Loading...
HomeMy WebLinkAboutBLD03-013Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-76'75 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-013 Issued: 02/05/03 Parcel Number: 001 013 001 Job Address: 380 Jefferson Street Zoning: M-II Type: V-N Occupancy: B Total Occupant Load: No Change Nature of Work: Interior remodel of Cupola House -build walls to create library space; add electric baseboard heat; insulate "Programs" space and add built-in storage. Owner: Port of Port Townsend Tenant: Wooden Boat Foundation Contractor: Tenant GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF,OIJIRED INSPECTIONS APPROV~D/DATE FRAMING -barrier free design required Walls 2~~ ~~~ Positive Connections ili ~ ~ S~~ ~~,-- ~ o ~, G- ng Ce Bl ki - <- ~ a /~ ~ ng oc i - ~ ~- Fire Blocking INSULATION - "Programs" space ~ i3C C 3 Walls Ceiling ~ u S S z~ ~ ~. L~ 1.-- ~ ,~ ~(~- DRYWALL ~?~ l Z-~~tj~ Walls '~ t Ceiling ~ Ct S S-t }~" ~-- '" ` - i~ w ~ v~- LIGHTING See prescriptive compliance, attached • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit #BLD03-013 FINAL Property address posted -min. S"numbers Fire Department Sign-Off Electrical Sign-off (I, & I) Barrier Free Access Thresholds p ~- Door Clearances Lever Hardware ~~ Exit S~gnage & Illuirunation ~ i ~"l~ Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all. deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call- for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2