Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD03-019
r CITY OF PORT TOWNSEND Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend. WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-019 Issued: 03/04/03 Parcel Number: 972 900 701 Job Address: 136151" Street Zoning: R-I Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 6/2 Nature of Work: Construct single-family residence with attached garage. Owners: Michael & Laurel Dawson Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: All elements of engineering require inspection prior to cover i2F(ITTTRF.II 1NCPF.f TT(1NC APPRnVF.n/nATF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive OffMat to restrict sediment from leaving the site TINGS SOO ~~ ~ ~ 1 ~ 6 3 ~2,- Cr~ ~- /,/ ~ c Footings ~ ~Kr C~c~~`~' i_.~- ~ `~ ~ ~~ 3 ~ ~ `~ J ~ 3 / Forms ~ Reinforcement Interior Footings Porc ec iers 6 ~ S - 16 -~ ~ ER • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 p«mc#sinos~s REQUIRED INSPECTIONS APPROVF.n/nATF. FOUNDATION Stem Wall S ~ ;, Forms ~ Q Reinforcement 3~ z~ ~ 03 Anchor Bolts & BP washers ~ U- Vents -11 required Crawl Access r~ Alternate Braced Wall Panel Holdown Hardware C~ ~""~'' ~~ SLAB (@ garage) Setbacks Monolithic Foundation Reinforcement Alternate Brace Wall Panel Holdown Hardware FLOOR FRAMING Joists Beams -per engineered drawings (GL, SS or #1) Blocking Positive Connections Treated Wood to Concrete Anchor Bolts & Washers `,,.y, ~ ~~( tv/ PLUMBING: Pa h ~- t a. ~ a~ 5 p w a.a ~ x'`14 ~ ~ Rough-In (D-V-T & Clean outs) --~-__,,. ~ ~ ~yy~ ~ W l S < ~ 3 ater y upp Gas Supply ~ of /-t-ou S~G~ cs fC- ~ j10~0.3 Water Hammer Arrester @ clothes & dish shers ~.1 suP~~ ~ ~ 1~uS~ ~ ©~-- ~ 7103 Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint -strap tank @ 1/3 points 18" A. F. F. Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole house fan -Attic LPG Boiler - provide specs on-site Wood Stove Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers}, insulation (R-4) and terminus (located 3' from openings) Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 __ J +, R F (1T TTR F.T) TNCPF (1'TTnNS • Permit # BLD03-019 APPROVED/DATE FRAMING s-13-0 3 1 ~sp~ED G n,a o e ~Ar~ @ Walls ~~ ceds.r ('os ~ Q~., Engineered beams Ceilings/floor Roof Blocking L ' Rafter Positive Connections Roof Venting - eave and ridge vents , , ~ Windows -escape ~~- r Windows -safety glazing Windows Ufactor - .40 or better for unlimited glazing NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake -Window ports Doors U-Factor - .20 or better/Rated doors @ garage/house Air Seal Fire Blocking Weather Resistive Bamer INSULATION ~ ~ ~ /~ ' ~ / ~ --; Floor (R-30) ~ ~ ~ s ~ , ~ ~ Walls (R-21 ) Ceiling (R _3 8 ) Vapor Barner: paint Baffles 6 mil black poly DRY WALL NAILING Interior braced wall panels ,~~ ,~~ '~' _-T ~~ ~ ~~, Walls `~ Ceiling __ ____. ____ _~.-___-, _._ arag ous~rkshop Occupancy~eparation ~~ -~ ~ E F t ~ =t 1 ~ _ . ~ FINAL Public Works Sign-Off , ; ., ~~ ~ ~, , LPG -- ~-r%~,~%s, ~ n~-~ 7,~ ~~: _ r~,~ : ~ t1 ~ ~J Wood Stove ' ~ House Numbers - 5" minimum i v Plumbing MechanicaVHeating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 # Brar~ro~s ,~ ENERAL CONDITIONS 1. Contractors working bn this project are required to have a Labor & Industries contractor's registration number .and a City business license. Failure to ptovide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of sik fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shag be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced welt panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any. and all deficiencies noted by required inspections. 5. Re-inspection is requirted after inspection report corrections are completed. • 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to scheduling the Building Department's final inspection. - 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department. (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 Waterman & Katz Building l81 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 I1 t~J ~u CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-019R-1 Job Address: 1361 51s` Street Zoning: R-I Total Occupant Load: 6/2 Issued: 04/22/03 Parcel Number: 972 900 701 Type: V-N Occupancy: R-3/U-1 Nature of Work: Revision #1: Increase garage and front porch roof pitch to 8:12; reduce deck size to 3 x 7, wall framing studs now 24" o.c., enlarge living room and bedroom windows as shown on plans. Owners: Michael & Laurel Dawson Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: All elements of engineering require inspection prior to cover NOTE: see original inspection record BLD03-019 for other inspections. R F(lT TTR Fil TN4PF f'TT()N4 APPRnVF,n/nATF. FRAMING Enlarge living and bedroom windows Wall framing @24" o.c. Reduce deck dimensions FINAL See original inspection record. C~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 __ r ~- Permit # BLD03-019 ENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements hive been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residentialproject. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at .least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page Z of 2 ~\ --- .-:- ... _ t