincy Street, 5urte 301A, Port Townsend WA 98368
(360) 379-3208 FAX (360) 385-7675
•
O~ pOAT TOE
~' y~
~o
~~~f~-
wn
TEMPORARY CERTIFICATE OF OCCUPANCY
March 15, 2004 through April 14, 2004
Building Permit No.: BLD03-033
Owner: Kathie Meyer
Address: 1251 Cleveland Street, Port Townsend
Location: Eisenbeis Addition, Block 97, Lot 1
Use(s) permitted: Single-family Residence
The above-referenced building or portion complies with the applicable requirements of the Port Townsend Building
Code (PTMC 16.04), has passed all required inspections and maybe used and occupied prior to completion and
final inspection without substantial hazard, and is hereby granted this Temporary Certificate of Occupancy, provided
substantial progress is being made toward completion and final inspection is passed by the date entered above.
This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not be removed except
by the Building Official.
Approved:
Building Official
Complete Remaining Items for Final
1. Provide 6 mil black visqueen in under floor
2. Paint rusty gas pipe -completed, needs inspection
3. Complete siding
~i~!°y
Date
(3~- 2z4~f,
a,n,~.r ~