HomeMy WebLinkAboutBLD02-1780
Waterman dt Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD02-17g Issued: 09/25/02 Parcel Number: 958200502/948302505
Job Address: 535 21`` Street Zoning: R-II Type: V-N Total Occupant Load: 4
Occupancy: R-3 Nature of Work: Lift house, build ADU on bottom floor
Owner: Pamela Grav Contractor: Paul Kaase - PAULKC*061C5
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF(1TTTRFT) TN~PFC.TTnN~ APPRnVF.n/nATF.
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2
Silt Fence as needed
Drive OffMat to restrict sediment from leaving
the site; okay to use existing gravel driveway
GROUNDWORK PLUMBING d l~'
Pressure Test G y
Pipe Joints Exposed G~~ ~
~/ S/ ~ ti~
Pipe Bedding
Trap Seal Protections
MONOLITHIC SLAB
R-10 under entire slab & perimeter ~ -----` _.____R
Hydronic Tubing
Setbacks (~ ~~~ .
Footings
F
~
orms ~,),,
,
Reinforcement
Engineered Holdowns ~; ~'` /~~~,~~
Engineered Concrete Beam over Cistern
Anchor Bolts & Washers
~" ~ ~"~
Interior Footings -
_...
- w
I d3
Deck Piers _..----------- ~.... _,__. _.__ -.. J _ .
~ 13
__._
- __ __
w
CaU 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
•t
Permit # BLD02-178
P
REQUIRED INSPECTIONS
FLOOR FRAMING
Joists -existing 2 " x 6"with TJI sisters; engineered TJI
plan on-site at time of inspection
Joist Hangers
Blocking
Beams
Treated Wood to Concrete
Positive Connections
PLUMBING:
Rough-In (D-V-T & Clean outs)
Gas Supply
Water Supply
Hydronic Floor Heat
Water Hammer Arrestors @ clothes and dishwasher
Hose Bibbs (backflow protection required)
Pressure Reduction Valve required if pressure > 80 psi
Water Heater
R-10 in unheated space
Seismic Straps
Pressure Relief Valve drain to exterior
MECHANICAL
Boiler -manufacturer's installation instructions shall be on-
site at time of inspection
Whole House Fan - @ bath
Kitchen/Utility/Bath-2 fans
Environmental Air Exhaust ducting (with backdraft
dampers), insulation (R - 4), and termination (located 3'
from openings into building)
FRAMING
Walls
Engineered Shear Walls
Engineered Headers & Beams
Treated Wood to Concrete
Ceiling -one-hour occupancy separation
Windows -escape
Windows -safety glazing
Windows U-factor - .40 or better
NFRC window sticker must be on windows and doors at
inspection time
a~>
G
~ ~ ~~
(b
l~ ~~~ G ~ ~~D3
~,, ~ ~ l
IJ ~G / 03
~~
~/ 6) m~
~,J c' ~ 1., C 1148 hours before you dig for utility line locates
~~ ~~~°`-~ J ~ t~.~ 1-800-424-5555
/ Page2of4
I' ~ ~ ~ ~ ~ ~ ~~ ~
r-
RF.nTTTRF.T) TN~PF.C'TTnNS APPROVED/DATE
r~;~ a s~oza ~s
rY~oor U-factor - 20 or better ~.~
~
II Door one-hour rated door at stairwell
`Air Seal }. \ v~
\~ ~°
Fresh Air Intake (W~ndow Ports)
ir~ u~ckin
__
--
- -- ----~~-
Weather Resistive Barrier -----..--_ _________"__~ _
INSULATION
Floor (R- 10 under slab) ~ IG ~~
Walls - (R-21 )
Ceiling - (R-30) I ~~2g-lo3
Baffles
or arr' r• aint
DRY WALL NAILING
Walls -one-hour rated walls
Ceiling -one-hour rated ceiling between dwelling units
Enclosed Usable Space under Stairs '
FINAL
LPG
House Numbers - 5"minimum / 5
., S
Plumbing ~
~
Mechanical/Heating QJ`
~ /
nsulation Certificate ~
apor Barrier Paint Certificate
Smoke Detectors
Deck/Stairs/Guardrail s/Handrail s
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
.~
Permit # BLD02-175
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must-be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
6y the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval riot to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
~~~oarr~,y~y~~ CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
~Q'~`WA~Y'~~G INSPECTION REP/~ORT
PERMIT NUMBER: C ~-°~ ~ ~ ~l ~~
Site Address ~~.3~ ~" ~~; ~-~ S,r ~~~r~
S~
Contractor ~
.5~~ ~~~~
Owner G~/!'~'l ~ ~~
~o
Date of Inspection C~ 11 y i ~--{p l/
Worksite or Cell Phone# 3 ~ J `~ ~ Z- ~ -S ~~ ~'~`-
G~ ~~a''''°P
^ Erosion/Sediment Control ^ Plumbing/Top Out ^ Propane/Wood Appliance
^ Setbacks/Footings/LIFER ^ Propane Pipe/Pressure Test ^ Manufactured Home Set-u~~
^ Foundation Walls ^ Propane Tank/Line ^ Fire Department ;~
^ Footing Drainage ^ Mechanical ^ Temporary Occupancy ~`~+~
^ Slab/Interior Footing/Insulation ^ Framing ^ Fees Paid ;j'~,~
^ Groundwork/Plumbing Test ^ Insulation Final Occupancy ~S~u-j.f
^ Underfloor Framing ^ Interior Shear/BWP Nail ^ Other/Consultation ~ ~~~~
~ S' ~ n
^ Ext. Shear Wall/Holdowns ^ Drywall/Fire Wall
Additional fees may be assessed for multiple I~e-inspections. For Re-inspection, call Inspection Message
Line at (360) 385-2294 prior to 8:00 AM. (NO OCCUPANCY UNTIL APPROVED BY DSD.
OCCUPANCY REQUIRES WRITTEN APPROVAL BY DSD.)
^ APPROVED ^ APPROVED WITH CORRECTIONS ^ NOT APPROVED
SEE BELOW SEE COMMENT(S) BELOW
~~
~:'
•
Approved.p~ans and permit card must be on-site and available at time of inspection.
Inspector ` lr ~~ :;_.__ Date
Acknowledged by ~ _ Date