HomeMy WebLinkAboutBLD03-017----~
i
Waterman & Kstz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone:360-379-3208 Fs:360-385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-017 Issued: 02/24!03 Parcel Number: 948 312 006
Job Address: 1313 16th Street Zoning: R-II Type: V-N Occupancy: RR=3
Total Occupant Load: 5
Nature of Work: Set New Manufactured Home; see BLD03-017R-1 for detached carport.
Owner: Douglas Stuart Contractor: A&R Construction - WAINS#0641
(360) 895-1268
****Installer: See Attached Installer Tag****
•
~~
GENERAL CONDITIONS APPLY -SEE LA5T PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.OTTTRET) TN~PF.C".TTnN4
APPRnVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See general condition #2 and attached details with
Street Development Permit SDP03-008
Silt Fence as needed
Drive Off Mat to prevent sediment from leaving
the site
FOOTINGS/SLAB
~ ~ l ~' ~ ~ ~' ~~~~~ rv ~ ~
Setbacks
Forms ~G' Cz ~ ~~ ~.~ C ~- ~~~ GOr~ ~~~,,-
Reinforcement
FLOOR FRAMING (prior to skirting)
~
~
Anchors ~~-c./~
~ vc.~4 . ~ ~ ~ ~~
Steel Support Piers -Load-stamped and installed
ll
l
l
' ,~ ~ ~ ~, ~ ~ ~~? ~ ~ v3
s insta
ation manua
; c
earance
per manufacturer ~^
of 18 "min. from lowest point of I-beam and the ~~ ~-- ~- ~' ~ >~~ `Jh/
ground or footing for min. of 75% of area under
home w/ 12 "min. elsewhere unless installation
manual specifies; otherwise area around home
aded to rovide runo aw om home
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit #BLD03-017
REQUIRED iNSPECTinNS APPR(1VF.n/nATF. '
PLUMBING:
Water Supply -Main shut-off valve (port or ball valve)
installed in water supply piping prior. to connection to
home, min. 3/~ "diameter, same as supply pipe
Pressure Reduction Valve if > 80 psi
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 p.s.i. for IS minutes
Pressure relief valve drain - to exterior of skirting,
exhaust dowmvard between 6"and 24"above ground
Drainage Piping -sloped min. '/.r' per foot
MECHANICAL
Ducts & Duct Insulation
Dryer Exhaust -vented to outside. Extension into crawl
space requires venting through skirting with no dips;
follow dryer manufacturer's instructions; total combined
length of ducting not to exceed 14' w/ 2-90° elbows
FRAMING:
Entry Porch
VAPOR BARRIER
6 mil black poly ground cover (not required where area
under home is concrete slab floor with a minimum
thickness of 3-% inches)
FINAL
Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number -minimum 5" numbers
Plumbing
Mechanical
~ ~
Final -Building
No holes or gaps greater than '/r "allowed in skirting.
Crawl space ventilation per installation manual @
d
I/150 (IS required.); located close to corners, on at least ~ ~'
L
two opposing sides for cross ventilation.
Crawl space access must provide access to all areas
under home; minimum 18" x 24 "; covered with vinyl,
pressure treated wood or metal.
i
L
Call 48 hours before ou di for utili line locates
Y g tY
1-800-424-5555
Page 2 of 3
a
Permit #BLD03-017
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. Alt building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
I0. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before ou di for utili line locates
Y g h'
1-800-424-5555
Page 3 of 3
t
•
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-017R-1 Issued: 02/24/03 Parcel Number: 948 312 006
Job Address: 1313 16th Street Zoning: R-II Type: V-N Occupancy: U_l
Total Occupant Load: 1 Nature of Work: Construct Detached Caruort for SFR
Owner: Douglas Stuart Contractor: A & R Construction - ARCON**066Q5
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: for other inspections, see BLD03-017
RF.[1TTTRF.TI TNCPFf'TT(1NC
APPR(1VF.T)/17ATF.
FOOTIN
Se
Footings -Per attached engineering, min. 2 feet
below grade
Forms '~
i~~G
0)Z
=
(S
-
9- X23
Reinforcement
Piers - 24" x 24" x 6"per engineering
surrounded by compacted sand in 12 "lifts
SLAB -optional
4" concrete slab with fibermesh reinforcement
FRAMING:
"
"
x 6
HF# 1 posts
Walls -pressure treated 6
Post-to-Beam Connection -Simpson PC66
Engineered Joists: ~ ~
2 " x 6" @ 16" o. c. DF #2
"
"
" S' i6 .,~
@ 16
o.c. DF#2
Roof - 2
x 6
Engineered Sheathing - 7/16" OSB w/ 8d
nails @ 6 " o. c. ; edges 12 " o. c.
Beams
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit #BLD03-017R-1 '
FINAL
Final -Building
IN
6 k-T~-
6 •2f.-~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Buildin De artmen i
g p t s unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
10. Revisions require review and approval prior to making changes to the approved plans. Contact the
Building Department at 379-3208 prior to making changes to the approved plans.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2