Loading...
HomeMy WebLinkAboutBLD02-163•i • Waterman & IEatz Building 181 Quincy Street. Suite 301 Port Townsend, WA 98368 Phone: 360379:f208 Fai 360J85-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-163 Issued: 8/22/02 Parcel Number: 989-710-401 Job Address 511 Adams Street Zoning: R-II Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 3/2 Nature of Work: New Single-family Dwelling w/ garage Owner: Eleanor Bode Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.(ITTTRFTI TNCPF.f TTCINC APPRnVF:n/1)ATF TEMP EROSION & SEDIMENT CONTROL See General Condition #2 Silt Fence as needed Drive Off Mat per attached details FOOTINGS Setbacks ~ ~~~ Z ' Footings ~ ~ Forms Reinforcement Interior Footings Chimney Footing Por leis FOUNDA ION CMU Stem Wall ~ ~~ , Forms Reinforcement -bond beam required at top of wall Anchor Bolts w/ square washers - S/8"per engineering ~ Vents - 9 required Crawl Access ~ , / f Q ~ Beam Pockets Engineered Holdowns Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 5 Building Permit #BLD02-163 REQUIRED INSPECTInNS APPRnVF.D/i~ATF, SLAB -Non-Structural @ garage Engineered Holdowns FLOOR FRAMING Engineered BCI plan to be on-site @ time of inspection Girders Joists Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers - S/8"per engineering PLUMBING: Rough-In (D-V-T & Clean Outs) Water Supply Gas Supply ~ ~(0 1~~~ ~~Pl~ Water Hammer Arrestor @ clothes & dishwasher _ o l' G~ ~ ~~ Hose Bibs (backflow protection. required) ~° f ~ Pipe Insulation - R-3 Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places 18" A.F.F. Pressure relief valve drain to exterior MECHANICAL LPG Furnace & LPG Fireplace Manufacturer's Installation Instructions to be on-site @ time of inspection Ducts & Duct Insulation -Supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventilation HVAC Integrated Fresh Air 7" Smooth Duct minimum Terminal Element - 8" Clock timer on furnace fan Other than motorized damper requires letter of certification for flow rates See neat a e 3'~ ~~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Building Permit #BLD02-163' • • • RF,nT1TRF,T) TN~PF,C:TInNS APPROVED/DATE MECHANICAL continued Source Specific Fans Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (located 3' from opening) FRAMING ~ Walls Engineered Shear Walls .:~ C~1~ 2 `~ I (~3 ° t~--~ ~,_ ~ ~~ S t ~~. (~~'~ y~ Block all panel edges Roof -Engineered truss plan to be on-site at time of inspection Attic Venting -ridge & soffit Ceilings Posts, beams & headers -engineered versa-lam plans to be on-site at time of inspection Windows -escape Windows -safety glazing Windows Ufactor - .40 or better NFRC window sticker must be on Windows & doors at inspection time -- __ .,. Air Seal _ _ __ ~~J ~,Qu\ ~~_ ~ S Doors Ufactor - .20 or better Rafter/Truss Positive Connection Fire Blocking Weather Resistive Barrier CHIMNEY Chimney Foundation Chimney Reinforcement Chimney Straps Clearance to Combustibles INSULATION Floor (R-30) Wall (R-21) Ceiling (R-38) -~ - c- ~~ ~ ~ ~ ~ 3 Baffles Vapor Barrier: paint Crawl space - 6 mil black poly Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Permit #BLD02-163 a DRY WALL NAILING Walls Ceiling Garage/House Occupancy Separation ~ )9103 Enclosed Usable Space under Stairs Interior Braced Wall Panels LPG p G-- lZ.a ~ Q S .~, // ~ ~ Y~ 1 ~3 Public Works Sign-Off " ~ LL, ~ ~'"'"' '~' House Number - S numbers ~ ~ Plumbing Mechanical -Ventilation Certification for Integrated System Insulation Certificate V. B. Paint Certificate Smoke Detectors Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation priori work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shalt review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 Building Permit #BLD02-163 8. All building permits ezpire if no progress has been made within si% months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep . your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 • CITY OF PORT TOWNSEND Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phoue:360-379-3208 Fax 360-385-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-163R-1 Issued: 9/30/03 Parcel Number: 989-710-401 Job Address 511 Adams Street Zoning: R-II Type: V-N Occupancy: R-3/LT-1 Total Occupant Load: 3/2 Nature of Work: Revision 1; Delete furnace. upgrade stove. install fresh air & heat recoverv system Owner: Eleanor Bode ~ Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: SEE ORIGINAL PERMIT FOR OTHER INSPECTIONS Kl:OU1KED INSPECTIONS MECHANICAL LPG Fireplace Manufacturer's Installation Instructions to be on-site @ time of inspection Ducts & Duct Insulation -Supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventilation HVAC -heat recovery system 7" Smooth Duct minimum Terminal Element - 8" Clock timer on furnace fan Other than motorized damper requires letter of certification for flow rates Source Specific Fans Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and terminus (located 3' from opening) APPROVED/DATE Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD02-163R-1 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a ---- minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per. year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 rior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 • • • ~o~' p°RT TOwy~ CITY OF PORT TOWNSEND o DEVELOPMENT SERVICES DEPARTMENT > , ~ = INSPECTION REPORT ~ ~'~ ~` a`w For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: ~l ~ l~~ FERMIT NUMBER: ~LQ OL -'~~.3 SITE ADDRESS: .~ ~- PROJECT NAME: ,L v CONTRACTOR: ~~- CONTACT PERSON: ~~y ~T v ~ T PHONE: .34~' Z4~ ^ APPROVED ^ APPROVED WITH ^ NOT APPROVED CORRECTIONS ~.~ Ok to proceed. Corrections will be Call for re-inspection before ~~~~ ---- checked at next inspection proceeding. Ins ector ~ Date ~~ ~ fl ' r ,~ Approved plans and permit card must be on-site and available at time of inspection. A re-inspection fee may be assessed if work is not ready for inspection. TYPE OF INSPECTION: ~/QIA~_