Loading...
HomeMy WebLinkAboutBLD02-242.a wstermao & Kstz Building t 181 Quincy Street, Suite 301 Port Townsend, wA 98368 y Phone: 3603793208 FAZ 360385-7675 CITY OF PORT TOWNSEND ~~ 1....__ CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-242 Issued: 10/18/02 Parcel Number: 001 044 018 Job Address: 2880 Hastings Avenue Zoning: R-I Type: V-N Occupancy: R=3 Total Occupant Load: S Nature of Work: Set new manufactured home; add deck and porch. Owner: Deborah Kimball Contractor: J HConstruction -James Hoesel WAINS#0250 * * * *Installer: See Attached Installer Tag* * * • GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIltED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: Set-up manual shall be on-site at time of inspection. RF.(1TTTRF.TI TNCPF.f TT(1NC APPRnVFn/nATF. TEMP EROSION & SEDIMENT CONTROL See general condition #2 Silt Fence as needed Drive OffMat to prevent sediment from leaving the site FOOTINGS/SLAB Setbacks ~ ~ ®~ Forms Reinforcement Footings -minimum 4" per installation manual. FLOOR FRAMING (prior to skirting) Anchors Steel Support Piers -Load-stamped and installed per manufacturer's installation manual; clearance l ~~ ~~~ of 18 "min. from lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12 "min. elsewhere unless installation manual specifies; otherwise area around home aded to rovide runo aw om home. Ca1148 hours before you dig for utility line locates 1-800-424-SSSS Page 1 of 3 Permit #BLD02-242 REDUIRED INSPECTInNS APPRnVFD/nATF. PLUMBING: Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, min. ~/. "diameter, same as supply pipe Pressure Reduction Valve if > 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s i. for IS minutes Pressure relief valve drain - to exterior of skirting, exhaust dowmvard between 6"and 24"above ground Drainage Piping -sloped min. %' per foot MECHANICAL Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl ~ ~j space requires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length of ducting not to exceed 14' w/ 2-90° elbows FRAMING: Wood Deck, Porch Entry Stairs, Landing, Handrails Pressure-treated or of natural resistance to decay. VAPOR BARRIER 6 mil black poly ground cover (not required where area under home is concrete slab floor with a minimum ~ ~ 0 ~ thickness of 3-%a inches) FINAL County Environmental Health Septic Sign-Off Public Works Sign-Off Electrical (L & 1) Sign-Off House Number -minimum 5" numbers Plumbing Mechanical Final -Building No holes or gaps greater than '/. "allowed in skirting. Crawl space ventilation per installation manual @ 1/1 SO (16 required), located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home, minimum 18" x 24'; covered with virryl, ressure treated wood or metal. i • • CaU 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permit #BLD02-242 GENERAL CONDITIONS '.. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. Ali building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 i Waterman & Katz Building ` 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 379-6923 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-242R-1 Issued: 01/07/03 Parcel Number: 001 044 018 Job Address: 2880 Hastings Avenue Zoning: R-I Type: V-N Occupancy: RR=3 Total Occupant Load: 5 Nature of Work: Revision #1: installation of eneineered fill. Owner: Deborah Kimball & Jeff Gallant Contractor: J HConstruction -James Hoesel WAIN5#0250 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: for other inspections, see original permit BLD02-242 Set-up manual shall be on-site at time of inspection. RF.(~TTTRFT) TN~PFf'TT(1N~ APPR(1VFn/I~ATF ENGINEERED FILL Per attached report FOOTINGS/SLAB See original manufactured home installation permit (~ ~I FINAL Building -See original permit #BLD02-242 Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page l of 2 Pemvt # BLD02-2428 1 1. Contractors working on this project are required to have a Labor & Industries contractor's registration - ,~~ number and a City business license. Failure to provide proof of this documentation prior to work may ~"" result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page2of2 °~Q°RTT°~,~s~ CITY OF PORT TOWNSEND PUBLIC WORKS 2 U DEVELOPMENT SERVICES DEPARTMENT ~~=_~_~ - -o~ 9T - ~ . ~~ INSPECTION REPORT • ~°F WASN~~ PERMIT NUMBER: Lr~ U ~~ Z Address ~ ~ r~ Contractor Owner I ~I ~ 'l ~~`~/ 0 ~~1--- - 4'"!"~GC l Date of Inspection Worksite or Cell Phone# ^ Erosion/Sedimentation ^ Setbacks/Footings/LIFER ^ Foundation Walls ^ Slab Interior Footing/Insulation ^ Groundwork/Plumbing Test ^Udrfl F Plumbing/Top Out ^ Drywall/Fire Wall ^ Gas Pipe/Pressure Test ~^ Gas/Wood Appliance ^ Propane Tank/Line ^ Manufactured Home Set-up ^ Mechanical ^ Public Works ^ Framing ^ Other/Consultation n e oor raming ^ Insulation _ ^ Shear Wail/Holdowns ^ Interior Shear/BWP Nail FINAL ~ ~ ~ ~ f t~: '' `>" `~F^~ If corrections required, re-inspection must be done prior to covering or concealing areas ~ cry S~'~~tl f of construction. Additional fees may be assessed for multiple re-inspections. c~f%•'u^~ For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. ~ ~ ~ ~~;t- ~ NO OCCUPANCY UNTIL FINALIZED-~Y BUtt-I:~FPICiAND, IF APPLICABLE, PUBLIC WORKS. t-~; ~'~ ^ VIOLATION *~ ^ APPROVAL ^ CORRECTION REQUIRED ^ APPROVED WITH CORRECTION ~ ~ NEED APPROVED PLANS & PERMIT ON SITE JJ r /'~ r~~ ~ ~ ~ ,. %~ _ ~ ~, f ' ~ ~ ~~ ~` _ ~~ Approvec~lans and permit card must be on-site and available at time of inspection. ,, - --__ _ , -^ Ins ector ~`~ ~ ~ ~ Date ' p --~-a- ~--- - ~ ~- ` -- --_ -_ ` - ~~p~QpgTTp~~s~ CITY OF PORT TOWNSEND PUBLIC WORKS - ~ BUILDING AND COMMUNITY DEVELOPMENT ~OF WASH~~ '' ~ " ~~ INSPECTION REPORT PERMIT NUMBER Address Contractor Owner Date of Inspection Worksite or Cell Phone# ^ Erosion/Sedimentation ^ Setbacks/Footings/LIFER ^ Foundation Walls ^ Slab Interior Footing/Insulation ^ Groundwork/Plumbing Test ^ Underfloor Framing ^ Shear Wall/Holdowns ~~ '~~ t.~ C ~z ~ 1 ~'t ~ ~-, ^ Plumbing/Top Out ^ Drywall/Fire Wall f.r~ ~' ~"'~. ~c ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance ~ (,~,n ~ ~ ^ Propane Tank/Line ^ Manufactured Home Set-up ^ Mechanical Public Works C -~ Vii, ~~ ~" ^ Framing ^ Other/Consultation ~~` f ~~~- ~ n ^ Insulation ti ^ Interior Shear/BWP Nail ^ FINAL u~rl~t If corrections required, re-inspection must be done prior to covering or concealing areas ~'~`~`~ of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION ^ APPROVAL ^ CORRECTION REQUIRED t~ ~t%~'~ Approved plans Inspector 1~ ~ l./ ~...- it .card must be o ite and available at time of inspection. Date ~'~