HomeMy WebLinkAboutBLD03-011~ ~
Waterman & KatzBuilding
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-011 Issued: 02/13/03 Parcel Number: 958 900 010
Job Address: 4948 Mason Street Zoning: R-I Type: V-N Occupancy: R-3/U-1
Total Occupant Load: 6/2
Nature of Work: Construct single-family residence with attached garage on Lot l0 of Hensel Subdivision
f,.
Owners: Jack and Marsha Hensel dba Hensel Investments Contractor: Seven Bridges Property, LLC -
SEVENBP983JD
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Outside construction activities shall be limited to Monday through Friday 7:00 a.m. to 6: 00 p.m.
and prohibited on weekends and national holidays
RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See Engineered TESC plan & MIP03-005
Silt Fence
Drive Off Mat to restrict sediment from leaving the site
TING5 'a S ~
~-~ ~- f ~ ~~
Sebac .
~
Footings ~~'"~ C..-. L. ~~,
Forms C~~ ~-
Reinforcement
Interior Footings
Porch Piers
UFER
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit # BLD03-011
REQUIRED INSPECTIONS APPRnvF,nmATF,
FOUNDATION
ll
W
21103
Stem
a
Forms Y d S t~
Reinforcement ~- C(_
Anchor Bolts & BP washers
~ ~,
Vents -19 required ~,--.yo/~e.
Crawl Access
Engineered Holdowns
SLAB -non-structural
Engineered Holdowns
FLOOR FRAMING
Girders
Beam Pockets
~~k
Shield under Posts
Joists - BCI plan shalt be on-site at time of inspection
Blocking ~~
Positive Connections
x'26-°3
Treated Wood to Concrete
PLUMBING:
Rough-In (D-V-T & Clean outs) ~ ~ 2~ (~3 ~ ~ jh1 Zb~C33
Water Su 1
~
Gas Su 1
Water Hammer Arrester @ clothes & dishwashers JO1 ~"'
~'0\
Hose Bi kflow rotection re wired -
~' a S~ ~ <-~-
Pipe Insulation (R-3) ~, ~,
Pressure Reduction Valve if > 80 psi ~a~~ ~- ~'°'~ ~•
Water Heater ,~o1G iv ~,~ b~
Seismic Restraint -strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL ugr -c-i G. o ~- 10 'z b 3
LPG Fireplace
Electric Heat Pump
Manufacturer's installation instructions to be on-site @ time of
inspection.
Ducts & Duct Insulation -Supply/fresh air ducts in conditioned
space: R-4; heating ducts in unconditioned space: R-8
LPG Fireplace -provide specs on-site
Source Specific Fans
See nett page
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page2of4
i
1 ~'
Permit # BLD03-011
•
RF(lT1TRF.lI TN4PFf'TTnN4 APPROVED/DATE
MECHANICAL Continued
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and terminus (located 3' from openings)
Whole House Ventilation
HVAC Integrated Fresh Air
7" Smooth Duct minimum
Terminal Element - 8"
Clock timer on furnace fan
Other than motorized damper requires letter of certification
for flow rates.
FRAMING ~c"~~--_ ~~=r~~? _ ~.,,r~-~~_~ ~' ~~t.e=~ l~'~o~- °°rD ~ ~P~a
Walls
Engineered Shear Walls
Roof -Engineered truss plan to be on site at inspection
Blocking
Truss Positive Connections
Roof Venting - eave and ridge vents
Windows -escape
Windows -safety glazing
~~ j~`F;~-~ f
~~'~~ r
~ ~ ~ ~
F
~ ~ ~~'
Windows Ufactor - .40 or better for unlimited glazing ~-
-
!
NFRC window sticker must be on windows &
doors at inspection time
`-b
tt
'
€
t
~-$-
Sk
~
er
ae
~-- :
rn
e
ye-
-
Fresh Air Intake - HVAC Integrated option
Doors U-Factor - .20 or better/Rated doors @ garage/house
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
~_.. _ . , ._.. ` r
_
.r-~--R-~-)---___ _.._ ~
f
~ ~ -
,,,-{~:
'
1 fi _
~;
r/ ~ ~
~
,
{
;~
Walls (R-21) .
_ _ __~._ _____
Ceilm ~$
V or Barrier paint
__.________ __ ___ r_ ,- _ _
,.,
Baffl~s.~~ c ~"` ` " ~ ' `
_.. ~.
._,^ ~r_ __~ _
~.
6 mil black poly
DRY WALL NAILING
~
Walls
' f
' ~ ~
~ ~,
neerin
Interior shear walls er en
P g1 g J
~
~
_ 1
~
Ceiling
Garage/House Occupancy Separation , ~;
~ l` `' -'~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
.~ _ ~
RE UIRED INSPECTIONS APPROVE
FINAL
Public Works Sign-Off
LPG
House Numbers - 5" minimum
Plumbing (`~
MechanicaUHeating (~
Vapor Barrier Paint Certificate ~ J
Insulation Certificate _ ~,
Fresh Air Certification for Integrated System ~` V
Smoke Detectors
Final -Building
P«~t a B~o3-o> >
iATE
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; calf 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works anaroval must be received urior to
scheduline the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Cail 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4