Loading...
HomeMy WebLinkAboutBLD03-003,,,r Waterman & Katz Buildi~ 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360379-5086 Faz 360385-7675 CITY OF PORT TOWNSEND • U • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-~03 Issued: 04/11/03 Parcel Number: 952 700 009 Job Address: 9 Kanu Drive Zoning: R-II Type: V-N Occupancy: R-3 Total Occupant Load: 11/2 Nature of Work: Construct Single-family Dwelling with attached garage Owner: Charles & Kathryn Knight Contractor: B&D Construction - BDCO 35N8 r GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: No construction activity shall be allowed within the twenty-five foot setback area (i. e. heavy eonstr~tction equipment must work from the upland side of the setback.) RF.(lT1IRF.n INSPF.C.'TinNS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General ~'ondition No. 2 ~ , < Silt Fence as needed ~ ~ ~ m-'' ~'` ~~ Drive Off Mat to restrict sediment from leaving the site FOOTINGS -per engineered details ~ ,-;-~ ,~, ,~ ~. ~-_~ ,r ~ ,, {~ ~' /~,r ~f.~~ °< Setbacks - Footings Forms Reinforcement -per engineering . , _ _ _ __ _ _ __ ._ Interior Footings 'v ~' ° '`~~J `~ ~ ~ ~~ ~~~ Porch Piers . Deck_._~,---__.._ __ _ __ ___.__ ~ _ _____ LIFER CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 Building Permit #03-003 {`' REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION -per engineered detail; all elements of engineering require inspection prior to cover Retaining Wall ~c~- O ~~ (,~llq~a 3 _~` - I Stem Wall - Forms Reinforcement -per engineered detail ~ ~,,~q( c~` Anchor Bolts & Washers -per engineering ~ ~ ~~ ~ ~ Post to Foundation Wall Positive Connection ~~ ~ S ~ 3 ~ t y, ~ ~, Engineered Holdowns ~~~ ~ ~ cam. SLAB ~~~, Interior footings h i ~ l~ ~' ) Anc or Bolts -per eng neering ~ 7 / v Engineered Holdowns G - FLOOR FRAMING NOTE: Engineered TJI floor plan on-site and available to the Inspector at inspection time Joists ~ ~ l1 z C1 ~ ? Blocking Positive Connections ~~ gG.l ~~~ ~~~ (, ~~ ^"` Treated Wood to Concrete Anchor Bolts & Washers PLUMBING (~, Z~-c~3 v ~ (~ L~:r.~n b Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground `J Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Building Pennit #03-003 RF.()TTTRF.T) TN4PF.f'TTnN4 • ~~ APPRnVF.n/DATF MECHANICAL LPG Stove /Fireplace - provide specs on-site Wood Stove Electric Heat Pump Manufacturer's installation instructions to be on-site @ time of inspection. Ducts & Duct Insulation -Supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventilation HVAC Integrated Fresh Air 7" Smooth Duct minimum Terminal Element - 8" Clock timer on furnace fan Other than motorized damper requires letter of certification for flow rates. Whole house fan - HVAC Integrated option Source Specific Exhaust Fans @ bathrooms (SOcfin), laundry room, (50 cfm) and kitchen (100 cfin) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) ,_ FRAMING ,_ , v~~c ~, ~~-._ .~~,_~~.<_~ ~-~~~::.-~ ~, 2~ ~ ,~' y Walls -framing per shear wall designations '~ ~ Engineered shear walls Interior shear walls Shear Panel Blocking Roof -Engineered truss plan to be on site at inspection Truss positive connection Attic venting -ridge & eave Posts, beams and headers-per engineering -~:~~'~~_=-~ ~~~~~` ~-i~~l~~~.. ,! t~~~~-~_ Windows -escape f l i Wi d `'~ t ~~ ~ ~, '~ f2 -t ~' `_,_ ` _~ ~ ~ / az ng n ows -sa ety g ~ - ~ Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal Fresh Air Intake -Integrated Fireblocking Weather Resistive Bamer Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Perntit #03-003 RE UIRED INSPECTIONS APPROVED/DATE INSULATION Floor (R-30) ©(~ 10/Z~ /03 Walls -21 Ceiling (R-38 ) Ba es apor amer -paint 6 mil black poly in crawl. space DRYWALL NAILING Walls Ceiling Enclosed Usable Space under Stairs ~ Garage House Occupancy Separation i FINAL Public Works Sign-off LPG Wood Stove House Numbers - 5" numbers Plumbing MechanicaVHeating Insulation Certificate !~ Vapor Barrier Paint Certificate Fresh Air Certification for Integrated System Smoke Detectors Stairs, Decks & Landings Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. • i Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 g Building Permit #03-003 ~- 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 ~- t