Loading...
HomeMy WebLinkAboutBLD03-016Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BI.D~3-~16 Issued: 02/24/03 Parcel Number: 948 333 704 Job Address: 1080 McPherson Street Zoning: R-II Type: V-N Occupancy: R-3 Total Occupant Load: 3 Nature of Work: Construct single-family residence; see BLD03-016R-1 for detached ag rage. Owner: Hometown Construction, Inc. Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS A PPR ()VFn/nA TF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS '~'~ ~~- Setbacks ~_~> , ~ - ~. Footings Forms - Reinforcement ~-~," ~' Interior Footings Porch Piers LIFER • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Permit # BLD03-016 REQUIRED INSPECTIONS APPROVF.n/nATF, FOUNDATION Stem Wall Forms Reinforcement Alternate Braced Wall Panels ~~ Positive Connection Post-to-Foundation Wall ~ ~J Anchor Bolts w/ 2" x 2" x 3/16" washers C 6 C L, Foundation Vents - 6 required ~ ~ ~21~~ Crawl Space Access ~ Simpson Strong Wall Panels -install per manufacturer's installation instructions FLOOR FRAMING i 3 ~ 2~ ~~3 G rders Joists ~ a S~ Blocking ~ ~L Shield under Posts C-o ~ J~ Positive Connection ~~ Girder to Concrete Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/I6" washers PLUMBING: Rough-In (D-V-T & Clean outs) ©~ c~ /~ l~ ~ / L Water Supply Water Hammer Arrestor @ clothes washer and dishwasher Hose Bibs (backflow rotection re wired) Pipe Insu ation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole -Second Floor B Source Specific Fans Environmental Air Exhaust ducting (w/back draft ©~ ~ O c~ 0 ' 3 dampers), insulation (R-4) and terminus (located 3 from opening into building) Ca114S hours before you dig for utility line locates 1-800-424-5555 • ~~ • Page 2 of 4 Permit # BLD03-016 RF.nTTTRF.TI TNCPF.f TTnN~ APPRnVED/DATE r FRAMING 'Walls Ceilings Roof -Engineered LPI rafter plan to be on-site at time of inspection Rafter Positive Connection Attic Venting -see # 77 on Plan Review Checklist Windows -escape Window safety glazing {` ~~'~ f~, f ~ ~ f~~,•; Windows Ufactor - .40 maximum ~ NFRC window sticker must be on windows at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-Factor - .20 maximum Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30) ` ~~` ~~`.~ ~~ ~ ~`~ ,_, Walls (R-21) '~ Ceiling (R-38 in flat & scissor truss, R-30 in vault) Baffles _ _~-___-____ _ _._ ._ _.__ _______~__._~_--_ .~..~..~ .~Y ~__._.....~._.___. `Vapor Bamer~°Tow perm. paint --~ ~' _.~' ~ _ ~~ _ _ Crawl space --~6 =miTbTack poly ~~ ~ ~ DRY WALL NAILING Walls /'~~ ~ ~~ / ~ Ceilings ~.~'' , J ` ~~ ~ f~~j; Enclosed Usable Space Under Stairs FINAL Public Works Sign-Off ~ House Numbers - S "minimum ~ ~ ~-'~'~ Plumbing -,G~' MechanicaUHeating %' ~ Insulation Certificate ~ ~ ~ v Vapor Barrier Paint Certificate Smoke Detectors Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page3of4 Permit # BLD03-016 ~ .N . A ONDITION~ 1. Contractors working on this project are re wired to have a Labor & Industries contractor's re istration J q g number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; cal1385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements.. of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the`Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-016R-1 Issued: 02/24/03 Parcel Number: 948 333 704 Job Address: 1080 McPherson Street Zoning: R-II Type: V-N Occupancy: U-1 Nature of Work: Construct 294 sg. ft. Garage accessory to Single-Family Residence (BLD03-016) Owner: Hometown Construction Contractor: Same as Owner - HOMETC1994CL GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.()TTTRF.n TN~PF,("TTnN~ APPR()VED/DATE TEMPORARY EROSION & SEDIlVIENT CONTROL See General Condition No. 2 FOOTING ~ ~ ~ ~' ~ °`"~' ~"'`~ Setbacks ~, - ~ t, Y~ Footings ~ ~. L_ Forms ~ ~ i` `~'•L~ Reinforcement ~-, ~ ~ , LIFER FOUNDATION ~ Stem Wall ~ ~ ~v ~'~'~~ Forms ~ ~ ~\ ~~~.~ Y Reinforcement ~ ~~"~ Anchor bolts w 2"x 2" x 3/16" washers - 5/8" @ 3 feet o.c. ,~^ "~~• ~ r~ per engineering @ sheer walls Engineered Holdowns FRAMING ~ ~,~~ ~,,;~° '~ "' t s.~'(~- 'f `: ~~ Walls c"'C. ;~, ~Z-ilc4 ~ Engineered Shear Walls Treated Wood to Concrete ~~ Anchor Bolts Ceiling/Roof -engineered truss plan shall be on-site at inspection time ~"~~ ,. - Truss Positive Connection `" Blocking Weather Resistive Barrier Alternate Braced Wall Panels per engineering Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemut #BLD03-016R-1 FINAL Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Z. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing,. holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2