Loading...
HomeMy WebLinkAboutBLD02-078Waterman & Katz Building 181 Quincy Stree4, Suiu 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD02-~7g Issued: OS-21-02 Parcel Number: 989-711-004 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Job Address: 1415 Clav Street Zoning: R-II Type: V-N Occupancy: R-3/U-1 Total Occupant Load:2/2 Nature of Work: Detached Garage with upstairs ADU Owner: Dennis Kelly & Elizabeth Crumley Contractor: Owner RF.nTTTRF.T) TNCPF.f TTC1N4 APPRnVF.n/nATF TEMP EROSION & SEDIMENT CONTROL Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site GROUNDWORK PLUMBING ~°s Pressure Test ~~~~~~' Pipe Joints Exposed Pipe Bedding MONOLITHIC SLAB FOUNDATION ~~` ~~~=` ~~hj Setbacks / Forms Reinforcement Anchor Bolts ~c~i(J~jRlr~p~ ~ij~ C ABWP Holdown Hardware Interior Footings Porch Piers UFER Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 n Permit # BI D02.178 - 'a &LOUIRED INSPECTIONS ``~. APPRnVF.n/nATF. LOOR FRAMING Joists -Engineered BCI plan on-site at time of inspec ' n Blocking Positive Connections ~ Treated Wood to Concrete ~ Anchor Bolts w/ 2" x 2"x 3/16" washers ~ PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply ~ Water Hammer Arrestor at clothes and dishwasher ~ Gas Supply °~ Hose Bibs (backflow protection required) Pipe Insulation (minimum R-3) ~ `, ~` Pressure Reduction Valve if > 80 psi ~ ~ Water Heater ~ Seismic Restraint - 2 places `_ Pressure relief valve drain to exterior, terminate 3 6" - 24" above ground ~' MECHANICAL LPG Heater and Water Heater -manufacturer's installation instructions shall be on-site at time of inspection Whole House Fan -Bathroom Kitchen Fan Garage Bath Fan /+ / FRAMING Walls / ~ ABWP Walls for 1~` of 2-stories Ceilings Roof Rafter Positive Connection Blocking Attic Venting - @ ridge & eave Windows -escape Window safety glazing Windows Ufactor - .70 or better NFRC window sticker must be on windows and doors at inspection time Air Seal Fresh Air Intake (Wald Ports) Fire Blocking Bather Resistive Barrier Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 J ~ Pemtit # BLD02-078 • REnI1IRED INSPECTIONS APPROVED/DATE INSULATION Floor (R-19 required) Walls (R-19) Ceiling f R-30) Bales _ __ vapor Bar"mer: Paint `~~ ~- `, DRY WALL NAILING P t Walls _: Ceiling ~ , Garage/House Occupancy Separation FINAL LPG House Numbers - 5" Plumbing S ~ Mechanical/Heating ,` ' ~ ~ 7 r Insulation Certificate Q Smoke Detectors Vapor Barrier Paint Certificate Landing, Stairs, Handrails, Guardrails Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shalt review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page3of4 Permit # BLD02~78 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residen~ial project. 8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before ou di for utili line locates Y g h' 1-800-424-5555 Page4of4