Loading...
HomeMy WebLinkAboutBLD02-1780 Waterman dt Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-17g Issued: 09/25/02 Parcel Number: 958200502/948302505 Job Address: 535 21`` Street Zoning: R-II Type: V-N Total Occupant Load: 4 Occupancy: R-3 Nature of Work: Lift house, build ADU on bottom floor Owner: Pamela Grav Contractor: Paul Kaase - PAULKC*061C5 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF(1TTTRFT) TN~PFC.TTnN~ APPRnVF.n/nATF. TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive OffMat to restrict sediment from leaving the site; okay to use existing gravel driveway GROUNDWORK PLUMBING d l~' Pressure Test G y Pipe Joints Exposed G~~ ~ ~/ S/ ~ ti~ Pipe Bedding Trap Seal Protections MONOLITHIC SLAB R-10 under entire slab & perimeter ~ -----` _.____R Hydronic Tubing Setbacks (~ ~~~ . Footings F ~ orms ~,),, , Reinforcement Engineered Holdowns ~; ~'` /~~~,~~ Engineered Concrete Beam over Cistern Anchor Bolts & Washers ~" ~ ~"~ Interior Footings - _... - w I d3 Deck Piers _..----------- ~.... _,__. _.__ -.. J _ . ~ 13 __._ - __ __ w CaU 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 •t Permit # BLD02-178 P REQUIRED INSPECTIONS FLOOR FRAMING Joists -existing 2 " x 6"with TJI sisters; engineered TJI plan on-site at time of inspection Joist Hangers Blocking Beams Treated Wood to Concrete Positive Connections PLUMBING: Rough-In (D-V-T & Clean outs) Gas Supply Water Supply Hydronic Floor Heat Water Hammer Arrestors @ clothes and dishwasher Hose Bibbs (backflow protection required) Pressure Reduction Valve required if pressure > 80 psi Water Heater R-10 in unheated space Seismic Straps Pressure Relief Valve drain to exterior MECHANICAL Boiler -manufacturer's installation instructions shall be on- site at time of inspection Whole House Fan - @ bath Kitchen/Utility/Bath-2 fans Environmental Air Exhaust ducting (with backdraft dampers), insulation (R - 4), and termination (located 3' from openings into building) FRAMING Walls Engineered Shear Walls Engineered Headers & Beams Treated Wood to Concrete Ceiling -one-hour occupancy separation Windows -escape Windows -safety glazing Windows U-factor - .40 or better NFRC window sticker must be on windows and doors at inspection time a~> G ~ ~ ~~ (b l~ ~~~ G ~ ~~D3 ~,, ~ ~ l IJ ~G / 03 ~~ ~/ 6) m~ ~,J c' ~ 1., C 1148 hours before you dig for utility line locates ~~ ~~~°`-~ J ~ t~.~ 1-800-424-5555 / Page2of4 I' ~ ~ ~ ~ ~ ~ ~~ ~ r- RF.nTTTRF.T) TN~PF.C'TTnNS APPROVED/DATE r~;~ a s~oza ~s rY~oor U-factor - 20 or better ~.~ ~ II Door one-hour rated door at stairwell `Air Seal }. \ v~ \~ ~° Fresh Air Intake (W~ndow Ports) ir~ u~ckin __ -- - -- ----~~- Weather Resistive Barrier -----..--_ _________"__~ _ INSULATION Floor (R- 10 under slab) ~ IG ~~ Walls - (R-21 ) Ceiling - (R-30) I ~~2g-lo3 Baffles or arr' r• aint DRY WALL NAILING Walls -one-hour rated walls Ceiling -one-hour rated ceiling between dwelling units Enclosed Usable Space under Stairs ' FINAL LPG House Numbers - 5"minimum / 5 ., S Plumbing ~ ~ Mechanical/Heating QJ` ~ / nsulation Certificate ~ apor Barrier Paint Certificate Smoke Detectors Deck/Stairs/Guardrail s/Handrail s Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 .~ Permit # BLD02-175 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must-be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done 6y the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval riot to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 ~~~oarr~,y~y~~ CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT ~Q'~`WA~Y'~~G INSPECTION REP/~ORT PERMIT NUMBER: C ~-°~ ~ ~ ~l ~~ Site Address ~~.3~ ~" ~~; ~-~ S,r ~~~r~ S~ Contractor ~ .5~~ ~~~~ Owner G~/!'~'l ~ ~~ ~o Date of Inspection C~ 11 y i ~--{p l/ Worksite or Cell Phone# 3 ~ J `~ ~ Z- ~ -S ~~ ~'~`- G~ ~~a''''°P ^ Erosion/Sediment Control ^ Plumbing/Top Out ^ Propane/Wood Appliance ^ Setbacks/Footings/LIFER ^ Propane Pipe/Pressure Test ^ Manufactured Home Set-u~~ ^ Foundation Walls ^ Propane Tank/Line ^ Fire Department ;~ ^ Footing Drainage ^ Mechanical ^ Temporary Occupancy ~`~+~ ^ Slab/Interior Footing/Insulation ^ Framing ^ Fees Paid ;j'~,~ ^ Groundwork/Plumbing Test ^ Insulation Final Occupancy ~S~u-j.f ^ Underfloor Framing ^ Interior Shear/BWP Nail ^ Other/Consultation ~ ~~~~ ~ S' ~ n ^ Ext. Shear Wall/Holdowns ^ Drywall/Fire Wall Additional fees may be assessed for multiple I~e-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. (NO OCCUPANCY UNTIL APPROVED BY DSD. OCCUPANCY REQUIRES WRITTEN APPROVAL BY DSD.) ^ APPROVED ^ APPROVED WITH CORRECTIONS ^ NOT APPROVED SEE BELOW SEE COMMENT(S) BELOW ~~ ~:' • Approved.p~ans and permit card must be on-site and available at time of inspection. Inspector ` lr ~~ :;_.__ Date Acknowledged by ~ _ Date