HomeMy WebLinkAboutBLD02-163•i
•
Waterman & IEatz Building
181 Quincy Street. Suite 301
Port Townsend, WA 98368
Phone: 360379:f208 Fai 360J85-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD02-163 Issued: 8/22/02 Parcel Number: 989-710-401
Job Address 511 Adams Street Zoning: R-II Type: V-N Occupancy: R-3/U-1
Total Occupant Load: 3/2 Nature of Work: New Single-family Dwelling w/ garage
Owner: Eleanor Bode Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.(ITTTRFTI TNCPF.f TTCINC
APPRnVF:n/1)ATF
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2
Silt Fence as needed
Drive Off Mat per attached details
FOOTINGS
Setbacks
~ ~~~ Z '
Footings ~ ~
Forms
Reinforcement
Interior Footings
Chimney Footing
Por leis
FOUNDA ION
CMU Stem Wall ~ ~~ ,
Forms
Reinforcement -bond beam required at top of wall
Anchor Bolts w/ square washers - S/8"per engineering ~
Vents - 9 required
Crawl Access ~ , / f Q ~
Beam Pockets
Engineered Holdowns
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 5
Building Permit #BLD02-163
REQUIRED INSPECTInNS APPRnVF.D/i~ATF,
SLAB -Non-Structural @ garage
Engineered Holdowns
FLOOR FRAMING
Engineered BCI plan to be on-site @ time of inspection
Girders
Joists
Blocking
Shield under Posts
Positive Connection
Girder to Concrete
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers - S/8"per engineering
PLUMBING:
Rough-In (D-V-T & Clean Outs)
Water Supply
Gas Supply ~
~(0 1~~~ ~~Pl~
Water Hammer Arrestor @ clothes & dishwasher _ o
l'
G~
~
~~
Hose Bibs (backflow protection. required) ~°
f
~
Pipe Insulation - R-3
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
18" A.F.F.
Pressure relief valve drain to exterior
MECHANICAL
LPG Furnace & LPG Fireplace
Manufacturer's Installation Instructions to be
on-site @ time of inspection
Ducts & Duct Insulation -Supply/fresh air ducts in
conditioned space: R-4; heating ducts in unconditioned
space: R-8
Whole House Ventilation
HVAC Integrated Fresh Air
7" Smooth Duct minimum
Terminal Element - 8"
Clock timer on furnace fan
Other than motorized damper requires letter
of certification for flow rates
See neat a e
3'~
~~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
Building Permit #BLD02-163'
•
•
•
RF,nT1TRF,T) TN~PF,C:TInNS APPROVED/DATE
MECHANICAL continued
Source Specific Fans
Environmental Air Exhaust ducting (with
backdraft damper), insulation (R-4) and terminus
(located 3' from opening)
FRAMING
~
Walls
Engineered Shear Walls .:~ C~1~ 2 `~ I (~3 ° t~--~ ~,_ ~ ~~ S t ~~. (~~'~ y~
Block all panel edges
Roof -Engineered truss plan to be on-site at
time of inspection
Attic Venting -ridge & soffit
Ceilings
Posts, beams & headers -engineered versa-lam
plans to be on-site at time of inspection
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on
Windows & doors at inspection time
-- __ .,.
Air Seal _ _
__ ~~J ~,Qu\ ~~_ ~ S
Doors Ufactor - .20 or better
Rafter/Truss Positive Connection
Fire Blocking
Weather Resistive Barrier
CHIMNEY
Chimney Foundation
Chimney Reinforcement
Chimney Straps
Clearance to Combustibles
INSULATION
Floor (R-30)
Wall (R-21)
Ceiling (R-38) -~ - c-
~~ ~ ~ ~ ~ 3
Baffles
Vapor Barrier: paint
Crawl space - 6 mil black poly
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
Building Permit #BLD02-163 a
DRY WALL NAILING
Walls
Ceiling
Garage/House Occupancy Separation
~ )9103
Enclosed Usable Space under Stairs
Interior Braced Wall Panels
LPG p G-- lZ.a ~ Q S .~, //
~ ~ Y~ 1 ~3
Public Works Sign-Off
" ~ LL, ~ ~'"'"'
'~'
House Number - S
numbers ~
~
Plumbing
Mechanical -Ventilation Certification for
Integrated System
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation priori
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shalt review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. •
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
Building Permit #BLD02-163
8. All building permits ezpire if no progress has been made within si% months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
. your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5
•
CITY OF PORT TOWNSEND
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phoue:360-379-3208 Fax 360-385-7675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD02-163R-1 Issued: 9/30/03 Parcel Number: 989-710-401
Job Address 511 Adams Street Zoning: R-II Type: V-N Occupancy: R-3/LT-1
Total Occupant Load: 3/2 Nature of Work: Revision 1; Delete furnace. upgrade stove. install
fresh air & heat recoverv system
Owner: Eleanor Bode ~ Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: SEE ORIGINAL PERMIT FOR OTHER INSPECTIONS
Kl:OU1KED INSPECTIONS
MECHANICAL
LPG Fireplace
Manufacturer's Installation Instructions to be
on-site @ time of inspection
Ducts & Duct Insulation -Supply/fresh air ducts in
conditioned space: R-4; heating ducts in unconditioned
space: R-8
Whole House Ventilation
HVAC -heat recovery system
7" Smooth Duct minimum
Terminal Element - 8"
Clock timer on furnace fan
Other than motorized damper requires letter
of certification for flow rates
Source Specific Fans
Environmental Air Exhaust ducting (with backdraft
damper), insulation (R-4) and terminus (located 3' from
opening)
APPROVED/DATE
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #BLD02-163R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a ----
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per. year to keep
your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the Building
Department at 379-5086 rior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
•
• •
~o~' p°RT TOwy~ CITY OF PORT TOWNSEND
o DEVELOPMENT SERVICES DEPARTMENT
> , ~ = INSPECTION REPORT
~ ~'~
~` a`w For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: ~l ~ l~~ FERMIT NUMBER: ~LQ OL -'~~.3
SITE ADDRESS: .~ ~-
PROJECT NAME: ,L v CONTRACTOR: ~~-
CONTACT PERSON: ~~y ~T v ~ T PHONE: .34~' Z4~
^ APPROVED ^ APPROVED WITH ^ NOT APPROVED
CORRECTIONS
~.~ Ok to proceed. Corrections will be Call for re-inspection before
~~~~ ---- checked at next inspection proceeding.
Ins ector ~ Date ~~ ~ fl '
r ,~
Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may
be assessed if work is not ready for inspection.
TYPE OF INSPECTION: ~/QIA~_