Loading...
HomeMy WebLinkAboutBLD03-021* Waterman 8c Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-021 Issued: 04/04/03 Parcel Number: 985 800 701 Job Address: 1775 Fir Street Zoning: R-II Type: V-N Total Occupant Load: 2 Occupancy: U-1 Nature of Work: Construct detached ~araQe/shop with radiant floor heat. Owners: Charles and Lucv Hanson Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFnTTTRFT) iN~PF(~TT(~N~ APPR(~VF,n/nATF, TEMPORARY EROSION AND SEDIMENT CONTROL 'e General Condition No. 2 and attached MIP03-010 gilt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~/~~ ~ ~C /~' ~ Footings fo /z¢1 ~ Forms Reinforcement FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers Alternate Braced Wall Panel Holdowns Treated Wood to Concrete Positive Connections Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit # BLD03-021 REQUIRED INSPECTIONS APPROVF.nmATF j SLAB - - - - _--- R-10Insulation under entire slab Hydronic Floor Tubing G d k Pl bi ~ roun wor um ng / ' ~ Pressure Test ~,/ Pipe Joints Exposed Pipe Bedding ~ ' / C/~ ~ PLUMBING: Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground Pressure Reduction valve required if over 80 psi Hose Bibbs (if applicable) with backflow prevention 18" Above Finished Floor FRAMING Walls Engineered Shear Walls Headers & Beams Treated Wood to Concrete Ceiling/Roof Truss Positive Connection - eng7neered truss plan on- site @ time of inspection Roof Venting - @ eave & ridge Windows U-factor - .40 or better ~-/ NFRC window sticker must be on windows ~ and doors at inspection time /` , Skylights - .58 or better 1 Air Seal Fresh Air Intake (Window Ports) ` Doors U-factq r - .20 or better J _ Fire Blocking Weather Resistive Barrier Alternate Braced Wall Panel INSULATION Slab (R-10 under entire slab ) Walls-(R-11) ~ C, Ceiling - (R-30 ) Bai~les Vapor Barrier: paint ~ ~` Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permit # BLD03-021 RE UIRED INSPECTIONS APPROVED/DATE DRY WALL NAILING _.-- -,-.~_ ,~, ~~ Walls - ~ j ~,/ - ` eiling _....._ U ,r FINAL Public Works Sign-Off House Numbers - 5"minimum Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall 6e permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility hne locates 1-800-424-5555 Page 3 of 3