Loading...
HomeMy WebLinkAboutBLD02-185Waterman & Katz Building 181 Quincy Street, Suite 301 ~ ~ Port Townsend, WA 98368 Phone: 360-379-5086 Fa:360-385-7675 CITY OF PORT TOWNSEND • • • CONSTRUCTION PERMIT & INSPECTION RECORD i, THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-185 Issued: 5/28/03 Parcel Number: 989 714 210 Job Address: 610 Hudson Place Zoning: R-II Type: V-N Occupancy: R-3 Total Occupant Load: 7 Nature of Work: Construct Single-family Dwelling Owner: Mike & Shelly Reiss Contractor: Little & Little Construction-LITTLLC157C5 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: Special Inspection is required for A325 high-strength bolts~er UBC Section 1701. S, item 6 and for piles as required in the Soils Report om Aspect Consulting. The Special Inspector for the high-strength bolting shall be an ICBO certified inspector listed in the current edition of the WABO "Agency and Inspector Register " or present ICBO credentials to the Building Department prior to performing inspections. Special Inspection Reports shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Per attached permit #SDP02-032 FOOTINGS -per engineered details; all soil bearing ~-'~`~"f'~ ~ ~'- r °~'-~~~~~~~~~~. ~.-~~° .~ ~~~f^°~ surfaces shall be inspected by geotech prior to placement of resteel and concrete as noted on Sheet A7 of plans Setbacks Pile Footings Grade beams Column Footings Forms Reinforcement -per engineering Interior Footings and grade beams Porch Footings Deck Footings LIFER CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 Building Permit #02-1$S; a REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION -per engineered details; all elements of engineering require inspection prior to cover Stem Wall r p `7~z-z~ Forms ~si a Reinforcement -per engineered detail c or o is & Was ers -per engcneere o own -'-~-_., schedule Engineered Holdowns Crawl Access Foundation Vents FLOOR FRAMING NOTE: Engineered TJI floor plan on-site and available to the Inspector at inspection time ~ g~Z~D3 Girders Joists Radiant Heat Tubing B ocking Hangers Positive Connections O ~~2(~D/ Treated Wood to Concrete Anchor Bolts & Washers Engineered Holdo s ~-3~~~~"o.~.®s~z ~~~..~ ~,~-t.~.,s ~ f 8103 PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors ~ Gas Supply f Hose Bibbs - backflow protection required c"~ Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi ./ Water Heater ~ ~~J Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate ~ 6" -24" above ground r Call 48 hours before you dig for utility line locates . 1-800-424-5555 Page 2 of 5 ~, ~~.. . r ~RE UIRED INSPECTIONS D ,. t. ,h Building Permit #02-185 A PPR(IVF.I)/nATE 1:~IECHANICAL Boiler -manufacturer's installation instructions shall be on- site at time of inspection LPG Fireplaces -provide specs on-site Whole house fan -Guest bath Source Specific Exhaust Fans @ bathrooms (SOcfm), laundry room, (50 cfm) and kitchen (100 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) ~_. - ="-~~ ~; ~"' ` ~. ~ j FRAMING Walls -framing per shear wall designations ~-7' cc ~_ ~ E-F~t}~fL.. w ~ ~ ~.~ ~-- ~:=`~ ~. -~ ~ Q~ ~~ ~, Y ~ . r _ , - Engineered shear walls Interior shear walls ~ Engineered moment Pram connections , -~ .~ Shear Panel Blocking ~ ,% Roof -engineered truss plan shall be on-site at time of inspection Truss positive connection Attic venting -gable end cg eave ~~~~= Posts, beams and headers -per engineering f Engineered Steel Columns and Beams Windows -escape ~~- Windows -safety glazing Window U-factor - .40 or better Door U-factor - .20 or better ~ ~" Skylight U-factor - .58 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal Fresh Air Intake -wall ports Fireblocking Weather Resistive Barrier INSULATION Floor (R-30 ) Walls (R-21) ~ ~ - . Ceiling (R-38 ) Baffles _ Vapor Barrier -faced batts 6 mil black poly in crawl space Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 ~~ ~ REQUIRED INSPECTIONS Building Permit #02-185 ~ APPROVED/DATE DRYWALL NAILING Walls Ceiling _ FINAL Public Works Sign-off LPG House Numbers- 5" numbers Plumbing Mechanical Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Stairs, Decks & Landings Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall 6e permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Pu61ic Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 Building Permit #02-185 ion are re uired rior to occu anc • A Certificate of Occu anc is re uired 7. Final Inspect s q p p y~ p Y q for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 360.3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-185R-1 Issued: 6/30/03 Parcel Number: 989 714 210 Job Address: 610 Hudson Place Zoning: R-II Type: V-N Occupancy: RR=3 Total Occupant Load: 7 Nature of Work: Revision #l: Change foundation to Chance anchors from auger cast piles Owner: Mike & Shelly Reiss Contractor: Little & Little Construction-LITTLLC157C5 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: ~ecial Infection is required for boltin~ofpile caps and Chance anchors per Uniform Building Code Section 1701.5 and as required in the Soils Report from Aspect Consulting. Special • Inspection Reports shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. REQUIRED INSPECTIONS APPROVED/DATE * *See also on final Ins ection Record FOOTINGS -per engineered details; all soil bearing surfaces shall be inspected by geotech prior to placement of resteel and concrete as noted on Sheet A7 of plans Setbacks Grade beams Forms Reinforcement -per engineering Interior Footings and grade beams FOUNDATION -Chance anchors torque, driven depth, attachment of pile caps, etc. require special inspection as noted above CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit#02-185R-1 ' ' GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Pu61ic Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the. Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates • 1-800-424-5555 Page 2 of 2 Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 360-3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD i THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-185R-Z Issued: 07/09/03 Parcel Number: 989 714 210 Job Address: 610 Hudson Place Zoning: R-II Type: V-N Occupancy: R=3 Total Occupant Load: 7 Nature of Work: Revision #2: foundation grade beam modification and crawl space access. Owner: Mike & Shelly Reiss Contractor: Little & Little Construction-LITTLLC157C5 GENERAL CONDITIONS APPLY: See last pale SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: Special Inspection is required for bolting of pile caps and Chance anchors per Uniform Buildin>? Code Section 1701.5 and as required in the Soils Report rom Aspect Consulting. Special Inspection Reports shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. REQUIRED INSPECTIONS APPROVED/DATE * *See also on final Ins ection Record FOOTINGS -per engineered details; all soil bearing surfaces shall be inspected by geotech prior to placement of resteel and concrete as noted on Sheet A7 of plans Setbacks Forms Widened Footing Reinforcement - #6 typical per engineering #3 Stirrup embedment Roughened "cold joint" • CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD02-185R-2 , FOUNDATION -Refer to engineering details. Chance anchors torque, driven depth, attachment of pile caps, etc. require special inspection as noted above. StemwalUGrade Beam Forms Reinforcement - #6 and #4 #3 Stirrups New Crawl Access Opening GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. . 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates • 1-800-424-5555 Page 2 of 2 Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone:360-379-5086 Fax360-385.7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD02-185R-3 Issued: 07/21/03 Parcel Number: 989 714 210 Job Address: 610 Hudson Place Zoning: R-II Type: V-N Occupancy: RR=3 Total Occupant Load: 7 Nature of-Work: Revision #3: new detail showing section view of foundation reinforcement at steel columns. Owner: Mike & Shelly Reiss Contractor: Little & Little Construction - LITTLLC157C5 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: ~ecial Inspection is required or bolting of pile caps and Chance anchors per Uni orm Building Code Section 1701.5 and as required in the Soils Report rom Aspect Consulting. Special Inspection Reports shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. REQUIRED INSPECTIONS APPROVED/DATE '~*J'ee also original lnspectton Kecord'~'~ FOOTINGS -per engineered details; all soil bearing surfaces shall be inspected by Geotech prior to placement of resteel and concrete as noted on Sheet A7 ofplans Setbacks Forms (6) #5 vertical drilled and epoxied into footing with Hilti HY-150 or equivalent #3 Stirrups @ 1 foot o.c. (2) #6 continuous @ top #4 ties (2) #6 continuous @ bottom -a' CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD02-185R-3 ' FOUNDATION -Refer to engineering details. Chance anchors torque, driven depth, attachment of pile caps, etc. require special inspection as noted above. Detail 8 dimension changed from 6" & 6" to 8" & 4" revised detail (3) #5 each face (3) #4 @ top rest @ 8" (changed from 4") GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prio"r to cover. i 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by • required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval riot to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phoce:360-379-5086 Fax360-3857675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDU2-185R-4 Issued: 7/31/03 Parcel Number: 989 714 210 Job Address: 610 Hudson Place Zoning: R-II Type: V-N Occupancy: RR=3 Total Occupant Load: 7 Nature of Work: Revision #4: revised details for deck footing, and wall construction. Owner: Mike & Shelly Reiss Contractor: Little & Little Construction - LITTLLC157C5 GENERAL CONDITIONS APPLY: See last cage SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: Speciallnspection is required for bolting ofpile cis and Chance anchors per Uni orm Building Code Section 1701.5 and as required in the Soils Report from Aspect Consulting. Special Inspection Reports shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. REQUIRED INSPECTIONS APPROVED/DATE **See also on final Ins ection Record ** :] FOOTINGS -per engineered details; all soil bearing surfaces shall be inspected by Geotech prior to placement of resteel and concrete as noted on Sheet A7 of plans Deck Footings - Sonatubes with stirrups ; f Reinforcement ~ y ~-~,'~~~,~ -:; v- , ~ ~' / #6 bottom bars stubbed into pier (4) #4 vertical bars #3 ties @ 8" o.c. #6 top bars continuous over pier FOUNDATION -Chance anchors torque, driven depth, attachment of pile caps, etc. require special inspection as noted above See attached plan CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD02-185R-d' GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. ~ ,. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before ou di for utili line locates Y g Ty 1-800-424-5555 Page 2 of 2 r . . / . d ~,, : ~ ,~ .. ~- _r - „_.-dam"'-`"_""`,... CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection ti __ ~_.~ Permit Number: BLD02-185R-Jr Issued: 09/08/03 Parcel Number: 989 714 210 Job Address: 610 Hudson Place Zoning: R-II Type: V-N Occupancy: R_3 Total Occupant Load: 7 Nature of Work: Revision #5: revised details for truss (a~ guest bedroom and header support Owner: Mike & Shelly Reiss Contractor: Little & Little Construction - LITTLLC157C5 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 NOTE: See Original Permit and other revisions for other inspections. REQUIRED INSPECTIONS FRAMING Revised PSL Beam/Truss Connection Detail; Sheet A-9 of original plans Hangers -Simpson U210 or THA213 Nailing _--- Revised Header Support; Sheet S-1 Detail K of original plans Bundled Studs (2) 2 x 6 Simpson A35 with tabs bent both directions, typ. APPROVED/DATE ~~ C~~~G , Building Permit #BLD02-185R-5 , GENERAL. CONDITIONS 1. Contractors workin on this ro'ect are re g p ~ quired to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is repaired. Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • City of Port Townsend Building & Community Development Waterman & Katz Building ,~„ _,~„_ 181 Quincy Street ~~ ;gg,"`L Port Townsend, WA 98368 (360) 379-3208 Fax: (360) 385-7576 CERTIFICATE OF OCCUPANCY BLD02-185 Owner: Mike and Shelly Reiss Address: 610 Hudson Place Location: Port Townsend, WA 98368 Building (or portion): Single Family Residence with carport Use(s) permitted: Dwelling Unit with accessory uses • The above-referenced building or portion complies with the applicable requirements of the Port Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used and occupied in the use and manner indicated above. This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not be removed except by the Building Official. Approved: Penny Westerfield July 16, 2004 Administrative Assistant Date ;~•i~, it ~ ~~~,~., „ ; ~~~~ia~~~a~i ia~i -... ~~~iai1/ ~'~ a %i~ • ,r' • :~