Loading...
HomeMy WebLinkAboutBLD03-017----~ i Waterman & Kstz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone:360-379-3208 Fs:360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-017 Issued: 02/24!03 Parcel Number: 948 312 006 Job Address: 1313 16th Street Zoning: R-II Type: V-N Occupancy: RR=3 Total Occupant Load: 5 Nature of Work: Set New Manufactured Home; see BLD03-017R-1 for detached carport. Owner: Douglas Stuart Contractor: A&R Construction - WAINS#0641 (360) 895-1268 ****Installer: See Attached Installer Tag**** • ~~ GENERAL CONDITIONS APPLY -SEE LA5T PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.OTTTRET) TN~PF.C".TTnN4 APPRnVED/DATE TEMP EROSION & SEDIMENT CONTROL See general condition #2 and attached details with Street Development Permit SDP03-008 Silt Fence as needed Drive Off Mat to prevent sediment from leaving the site FOOTINGS/SLAB ~ ~ l ~' ~ ~ ~' ~~~~~ rv ~ ~ Setbacks Forms ~G' Cz ~ ~~ ~.~ C ~- ~~~ GOr~ ~~~,,- Reinforcement FLOOR FRAMING (prior to skirting) ~ ~ Anchors ~~-c./~ ~ vc.~4 . ~ ~ ~ ~~ Steel Support Piers -Load-stamped and installed ll l l ' ,~ ~ ~ ~, ~ ~ ~~? ~ ~ v3 s insta ation manua ; c earance per manufacturer ~^ of 18 "min. from lowest point of I-beam and the ~~ ~-- ~- ~' ~ >~~ `Jh/ ground or footing for min. of 75% of area under home w/ 12 "min. elsewhere unless installation manual specifies; otherwise area around home aded to rovide runo aw om home Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit #BLD03-017 REQUIRED iNSPECTinNS APPR(1VF.n/nATF. ' PLUMBING: Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior. to connection to home, min. 3/~ "diameter, same as supply pipe Pressure Reduction Valve if > 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s.i. for IS minutes Pressure relief valve drain - to exterior of skirting, exhaust dowmvard between 6"and 24"above ground Drainage Piping -sloped min. '/.r' per foot MECHANICAL Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl space requires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length of ducting not to exceed 14' w/ 2-90° elbows FRAMING: Entry Porch VAPOR BARRIER 6 mil black poly ground cover (not required where area under home is concrete slab floor with a minimum thickness of 3-% inches) FINAL Public Works Sign-Off Electrical (L & I) Sign-Off House Number -minimum 5" numbers Plumbing Mechanical ~ ~ Final -Building No holes or gaps greater than '/r "allowed in skirting. Crawl space ventilation per installation manual @ d I/150 (IS required.); located close to corners, on at least ~ ~' L two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home; minimum 18" x 24 "; covered with vinyl, pressure treated wood or metal. i L Call 48 hours before ou di for utili line locates Y g tY 1-800-424-5555 Page 2 of 3 a Permit #BLD03-017 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. Alt building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. I0. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before ou di for utili line locates Y g h' 1-800-424-5555 Page 3 of 3 t • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-017R-1 Issued: 02/24/03 Parcel Number: 948 312 006 Job Address: 1313 16th Street Zoning: R-II Type: V-N Occupancy: U_l Total Occupant Load: 1 Nature of Work: Construct Detached Caruort for SFR Owner: Douglas Stuart Contractor: A & R Construction - ARCON**066Q5 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: for other inspections, see BLD03-017 RF.[1TTTRF.TI TNCPFf'TT(1NC APPR(1VF.T)/17ATF. FOOTIN Se Footings -Per attached engineering, min. 2 feet below grade Forms '~ i~~G 0)Z = (S - 9- X23 Reinforcement Piers - 24" x 24" x 6"per engineering surrounded by compacted sand in 12 "lifts SLAB -optional 4" concrete slab with fibermesh reinforcement FRAMING: " " x 6 HF# 1 posts Walls -pressure treated 6 Post-to-Beam Connection -Simpson PC66 Engineered Joists: ~ ~ 2 " x 6" @ 16" o. c. DF #2 " " " S' i6 .,~ @ 16 o.c. DF#2 Roof - 2 x 6 Engineered Sheathing - 7/16" OSB w/ 8d nails @ 6 " o. c. ; edges 12 " o. c. Beams Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit #BLD03-017R-1 ' FINAL Final -Building IN 6 k-T~- 6 •2f.-~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Buildin De artmen i g p t s unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. 10. Revisions require review and approval prior to making changes to the approved plans. Contact the Building Department at 379-3208 prior to making changes to the approved plans. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2