Loading...
HomeMy WebLinkAboutBLD03-001~ Waterman & Katz Building 181 Quinsy Street, Suite 301 Port Townsend, WA 98358 Phone: (350} 379-3208 Fax: (360} 385-7575 CITY of PORT Tov~vsE~rD ~-- ~ ~'~ CONSTRUCTION PERMIT & INSPECTION RECORD ca THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BI.D03-~~1 Issued: 01/22/03 Parcel Number: 957 312 601 Job Address: 1914 Clav Street Zoning: R-II Type: V-N Occupancy: R-3 Nature of Work: Foundation repair and installation of new footings, interior stemwall, and foundation cripple walls under existing residence. Occupant Load: No Change Owner: Diane Gusset Contractor: Goldenberg Construction - GOLDEC*075NC GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPRO TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving the site and to eliminate tracking of soil onto the street ~"~ _ All construction debris shall be deposited in the Jefferson l'ounty Landfill in accordance with all state and local laws FOOTIlYGS Setbacks -existing Footings Forms Reinforcement Irrterior footings FOUNDATION Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers Vents Crawl space access Girder to Concrete Positive Connection Treated Wood to Concrete Shield under Posts 6 mil black poly _ i ~~/~ t~~r~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pem~it#BLD43.OQ1 RE 'UIRED I1~SPECTI01~5 AppROVEDIDATE ~-~~_ FINAL House Number -check for 5" numbers Smoke Detectors throughout existing house per 1997 UBC Final -building GENERAL CONDTfIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by squired inspections. ----~ S. Re-inspection is required after inspection report corrections are completed. ~~ 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is reauired Public Works approval must be received prior to scheduhne the BuildmQ Department's final inspection ". Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within sia months, or if no inspections are done try the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. --_~ Ca1148 hours before you dig far utility line locates 1-800-424-5555 Page 2 of 2 . ~ ; ~ >~.