HomeMy WebLinkAboutBLD03-023.+
r
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360379-3208 Fa:360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MU5T BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-023 Issued: 03/07/03 Parcel Number: 9483-304-504
Job Address: 1924 Holcomb Street Zoning: R-II Type: V-N Occupancy: UU=1
Total Occupant Load: 2 Nature of Work: Detached UnheatedGarage w/ attic storage
Owner: Jim Pivarnik Contractor: Apex Construction - APEXC*OOOCZ
385-4753
GENERAL CONDITIONS APPLY: See below
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF(1TTTRF.T) TNCPF.f'TT[1N4
APPRnVF.I~/nATF,
TEMPORARY EROSION & SEDIMENT CONTROL
Contractor/permit holder shall ensure that dirt and
sediment are not tracked onto City rights-of--way
SLAB
Monolithic Slab Foundation
Setbacks
Forms
Reinforcement
Anchor Bolts
UFER
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 3
~.
Building Permit #03-023
REQUIRED INSPECTIONS
A PPR [1VF.11/n A TF
FRAMING
Walls
Treated Wood to Concrete
Anchor Bolts & Washers
Roof
Rafter Positive Connection
Blocking
Doors & Landings
Fire Blocking
Weather Resistive Barrier
INSULATION
Unheated space
FINAL
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shalt be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing
and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free
of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.
once construction is complete. Applicant is responsible for protection of adjacent properties,
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
i
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
i~`
Building Permit #03-023
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior
to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within sia months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval Qrior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THI5 PERMIT ON-SITE WITH THE APPROVED PLAN5.
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3