Loading...
HomeMy WebLinkAboutBLD03-009Waterman and Katz Building 181 Quincy Street Suite 301 Pori Townsend, WA 98368 Phone (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO3-OO9 Issued: 06/05/03 Parcel Number: 974 101 501 Job Address: 504 Root Street Zoning: R-II Type: V-N Occupancy: U_1 Total Occupant Load: N/C Nature of Work: Add 81 sq ft of unheated greenhouse/storage space onto existing 120 sg. ft. shed. Owner: Jennifer Blomgren Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF(liT1RF.Tl TN.CPF.(~'TT(lNC APPROVFD/DATF FOOTINGS Setbacks Forms Reinforcement Pier Footings `~ ~ -,;`: ~, ~, r , r ~ . <~~ ~ ,., ~'~ ~ -~ ~ ; . ~ ,• ~. , r ~ ° ~~r,,•~: ~.. c-:- ~'~ ~~~ : • ~ ,y ~ r-'! ~~=! ti-r:~r~ ,~~,.i~~ ~ ~ ~ r ~~ ~- ~- , ~ -,~ ~. ~~ f- ; , , , FLOOR FRAMING ~` ~~ Girders • t A_-, ~ ~ ~~ ~ ~#_ < : ~ ,~- ~.r Joists Blocking ~ ~ ~ ~~' ~ Post Base ' ~ ~ ~ , r ~ t_t-~ t Positive Connection Girder-to-Post _ -1 ;', ~-j~ ~ -~ FRAMING: ' Nailing for Ledger & Sheathing Walls Roof /Ceiling Rafter Positive Connection Blocking Weather Resistive Barrier • <; Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD03-009 ECTIONS APPROVED/DATE FINAL House Numbers - (House and ADU) Min. 5" high Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted t~ required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2