Loading...
HomeMy WebLinkAboutBLD02-151' Waterman ~ Katz Building 181 Quincy Street, Suite 301 ~ ~ Port Towagend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-151 Issued: 08/23/02 Parcel Number: 992300047 Job Address: 4420/4422 San Juan Ave Zoning: R-2 Type: V-N Occupancy: R-3 Total Occupant Load: 4/1 Nature of Work: Construct single-family duplex residence (see BLD 02-151R1 for ADU) Owners: Fitzpatrick. Connie Contractor: B&D Construction - BCON* *035N8 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: All elements of engineering require inspection prior to cover RF.(~ITTRFn TN~PFf'TTnN~ APPR(1VFn/nATF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~~~~ Footings ~ Forms Reinforcement Interior Footings Porch/Deck Piers UFER Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Permit # BLD02-1 S 1 ti ` REnT1IRED T1~T~PF.C~TTnNS AppRnvFnms~ FOUNDATION Stem Wall Forms Reinforcement ABWP Holdowns Anchor Bolts & BP washers Vents -11 required Crawl Access FLOOR FRAMING Jois~e ~no veered BCI plan shall be on-site at time of ~~ ~v S d .~C . ~~ ~` Blockin g /°~°"`~ ~'~ u-e.. G &~!w, w Positive Connections Treated Wood to Concrete ~/fit " ~ ~ Anchor Bolts & Washers / ~ Foundation knee wall ~~ / C~' PLUMBING. Rough-In (D-V-T & Clean outs) Water Supply f ~ Water Hammer Arrester @ clothes & dishwashers D~ ~l~ Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under Seismic Restraint -strap tank @ 1/3 points 18"A. F. F. Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan @ Bath Sowce Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) ~~ ~~ (f ~- Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Permit # BLDOZ-151 ~ v REOIJIRED INSPECTIONS APPROVED/DATE FRAMING ti t of d ti f d k h ll ll W on o ro ec our wa separa on oun a s -one a between DU / ~// ~i 0~ Ceilings ( t/ Roof -Engineered truss plan to be on site at inspection Blocking Truss Positive Connections Roof Venting - eave and gable vents Windows -escape Windows -safety glazing Windows Ufactor - .40 or better for unlimited glazing NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (window ports) Doors U-Factor - .20 or better/R.ated doors @ garage/house Air Seal Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30 ) Walls (R-21) if Z ~ a~ Ceiling (R-38 ) . Vapor Barrier: paint affles 6 mil black poly DRY WALL NAILING One- hour between dwelling units Interior braced wall panels as noted /~ Z a~ Walls Ceiling Garage/House Occupancy Separation FINAL ~~~- ~~ S'.~ Z 2~ G~ Public Works Sign-Off N 5" i H b i ~~ G L ~ ~'~~\' n mum um ers - m ouse Plumbing Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page3of4 Pvmit # BLD02-151 y 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction;. call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner. or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works aunroval must be received urior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per. year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. . 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. f Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 Waterman 8e Katz Building s^ 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-151R-1 Issued: 08/23/02 Parcel Number: 992300047 Job Address: 4426 San Juan Ave. Zoning: R-2 Type: V-N Total Occupant Load: 2/2 Occupancy: R-3/U-1 Nature of Work: Construct 624 square foot ADU w/ attached garage/shog Owner: Connie Fitzpatrick Contractor: B&D Construction - BCON* *035N8 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 RFnTTTRF.T) TN~PF(^'TTnN4 APPRnVF.T)/T)ATF, TEMP EROSION & SDM'T CONTROL See General Condition No. 2 & attached SDP 02-023 ~ Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS -per structural design (under ridge ~ ~ beam Z©ads) ~t 0~ Setbacks Footings Forms Reinforcement Interior Footings Porch/Deck Piers FOU ATION -per structural design Stem Wall Forms Reinforcement Engineered Holdowns Anchor Bolts & BP washers- per engineered shear wall schedule Ca1148 hours before you dig for utility tine locates 1-800-424-5555 Page 1 of 4 1 Pamit!{ BLD02-ISIR-I REOi1IRED iN~PF_.C'.TinN~ APPR (1VT.11/il A TF PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Gas Supply Water Hammer Arrestor @ dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground 18"A. F. F. R-10 under -- - - _ _ -- - _ - - - ~ D ~'D/0 Z.,, MECHANICAL LP Fireplace ~D~~ D'L, Whole H use F n - bat o a @ h 4 Kitchen Fan Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) FRAMING Walls -one hour wall & ceiling per plans to separate garage/ADU ~ D ~ O , Engineered Shear Walls Joists -engineered TJI plan. shalt be on-site at time of Inspection Engineered Floor Straps/Holddowns Engineered Posts, Beams Roof -Engineered beam @ ridge Blocking Rafter Positive Connections Roof Venting - eave and ridge vents Windows -escape Windows -safety glazing Windows Ufactor - .40 or better for unlimited glazing NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Window Ports) Doors U-Factor - .20 or better Air Seal Fire Blocking Weather Resistive Barrier J r 1 Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 . REOUIREDINSPECTIONS Permit # BLD02-151R-1 APPRnVED/DATE INSULATION Floor (R-30) ~~ L ~J~ Walls (R-21) Ceiling (R-38) Vapor Barrier: paint ~~ /l ~ 6 ~ Baffles DRY WALL NAILING Walls Ceiling GaragelADU Occupancy Separation FINAL House Numbers @ ADU - 5"minimum ~ l ~ ~~ Plumbing Mechanical/Heating Deck/Stairs/Landings Insulation Certificate Vapor Barrier Paint Certificate ^moke Detectors ?inal -Building r Call 48 &ours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 ~*. Permit#BLD02-151Rd • 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business License. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection. is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10, POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page4of4 City of Port Townsend Building & Community Development Watennan & Katz Building 181 Quincy Street Port Townsend, WA 98368 (360) 379-3208 Fax: (360) 385-7576 CERTIFICATE OF OCCUPANCY BLD02-151 and BI.D02-151R-1 • Owner: Connie Fitzpatrick Address: 4420, 4422 and 4426 San Juan Avenue Location: Port Townsend, WA 98368 Building (or portion): New Duplex with Garages, and detached Accessory Dwelling Unit Use(s) permitted: Residential (R-3/U-1) The above-referenced building or portion complies with the applicable requirements of the Port Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used and occupied in the use and manner indicated above. This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not be removed except by the Building Official. ~~ ~-~0- Approved: C. L. Flint 02/28/03 Building Inspector Date • • •