Loading...
HomeMy WebLinkAboutBLD03-033ti ~r e • Waterman & Katz Building 181 Quincy Stmt, Suite 301 Port Townsend, WA 98368 Phone: 360379-5086 Fsz 360385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD~3-033 Issued: 03/13/03 Parcel Number: 948 309 701 ia~'i Job Address:~YCleveland Street Zoning: R-II Type: V-N .Occupancy: R-3 Total Occupant Load: 4 Nature of Work: Construct Single-family Dwelling Owner: TIR Corporation Contractor: Same as Owner - TIRCO*052N3 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.C1TTiRF.il TNCPF.fTI(1NC APPR(1VF.n/1)ATF, TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive OffMat to restrict sediment from leaving the site FOOTINGS Setbacks ~ Z ~ ~ 'S ~ ~ S S~ ~~- L. ~' Footings ~~- C.-~ r~~J~-- Forms Reinforcement Interior Footings Porch Piers LIFER FOUNDATION Stem Wall ,,p~ Forms ~ I Reinforcement ~ I ~ Ci3 Anchor Bolts & Washers Beam Pockets Crawl Access Foundation Vents - 8 required 0 own ar ware CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #03A33 .l REnUIRED iN~PE ("TInN4 a ppu ~vFnm n TF ~ FLOOR FRAMING - -- - - _ - -- - _ - _ NOTE: Engineered BCI f loor plan shall be on-site ~~ ~ G~ Joists r Blocking ®a S s ~ ~ Shield under Posts ~~ ~ ~ Girder to Concret Positive Connections /~ Treated Wood to Concrete Gc~.~~~-- Anchor Bolts & Washers PLUMBING ¢~~~. ASH 6lr.~G'i B ~o I t 03 Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain to exterior MECHANICAL ~-.fr;~,~o~ ~ -t 3 LPG Stove Whole house fan , Kitchen Fan (100 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING ~~- ~,,~-Yale ~- f 4~ Walls Roof Rafter positive connection Attic venting -ridge & eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better Air Seal Fresh Air Intake -window ports Fireblocking Weather Resistive Barrier 1 Call 48 hours. before you dig for utility line locates 1-800-424-5555 Page 2 of 4 • • Building Permit #03-033 1 R F (1T TTR FT) TNCPF.f'TTnN4 APPROVED/DATE INSULATION Floor (R-30 ) Walls (R-21) - ___ -- ___ _ -- --- Ceiling (R-38) -- - ----- _-- _ Baffles ~ - - Vapor Barrier -paint 6 mil black poly in crawl space - ~ ~,, ~l-~ ~ _ ~ ~ \ ~ - ~ 1 DRYWALL NAILING ~ Walls ~~`~ a~.,~~~'" ,/ r:,-h~~. °2; Ceiling Enclosed Usable Space under Stairs FINAL Public Works Sign-off LPG House Numbers - 5" numbers Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint. Certificate Smoke Detectors Stairs, Decks & Landings Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #03-033 ~ l 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is repaired. Public Works approval must be received Arior to scheduling the Building Deaartment's final insuection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 City of Port Townsend Building and Community Development Waterman-Katz Building 181 Quincy Street, 5urte 301A, Port Townsend WA 98368 (360) 379-3208 FAX (360) 385-7675 • O~ pOAT TOE ~' y~ ~o ~~~f~- wn TEMPORARY CERTIFICATE OF OCCUPANCY March 15, 2004 through April 14, 2004 Building Permit No.: BLD03-033 Owner: Kathie Meyer Address: 1251 Cleveland Street, Port Townsend Location: Eisenbeis Addition, Block 97, Lot 1 Use(s) permitted: Single-family Residence The above-referenced building or portion complies with the applicable requirements of the Port Townsend Building Code (PTMC 16.04), has passed all required inspections and maybe used and occupied prior to completion and final inspection without substantial hazard, and is hereby granted this Temporary Certificate of Occupancy, provided substantial progress is being made toward completion and final inspection is passed by the date entered above. This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not be removed except by the Building Official. Approved: Building Official Complete Remaining Items for Final 1. Provide 6 mil black visqueen in under floor 2. Paint rusty gas pipe -completed, needs inspection 3. Complete siding ~i~!°y Date (3~- 2z4~f, a,n,~.r ~