HomeMy WebLinkAboutBLD02-154~ 4 r _~ Building and Community Development Waterman 8c Katz Building 181 Quincy Street Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7673 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-154 Issued: 07/31/02 Parcel Number: 932 400 006 Owners: William & Kav Bohren Installer: Kozeliskv's Home Services WAINS0626 Job Address: 750 Memorv Lane Zoning: R-II Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 4/1 Nature of Work: Set Manufactured Home with attached site-built >iaras:e See BLD02-154R-1 for detached 220 sq. ft. storage building GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 * * *Hours of Construction are limited to 7:30 ~x m. to 6: 00 p. m. Monday through Friday and prohibited on weekends and national holidays*** RF,nTTTRF,n TNSPFCTTnN~ APPRnVFn/nATF TEMPORARY EROSION & SEDIMENT CONTROL See details attached to Street Development Permit SDP02-024 and general condition #Z Silt Fence Drive Off Mat SLAB/CONCRETE Setbacks ~ ~ ~" `~ ~~' ~ ~~,'~ `~ ~' ~ ~ Forms ' Monolithic Slab/Foundation (garage) Reinforcement Anchor Bolts ~~/~~/OZ C~ Deck Piers Alternate Braced Wall Panel Holdown Hardware LIFER Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 Permit # BLD02-i54 ~ ~ ~~ REQUIRED INSPECTIONS AppunvFn/neTF PLUMBING (prior to skirting) Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, min. ~/ "diameter, same as supply pipe Pressure Reduction Valve if > 80 psi Hose Bibs (backflow protection required) ~ I°f p~ Pipe Insulation -Outside & in crawl space l c (J Pressure Test -100 p.s.i. for 15 minutes Pressure relief valve drain - to exterior of skirting, exhaust downward between 6"and 24"above ground Drainage Piping -sloped min. '/e "per foot MECHANICAL (prior to skirting) D t & D I l i uc s uct nsu at on Dryer Exhaust -vented to outside. Extension into crawl space (,~ ~°~ ~j requires venting through skirting with no dips; follow dryer c manufacturer's instructions; total combined length of ducting not to exceed 14' w/ 2-90° elbows FLOOR FRAMING (prior to skirting) h Anc ors Steel Support Piers -Load-stamped and installed per ~J I7 ~ D manufacturer's installation manuat; clearance of IS"min. from / / / lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12 "min. elsewhere unless installation manual specifies; otherwise area around home graded to provide runoff away from home. FRAMING: Engineered roof truss plan to be on-site at time of inspection Walls Alternate Braced Wall Panels Header Roof Garage/House Attachment DRY WALL NAILING Garage/House Occupancy, Separation with 20 minute self-closing door r Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 l Permit # BLD02-154 C;'1'1UlV FINAL Public Works Sign-Off Electrical (L & I) Sign-Off House Number -minimum 5" numbers Plumbing Mechanical Final -Building No holes or gaps greater than '/. "allowed in skirting. Skirting to be rated for contact with earth if backf~ll is involved Crawl space ventilation per installation manual @ 1 sq. ft./ISO sq. ft. (1~req'd); ~7 located close to corners, on of least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home; minimum 18"x 24" unless specified otherwise; covered with vinyl, pressure-treated wood or metal. ~ ~h GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized-with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. • 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 i Peemit # BLD02-254 ~! s 8. All building permits expire if no progress has been made within six months, or if no inspections are i done by the Building Department within one year. Call for at least one inspection per year to keep yo>ir~ building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 . - • • Building and Community Development Waterman & Katz Building 181 Quincy Street Suite 301 PortTown.4end, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT ~ INSPECTION RECOIZD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-154R-~ Issued: 07/31/02 Parcel Number: 932 400 006 Owners: William & Kav Bohren Installer: Kozelisky's Home Services WAIN50626 Job Address: 750 Memorv Lane Zoning: R-II Type: V-N Occupancy: U~1 Total Occupant Load: N/A Nature of Work: Set 220 sa. ft. storaee shed See BLD02-154 for manufactured home and attached garage. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 ~ ~ Hours of Construction are limited to 7: 30 a. m. to 6: 00 p. m. Monday through Friday and prohibited on weekends and national holidays RFCIIJIRFD IN~PFC'TInNS APPRnVF,n/nATF, TEMPORARY EROSION & SEDIMENT CONTROL See details attached to Street Development Permit SDP02-024 and general condition #2 Silt Fence Drive Off Mat FOUNDATION Setbacks 4 x 8 treated skids Tension Straps Holdown Anchors Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit # BI.D02-154R-1 ~ RE UIRED INSPECTIONS APPROVED/DATE FINAL FinaUBuilding • GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 • ~p~QpRTTp~~s~ CITY OF PORT TOWNSEND PUBLIC WORKS z U - ~ DEVELOPMENT SERVICES DEPARTMENT N~ Etc `•. -02 9T - ~p~ INSPECTION REPORT FpP WASN~e` PERMIT NUMBER: ~f.,..C~ f^; ~' -- ~ ~' ®'~ Address ~~`-_~~=' ~~i~- r)'If='!% c~' 1~:~+f~~~ _.~ Contractor ~ ~ ~-~ ~ =~> ~~~~ Owner ~-t~ k "_i_d !~ 1ti i -.1. ~ i~ ~ 1~~;. ~ ~'_~"_ ti.f Date of Inspection ~ ~' ~ ~ - G' ~ f • Worksite or Cell Phone# ~y ~;~ ~- K 'c; - ~l° ^ Erosion/Sedimentation ^ Plumbing/Top Out ^ Drywall/Fire Wall ^ Setbacks/Footings/LIFER ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance ^ Foundation Walls ^ Propane Tank/Line ^ Manufactured Home Set-up ^ Slab Interior Footing/Insulation ^ Mechanical ^ Public Works ^ Groundwork/Plumbing Test ^ Framing ^ Other/Consultation ^ Underfloor Framing ^ Insulation `3i~'~ ' AG,. T~15~-(!T,~L/~/ ^ Shear Wall/Holdowns ^ Interior Shear/BWP Nail FINAL If corrections required, re-inspection must be done prior to coverings or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZ ~BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ~ ^ VIOLATION , i~ APPROVAL ^ CORRECTION REQUIRED ^ APPROVED WITH CORRECTION ` ^ NEED APPROVED PLANS & PERMIT ON SITE Approved plans and permit card must be on-site and available at time of inspection. a Inspector _____ _ ~ _ ___ _._ Date ___ ~ ~ ~_ Y ~ _~/ ' ~