HomeMy WebLinkAboutBLD02-242.a
wstermao & Kstz Building
t 181 Quincy Street, Suite 301
Port Townsend, wA 98368
y Phone: 3603793208 FAZ 360385-7675
CITY OF PORT TOWNSEND
~~
1....__
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-242 Issued: 10/18/02 Parcel Number: 001 044 018
Job Address: 2880 Hastings Avenue Zoning: R-I Type: V-N Occupancy: R=3
Total Occupant Load: S Nature of Work: Set new manufactured home; add deck and porch.
Owner: Deborah Kimball Contractor: J HConstruction -James Hoesel WAINS#0250
* * * *Installer: See Attached Installer Tag* * *
•
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIltED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Set-up manual shall be on-site at time of inspection.
RF.(1TTTRF.TI TNCPF.f TT(1NC
APPRnVFn/nATF.
TEMP EROSION & SEDIMENT CONTROL
See general condition #2
Silt Fence as needed
Drive OffMat to prevent sediment from leaving
the site
FOOTINGS/SLAB
Setbacks
~ ~ ®~
Forms
Reinforcement
Footings -minimum 4" per installation manual.
FLOOR FRAMING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed
per manufacturer's installation manual; clearance l ~~ ~~~
of 18 "min. from lowest point of I-beam and the
ground or footing for min. of 75% of area under
home w/ 12 "min. elsewhere unless installation
manual specifies; otherwise area around home
aded to rovide runo aw om home.
Ca1148 hours before you dig for utility line locates
1-800-424-SSSS
Page 1 of 3
Permit #BLD02-242
REDUIRED INSPECTInNS APPRnVFD/nATF.
PLUMBING:
Water Supply -Main shut-off valve (port or ball valve)
installed in water supply piping prior to connection to
home, min. ~/. "diameter, same as supply pipe
Pressure Reduction Valve if > 80 psi
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 p.s i. for IS minutes
Pressure relief valve drain - to exterior of skirting,
exhaust dowmvard between 6"and 24"above ground
Drainage Piping -sloped min. %' per foot
MECHANICAL
Ducts & Duct Insulation
Dryer Exhaust -vented to outside. Extension into crawl ~ ~j
space requires venting through skirting with no dips;
follow dryer manufacturer's instructions; total combined
length of ducting not to exceed 14' w/ 2-90° elbows
FRAMING:
Wood Deck, Porch
Entry Stairs, Landing, Handrails
Pressure-treated or of natural resistance to decay.
VAPOR BARRIER
6 mil black poly ground cover (not required where area
under home is concrete slab floor with a minimum ~ ~ 0 ~
thickness of 3-%a inches)
FINAL
County Environmental Health Septic Sign-Off
Public Works Sign-Off
Electrical (L & 1) Sign-Off
House Number -minimum 5" numbers
Plumbing
Mechanical
Final -Building
No holes or gaps greater than '/. "allowed in skirting.
Crawl space ventilation per installation manual @
1/1 SO (16 required), located close to corners, on at least
two opposing sides for cross ventilation.
Crawl space access must provide access to all areas
under home, minimum 18" x 24'; covered with virryl,
ressure treated wood or metal.
i
•
•
CaU 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Permit #BLD02-242
GENERAL CONDITIONS
'.. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. Ali building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
i
Waterman & Katz Building
` 181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 379-6923
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD02-242R-1 Issued: 01/07/03 Parcel Number: 001 044 018
Job Address: 2880 Hastings Avenue Zoning: R-I Type: V-N Occupancy: RR=3
Total Occupant Load: 5 Nature of Work: Revision #1: installation of eneineered fill.
Owner: Deborah Kimball & Jeff Gallant Contractor: J HConstruction -James Hoesel WAIN5#0250
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: for other inspections, see original permit BLD02-242
Set-up manual shall be on-site at time of inspection.
RF.(~TTTRFT) TN~PFf'TT(1N~
APPR(1VFn/I~ATF
ENGINEERED FILL
Per attached report
FOOTINGS/SLAB
See original manufactured home installation permit
(~
~I
FINAL
Building -See original permit #BLD02-242
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page l of 2
Pemvt # BLD02-2428 1
1. Contractors working on this project are required to have a Labor & Industries contractor's registration - ,~~
number and a City business license. Failure to provide proof of this documentation prior to work may ~""
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page2of2
°~Q°RTT°~,~s~ CITY OF PORT TOWNSEND PUBLIC WORKS
2
U DEVELOPMENT SERVICES DEPARTMENT
~~=_~_~ - -o~
9T - ~ . ~~ INSPECTION REPORT
• ~°F WASN~~
PERMIT NUMBER: Lr~ U ~~ Z
Address ~ ~ r~
Contractor
Owner I ~I ~ 'l ~~`~/ 0 ~~1--- - 4'"!"~GC l
Date of Inspection
Worksite or Cell Phone#
^ Erosion/Sedimentation
^ Setbacks/Footings/LIFER
^ Foundation Walls
^ Slab Interior Footing/Insulation
^ Groundwork/Plumbing Test
^Udrfl F
Plumbing/Top Out ^ Drywall/Fire Wall
^ Gas Pipe/Pressure Test ~^ Gas/Wood Appliance
^ Propane Tank/Line ^ Manufactured Home Set-up
^ Mechanical ^ Public Works
^ Framing ^ Other/Consultation
n e oor raming ^ Insulation _
^ Shear Wail/Holdowns ^ Interior Shear/BWP Nail FINAL ~ ~ ~ ~ f t~: '' `>" `~F^~
If corrections required, re-inspection must be done prior to covering or concealing areas ~ cry S~'~~tl f
of construction. Additional fees may be assessed for multiple re-inspections. c~f%•'u^~
For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. ~ ~ ~ ~~;t- ~
NO OCCUPANCY UNTIL FINALIZED-~Y BUtt-I:~FPICiAND, IF APPLICABLE, PUBLIC WORKS. t-~; ~'~
^ VIOLATION *~ ^ APPROVAL ^ CORRECTION REQUIRED
^ APPROVED WITH CORRECTION ~ ~ NEED APPROVED PLANS & PERMIT ON SITE
JJ r /'~
r~~ ~ ~ ~ ,. %~ _ ~ ~,
f ' ~ ~
~~ ~` _ ~~
Approvec~lans and permit card must be on-site and available at time of inspection.
,,
- --__ _ ,
-^
Ins ector ~`~ ~ ~ ~ Date '
p --~-a- ~--- - ~ ~- ` -- --_ -_
` - ~~p~QpgTTp~~s~ CITY OF PORT TOWNSEND PUBLIC WORKS
- ~ BUILDING AND COMMUNITY DEVELOPMENT
~OF WASH~~
'' ~ " ~~ INSPECTION REPORT
PERMIT NUMBER
Address
Contractor
Owner
Date of Inspection
Worksite or Cell Phone#
^ Erosion/Sedimentation
^ Setbacks/Footings/LIFER
^ Foundation Walls
^ Slab Interior Footing/Insulation
^ Groundwork/Plumbing Test
^ Underfloor Framing
^ Shear Wall/Holdowns
~~ '~~ t.~
C ~z ~ 1 ~'t ~ ~-,
^ Plumbing/Top Out ^ Drywall/Fire Wall f.r~ ~' ~"'~. ~c
^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance ~ (,~,n ~ ~
^ Propane Tank/Line ^ Manufactured Home Set-up
^ Mechanical Public Works C -~ Vii, ~~ ~"
^ Framing ^ Other/Consultation ~~` f
~~~- ~ n
^ Insulation ti
^ Interior Shear/BWP Nail ^ FINAL u~rl~t
If corrections required, re-inspection must be done prior to covering or concealing areas ~'~`~`~
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS.
^ VIOLATION ^ APPROVAL ^ CORRECTION REQUIRED
t~ ~t%~'~
Approved plans
Inspector
1~ ~
l./ ~...-
it .card must be o
ite and available at time of inspection.
Date ~'~