Loading...
HomeMy WebLinkAboutBLD02-279 Waterman & Katz Building 181 Quincy Street, Suite 301 Pon Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection R Permit Number: BLD02-279 Issued: 01/29/03 Parcel Number: Treehouse PUD. Lot 1. Unit 3 Job Address: 2203 Ebony Street Zoning: Treehouse PUD Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 3/1 Nature of Work: Construct single-family residence with garage. Owners: Madrona Village LLC Contractor; QED Builders LLC - QEDBUI*0431D1 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Any work with equipment within the 10' buffer adjacent to San Juan Estates requires prior written approval from BCD Director. uFniTiuFn nvcPFC`Tl(1N~ APPRnVF,n/nATF, TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings Interior Footings ~ ~ ,~ ~ / ~d (~ ~ Forms ~ Reinforcement S "'~ ~~ S LIFER Retaining Wall Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Peanic a si.DOZ-2~ REQUIRED INSPECTIONS APPRnVF.n/nATF SLAB Setbacks Forms Interior Footings Reinforcement - #3 @ 24" o.c. each way @ slab Engineered Holdowns Anchor Bolts -per engineered shear wall schedule Porch/Deck Piers FOUNDATION ~ ~ q,,- pct. SSeoQ_ Stem Wall C~ jo~'i' Gv vv7o ",~'. Zl / a~G3 Forms Reinforcement pQ ~- G L Anchor Bolts - @ shear walls per engineering ~' `~ Engineered Holdowns ~ ~ Vents - 3 required Retaining Wall . FLOOR FRAMING -engineered BCI plan shall be on-site at time of inspection Joists Engineered Holdawns and Straps Engineered Beams & Headers ~ ° Blocking Shield under Posts Positive Connections Treated Wood to Concrete PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply 4~~~°~ Gas Supply y~ b Water Hammer. Arrester @ clothes & dishwashers Hose Bibs (backflow protection required) ~. _ Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi ~ ~~ a3 ~~ Water Heater G R-10 under if electric ~ S I Seismic Restraint -strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate `~ '~ 6" - 24" above ground • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Permit # BLD(YL-279 RF.nITTRF.n IN~PF.(:'TIONS APPROVED/DATE .MECHANICAL LPG Stove -manufacturer's installation instructions shall be on-site at time of inspection. Whole House Fan @ @ upstairs bathroom -Max. 75 CFM KitchenBath/Laundry Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) FRAMING -Minor ImproveNtent Permit shall be issued 8r on-site at time of inspection Walls Engineered Shear Walls Ceilings Posts, Beams & Headers Roof ~ Blocking `~ Rafter Positive Connection - H1 ~ Roof Venting - eave and ridge vents L~ I Z ~ ~ Windows ~ escape Windows -safety glazing Windows Ufactor - .40 or better NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Window Ports) oors U-Factor - .20 or better Air Seal Fire Blocking Weather Resistive Barrier Engineered Stair Side & End Headers INSULATION Floor (R-30) ~-J / 3 a ~ 1 2 C~ C~ l Walls (R-21 ) Ceiling (R-30vault/R-38 attic ) Va Barrier: paint for walls and ceilin aflles ~= DRY WALL NAILING y Vt~alls Ceiling ~ / c~/Z y~o3 Enclosed Usable Space under Stairs ~~,~~~~~~~ k~. ~' ~~~ ~. ~~~~~,~`~. arage/House Occupancy Separation ~_~ , ~~ ~ ~ u • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 ONS Permit # BLDOZ-~9 ~ FINAL - No occupancy permitted prior to final plat ` Approval for Phase I Public Works Sign-Off Parking - I space required House Numbers - 5" minimum LPG v~ ~ca.,no ~.vb-,- -b t-~. rr~ ->1`- ~t1~'~ ~ a,r~.,.¢~- I~~ 120 G G~ ~ 3l ~~ Plumbing MechanicaVHeating Vapor Barrier Paint Certificate ~~~ ~ ~i71 ~3 - Insulation Certificate Smoke Detectors Final - Buildin GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TE5C) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) re~: inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works aaproval must be received prior to scheduline the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379- 3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page4of4 City of Port Townsend Building & Community Development Waterman & Katz Building 181 Quincy Street Port Townsend, WA 98368 (360) 379-3208 Fax: (360) 385-7576 • CERTIFICATE OF OCCUPANCY BLD02-279 Owner: Madrona Village LLC Address: 2203 Ebony Street Location: Port Townsend, WA 98368 Building (or portion): Single Family Residence with garage Use(s) permitted: Dwelling Unit with accessory uses q _~ ~~ ~~ ti~ ~~~I ~... .~: Y'Ai'v };~~.L.~. ;e<,->: The above-referenced building or portion complies with the applicable requirements of the Port Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used and occupied in the use and manner indicated above. This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not be removed except by the Building Official. G{~C~~iy-~,. Approved: Suzanne Wassmer Permit Technician Date .]