HomeMy WebLinkAboutBLD02-114Waterman ~ KatzBuilding
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
` CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD02-114 Issued: 07/26/02 Parcel Number: 936900801
Job Address: 5051/5053 (ADU) Landes Street Zoning: R-I Type: V-N Total Occupant Load: 4/1
Occupancy: R-3/U-1 Nature of Work: Construct Single family residence with detached garage/ADU; see
R-1 for garage/ADU
Owner: Keith & Crystie Kisler
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.(ITTTRF.TI TNCPF.f TT(lNC
APPRnVED/I~ATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2 & attached SDP 02-019
Silt Fence as needed
~' Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Interior Footings
Porch/Deck Piers
UFER
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers
Vents - 4 required
Crawl Access
Engineered Holdowns
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit # BLD02-I 14
REQUIRED INSPECTIONS
APPROVED/DATE
FLOOR FRAMING
Girders
Hydronic Heat Tubing
Joists
Blocking
Shield under Posts
Positive Connections
Girder to Concrete
Post-to-Foundation Wall Positive Connection
Treated Wood to Concrete
Positive Connections
PLUMBING:
Rough-In (D-V-T & Clean outs)
Gas Supply
Water Supply
Water Hammer Arrestor @ clothes and dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater/Boiler ~
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
Boiler -installation instructions shall be on-site at
time of inspection
Whole House Fan - @ F-1 bath
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3' from
openings)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
t
i
RF.f1TTTRF.TI TNCPF.f'TTnN4
APPROVED/DATE
Pemtit # BLDOZ-114
Y'RAMING
Walls
ngineered Shear Walls
"
o.c.
Engineered Timber Joists - DF#1. 4 x 10 @ 30
Engineered Headers & Beams
Treated Wood to Concrete
Ceiling/Roof - BCI attic joists
Rafter Positive Connection
Engineered rafter/jloor joist connection
Roof Venting - @ eave & ridge
Windows -escape
Windows U-factor - .45 or better
NFRC window sticker must be on windows
and doors at inspection time
Skylight - .68 or better
Air Seal
Fresh Air Intake (Wall Ports)
Doors U-factor - .40 or better
Fire Blocking
Weather Resistive Barrier
Weep Screed
INSULATION
Floor (R- 25 )
'Vans-(R-l9)
'eiling - (R-38/30 )
Baffles
Vapor Barrier: paint
6 mil black poly in crawl space
DRY WALL NAILING
Walls
Ceiling
FINAL
Public Works Sign-Off
LPG
House Numbers - 5"minimum
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Bamer Paint Certificate
Smoke Detectors
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
.'
Permit # BLD02-114
1
GF. A .CONDITIONS
~..
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and• graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
i for utili line locates
Ca1148 hours before you d g ty
1-800-424-5555
Page 4 of 4
• •
Waterman ~ Katz Building
181 Quincy Street, Suite 301
Part Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385.7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Cat1385-2294 for Inspection
Permit Number: BLD02-114R-1 Issued: 07/29/02 Parcel Number: 936900801
Job Address: 5051/5053 (ADUI Landes Street Zoning: R-I Type: V-N Total Occupant Load: 4/1
Occupancy: R-3/iJ-1 Nature of Work: Construct 280 square foot ADU w/ attached garage/shop
Owner: Keith & Crystie Kisler
•
•
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.(1TTTRF.TI TNCPF.f TT(1NC
APPRnVF.n/nATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2 & attached SDP 02-019
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
SLAB ~~ ~~
Setbacks
Forms f
Monolithic Slab/Foundation `
Hydronic Heat Tubing @ADU slab
R-l0 under entire slab
Reinforcement
Interior Footing with R-10 thermal break
Porch/Deck Piers
LIFER
Groundwork Plumbing
Pressure Test
Pipe Joints Exposed
Pipe Bedding
Ca1148 hours before you dig for utility tine locates
1-800-424-5555
Pagelof4
Permit # BLD02-11~sR-1
REQUIRED INSPECTIONS
APPROVF.n/nATF,
PLUMBING:
Rough-In (D-V-T & Clean outs)
Gas Supply
Water Supply
Water Hammer Arrestor @ clothes and dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve .if > 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
18" A. F. F. if located in garage
R-10 under if electric & located on garage slab
~/ l ~ ~ L
MECHANICAL
LPG Furnace -installation instructions shall be on-site
at time of inspection / ~/ q
` ~~ 0 6 `'
Whole House Fan - @ bath
Kitchen Fan
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3' from
openings)
FRAMING
Walls
Treated Wood to Concrete ~l ~ ~ Qlj
Headers & Beams
Treated Wood to Concrete
Ceiling/Roof -engineered garage. truss plan on-site at
time of inspection
Rafter/Truss Positive Connection
Roof Venting - @ eave & ridge
Windows -escape
Windows U-factor - .45 or better
NFRC window sticker must be on windows
and doors at inspection time
Skylight - .68 or better
Air Seal
Fresh Air Intake (Wall Ports)
Doors U-factor - .40 or better
Fire Blocking
Weather Resistive Barrier
Weep Screed
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
.,
Permit # BLD02-I 14R-1
RF.(1TTTRFT) TNCPF.CTI(1NS
APPROVED/DATE
INSULATION
lab (R- 10 under with thermal break (a7 garage/ADU )
19
ll
R
J
)
-
a
s - (
~
Ceiling - (R-38/30 ) r/ ~~ ~~
Bales
Vapor Barrier: paint
DRY WALL NAILING
Walls
~ ~~~~ p ~
Ceiling
Garage/House Occupancy Separation
FINAL
LPG
" Z 1 ~(C ~ ~ I~- ~',~C C~ t
minimum
House Numbers @ ADU - 5
Plumbing
Mechanical/Heating ~~' (,~ CL
Insulation Certificate ~ ~~,,,,~ J~
Vapor Barrier Paint Certificate
Smoke Detectors
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permit #BLD02-11•«2-7
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before ou di for utili line locates
Y g tY
1-800-424-5555
Page4of4
' Waterman @ Katz Building
181 Quincy Street, Suite 301
Port Town.4end, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD02-114R-2 Issued: 02/26/03 Parcel Number: 936 900 801
Job Address: 5051/5053 (ADU) Landes Street Zoning: R-I Type: V-N Total Occupant Load: 4/1
Occupancy: R-3/U-1 Nature of Work: Change shop to living space to expand ADU
Owner: Keith & Crvstie Kisler
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
R F (1T TTR F.TI TN~PF f TT(1NC
FRAMING
.oft Walls, Headers & Beams
sitive Connections
Ceiling/Roof -see letter from engineer
Rafter Positive Connection
Roof Venting - @ cave & ridge
Windows -escape
Windows U-factor
See attached WATTSUN
Skylights
Air Seal
Fresh Air Intake (Wall Ports)
Doors U-factor - .44 or better
Fire Blocking
Weather Resistive Barrier
Weep Screed
INSULATION
Slab (R- 10 under )
Walls - (R-24 )
Ceiling - (R-38/30 )
Baffles
Vapor Barrier: paint
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLD02-114R-2
REQUIRED INSPECTIONS APPROVED/DATE
DRY WALL NAILING
Walls
Ceiling
FINAL
Wood Stove
" a 5 ~ ~~ ~ ~
House Numbers @ ADU - 5
minimum
Insulation Certificate !
~ ~~ ~~
Vapor Barrier Paint Certificate ~- G~
Smoke Detectors
Final -Building
~' ~''`"~°
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
3. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required --a
inspections.
4. Re-inspection is required after inspection report corrections are completed.
5. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
6. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
7. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
8. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page2of2
•
City of Port Townsend
Building & Community Development
Waterman & Katz Building ;
181 Quincy Street
Port Townsend,. WA 98368
(360) 379-3208 Fax: (360) 385-7576 ~ .
CERTIFICATE OF OCCUPANCY
BLD02-114 ,
Owner: Keith and Crystie Kislev •
Address: ~ 5051 Landes Street
Location: ~ Port Townsend, WA 98368
Building (or.portion): Single Family Residence - '
J.
Use(s) permitted: R-3
` Y
t
~ .
The above-referenced building or portion complies with the applicable requirements of the Port
Townsend Building Code (PTMC 16.04), has passed all required inspections and,may be used
and occupied in the use and manner indicated above.
This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not
be removed except by the Building Official.
~- ~ •
~~-~
Approved: Suzanne Wassmer October 6.2004
• ~ Permit Technician Date