HomeMy WebLinkAboutBLD02-259r
r ~
1
CITY OF PORT TOWNSEND
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Catl 385-2294 for Inspection
Permit Number: BLD02-259 Issued: 12/02/02 Parcel Number: Treehouse PUD. Lot 1. Unit 2
Job Address: 2201 Ebony Street Zoning: Treehouse PUD Type: V-N Occupancy: R-3/U-1
Total Occupant Load: 2/2 Nature of Work: Construct single-family residence with garage
Owners: Madrona Village LLC Contractor: QED Builders LLC - QEDBUI*0431D1
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Any work with equipment within the 10' buffer adjacent to San Juan Estates requires prior written
approval from BCD Director.
•REOUIRED INSPECTIONS
J
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
FOOTINGS
Setbacks
~ ~ ~~
Footings
Interior Footing
Expanded Footing
Forms
Reinforcement
UFER
Deck Piers
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding
Tra Seal Protection
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
,`
RE UIRED INSPECTIONS
sLAB
Interior Footings
Reinforcement - #3 @ 24" o. c. each way
R-10 under
FOUNDATION
Stem Wall
Forms f ~ 0 2j
Reinforcement
Anchor Bolts - @ shear walls per engineering
Engineered Holdowns
FLOOR FRAMING -engineered BCI plan shall be on-site
at time of inspection Y~,~tb+~ suJ f ~S~D
Joists
Engineered Hangers
Gj~Z~p?j
Beams
Blocking
Shield under Posts
Positive Connections
Treated Wood to Concrete
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Gas Supply
Water Hammer Arrestor @ clothes washer
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
~
~
a l~
Pressure Reduction Valve if > 80 psi
Water Heater ~
'~
q~ 1 /
s/~ a.3
Seismic Restraint -strap tank @ 1/3 points ,,~
~' V nab (~ `
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
R-10 under if electric
MECHANICAL ~~,~-uy-r ~.u~ L~ b 9 ZQ D 3
LPG Heating Stove -manufacturer's installation
instructions shall be on site at time of inspection.
Whole House Fan @ bathroom -Max. 75 CFM
Kitchen Fan
Laundry Fan
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and terminus (located 3' from openings)
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page. 2 of 4
APPROVED/DATE
Pennie # B~ozrrsq
•
~ a~
,~+
RE UIRED INSPECTIONS
Permit # BLD02-259
APPROVED/DATE
FRAMING - MIP shall be issued & on-site at time of
inspection
Walls
Engineered Shear Walls
Ceilings
Engineered Posts, Beams & Headers
Roof ,,~ ,
{
,, ~ , ,
''~- --~~ ~`~ ~.3
Blocking
Rafter Positive Connection - H-1
Collar Ties
Roof Venting - eave and ridge vents
Windows -escape
Windows -safety glazing
_ _
Windows Ufactor - .40 or better ~
- ~ - ---
Skylights - .58 or better -
~~`~
NFRCwindow sticker must be on windows & `~
'~
doors at inspection time
Fresh Air Intake (Window Ports)
~
oors U-Factor - .20 or better
--~-~- __~_~___ _ __.___ ~
,t
_.__._ ___T__ .__----___
Air Seal ,_
Fire Blocking
Weather Resistive Barrier
INSULATION
- Floor (R-30 & R-10 }
Walls (R-21 )
Ceiling -vaulted (R-30 ); flat (R-38 )
Vapor Barrier: paint
Baffles
DRY WALL NAILING
Walls
Ceiling
Enclosed Usable Space under Stairs
Garage/House Occupancy Separation
Call 48 hours before ou di for utili line locates
Y g tY
1-800-424-5555
Page 3 of 4
~~ c
.~
REQUIRED
FINAL - No occupancy permitted prior to f:pal plat
Approval for Phase I
Public Works Sign-Off
Parking -1 space required
House Numbers - 5" minimum
LPG
Insulation Certificate
Smoke Detectors
Final - Building
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
•
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to
beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall
be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum
of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the
Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done by
the Building Department within one year. Call for at least one inspection per year to keep your building
permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
~.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
Permit # BLDO'c~25A - t
OVED/DATE ~' ~
• •
A~o~pogrro~y~ CITY OF PORT TOWNSEND
~ o DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
~ ;~
~~wN For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: ~ ~ - LQ ' ~~ PERMIT NUMBER: ~~L..,,~~,- ~d~
SITE ADDRESS: ~ ~ ~ s n J
PROJECT NAME: (~ ~ ,~ CONTRACTOR:
CONTACT PERSON: p~ ~, ~ ~ (~ ~"i PHONE: .~~ ~'~__ ' ~ '~'
TYPE OF INSPECTION: ~_I (1
~:,
_,_-
~, ,
• -
'`~1 APPROVED ^ APPROVED WITH ^ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re-inspection before
'` ~ checked at next inspection proceeding.
Inspector ~~'~~ ' Date
~ - _..
Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may
be assessed if work is not ready for inspection.