HomeMy WebLinkAboutBLD03-028Building azid Community Development
Waterman & Katz Building
181 Quincy Stet Suite 301
PoR Townsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BI.D~3-~2g Issued: 02/28/03 Parcel Number: 984 900 307
Owner: Caitlin Breen Tenant: David Wright Contractor: Tenant
Job Address: 885 G Street Zoning: R-II Type: V-N Occupancy: UU=1
Total Occupant Load: N/A .Nature of Work: Build 140 sg. ft. garden/storage shed with porch.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.(~TTTRF.T) TN~PFCTTnN~
APPRnVF.D/DATF
TEMPORARY EROSION & SEDIMENT
CONTROL
See general condition #2
FOOTINGS -per engineering
Setbacks
f
-
/
Forms ~
~~ .
~ ~ ,~ ,
Q . ~
~~',
~~ - `~`
Reinforcement
Pier Footin s_ _ _ _ __ ___ _ ---
AnchorBolts
-FLOOR FRAMING
Beam r.
Joists -per engineering ~ ~ ~(-°
~
~
~
'~~
Blocking ' 3
~ -
_' ~
~
Post Base
Positive Connection Pier-to-Post
FRAMING
Posts, beams & headers
Windows -safety glazing
Engineered Nailing for Sheathing
Walls
See nett a e
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLD03-028
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING continued
Engineered Nailing for Sheathing
Walls ~-'~
Q ~ t D1 z;10 j
Roof -rafters per engineering . ~ ~
Ceilin s
after Positive Connection
Fire Blocking
e they arner
Gcu4zi ~
FINAL
FinalBuilding l
~/3! 0 J~ T~~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sedunent control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance {see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
•
•
Building and Community Development
Waterman & Katz Building
181 Quincy Street Suite 301
Port Townsend, WA 98368
Phone: (360) 379-3208. Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-028R-1 Issued: 10/01/03 Parcel Number: 984 900 307
Owner: Caitlin Breen Tenant: David Wright Contractor: Tenant
Job Address: 885 G Street Zoning: R-II Type: V-N Occupancy: II=1
Total Occupant Load: N/A Nature of Work: Revision #1: structural changes to garden shed.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: See original permit BLD03-028 for other inspections.
U1KEll1NSPECTIONS APPROVED/DA
FRAMING -see attached engineering
FINAL
FinaUBuilding
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLD03-028R-1
GENERAL CONDITIONS r.
1, Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. .Revisions require review and approval prior to making changes in the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2