Loading...
HomeMy WebLinkAboutBLD03-008e Waterman & Katz Building 181 Quincy St., Suite 301 Port Townsend, WA 98368 Phone (360) 379-3208 Fax: (360) 385-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection CITY OF PORT TOWNSEND Permit Number: BI.D03-~~8 Issued: 01/15/03 Parcel Number: 989 700 804 Job Address: 821 Water Street Zoning: C-III Occupancy: No Change Type:,, No Change Total Occupant Load: No Change Nature of Work: Repair and replace torchdown roof, add insulation as needed (see below). Owner: Doug Hankins Business: Maestrale Contractor: Hope Roofing - HOPER*043N7 NOTE: all roofing materials to be installed per manufacturer's specifications and UBC Chapter 15 GENERAL CONDITIONS APPLY -SEE LAST PAGE ..~ RF.CITTTRF.TI TNCPF('TT(1NC A PPR (1VF.i)/n A TF, PEDESTRIAN PROTECTION Provide protection per UBC as needed during construction. See attached handout including Table 33-A for type of protection needed based on construction height and pedestrian distance from construction. SEDIMENT CONTROL Rights of way shall be kept free of dirt and debris and swept as needed during construction. DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. INSULATION If: the roof sheeting is being replaced, the roof membrane is removed, exterior insulation is removed, or no insulation exists, the roof over a heated space must be insulated to the following. values: Electric Heat: R-38 for roofs over attic, R-30 for other roofs Other Fuels: R-30 for roofs over attic, R-21 for other roofs Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 R F.(1T TTR F.T) TNCPF f TTnN~ ~. Permit #BLD03-008 APPRnVF,n/nATF. SHEATHING/NAILING (if applicable) 7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1 3/4" staples @ 6" o.c. edges and field. ROOF VENTING 1 sq. ft, for 150 sq. ft., or 1 sq. ft. for 300 sq. ft. if SO% of vents are located at least 3 ft. above eave or cornice or a permanent vapor barrier is installed on warm side of attic insulation. ROOF DRAINAGE Roof drains shall be sized and discharged in accordance with the Uniform Plumbing Code. See attached pages from Appendix M of the WA State Amendments of the UPC. FINAL Building Numbers - 5" numbers of contrasting color posted near main entrance of building and visible from street Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's • registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. If your project included he Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Pennit #BLD03-008 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3