Loading...
HomeMy WebLinkAboutBLD03-027Waterman & Kau Building lal Q,;n~y street, suiu 30l Port Townund, WA 98368 P6one:(360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS -CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-027 Issued: 02/27/03 Parcel Number: 948-322-902 Job Address: 706 McPherson Street Zoning: R-III Type: V-N Occupancy: U-1 Nature of Work: Construct 720 square foot Pole Building Carport Owner: Rav Robinson Contractor: Sound Building Systems. Inc. - SOUNDB5027NM @ (360) 301-4957 GENERAL CONDITIONS APPLY -SEE LAST PAGE uF(1TTTRF.T1 TNCPF(''TT(1NC APPRnVFn/1)ATF TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No 2, install on-site as needed during construction -okay to use ~ existing driveway as construction entrance TING ~OO ~~~ S,S-~~ 3 ~ 5 ~ U3 ~~ <--~(-- c Post Footings - (8) per stamped plans; see ~~ C.o,~^~ ~ ~- sheet PFB-03 of plans for details Forms FRAMING .Walls - (8) PT posts; see plans for end wall and truss pole specs Ceiling/Roof -engineered truss plan shall be on-site at time of inspection Blocking Post-to-Truss Positive Connection Corbel Block Connection Other Positive Connections Ridge Connection FINAL ~'J yr ~ 4 s Yed ~ (-~ ~ ~ ' ~ ~ L- ,~ ~ Lv yvt.~r~. Final -Building • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit # BLD03-027 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL} measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. • 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig-for utility line locates 1-800-424-5555 Page 2 of 2 Waterman & Katz Building 18l Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-0278-1 Issued: 05/08/03 Parcel Number: 948-322-902 Job Address: 706 McPherson Street Zoning: R-III Type: V-N Occupancy: U-1 Nature of Work: Revision #1: Install siding and doors Owner: Rav Robinson Contractor: Sound Building Systems, Inc. - SOUNDB5027NM @ (360) 301-4957 GENERAL CONDITIONS APPLY -SEE LAST PAGE Ire. NOTE: See original permit for all other inspections 12F.!)TTTi2F.T) TNCPF.(''TT(1NC APPRnVF,n/17ATF, FRAMING Walls - (8) PT posts; see plans for end wall and truss pole specs Ceiling/Roof -engineered truss plan shall be on-site at time of inspection Blocking F,,~;3 , ~ ~ Post-to-Truss Positive Connection ~ `~ ~ -~~_ ~ L%~ 1 ~ Corbel Block Connection Other Positive Connections Ridge Connection Sheathing -screw schedule per drawing sheet PFB-OS FINAL ;~, ~ ~ ' Final -Building ', ;~ % ; ;' ~_ Es Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit # BLD03027R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries. contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of-way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. S. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduline the Building Department's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2