HomeMy WebLinkAboutBLD03-001~ Waterman & Katz Building
181 Quinsy Street, Suite 301
Port Townsend, WA 98358
Phone: (350} 379-3208 Fax: (360} 385-7575
CITY of PORT Tov~vsE~rD
~-- ~ ~'~ CONSTRUCTION PERMIT & INSPECTION RECORD
ca THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BI.D03-~~1 Issued: 01/22/03 Parcel Number: 957 312 601
Job Address: 1914 Clav Street Zoning: R-II Type: V-N Occupancy: R-3
Nature of Work: Foundation repair and installation of new footings, interior stemwall, and foundation
cripple walls under existing residence.
Occupant Load: No Change
Owner: Diane Gusset Contractor: Goldenberg Construction - GOLDEC*075NC
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS APPRO
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 -install on-site as needed during
construction to prevent sediment from leaving the site and to
eliminate tracking of soil onto the street
~"~ _
All construction debris shall be deposited in the Jefferson
l'ounty Landfill in accordance with all state and local laws
FOOTIlYGS
Setbacks -existing
Footings
Forms
Reinforcement
Irrterior footings
FOUNDATION
Forms
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Vents
Crawl space access
Girder to Concrete
Positive Connection
Treated Wood to Concrete
Shield under Posts
6 mil black poly _
i ~~/~
t~~r~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pem~it#BLD43.OQ1
RE 'UIRED I1~SPECTI01~5 AppROVEDIDATE ~-~~_
FINAL
House Number -check for 5" numbers
Smoke Detectors throughout existing house per 1997
UBC
Final -building
GENERAL CONDTfIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by squired
inspections. ----~
S. Re-inspection is required after inspection report corrections are completed. ~~
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is reauired Public Works approval must be received prior to
scheduhne the BuildmQ Department's final inspection
". Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within sia months, or if no inspections are done
try the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
--_~
Ca1148 hours before you dig far utility line locates
1-800-424-5555
Page 2 of 2
. ~ ; ~ >~.