Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBLD98-223W'a[ertnan & Katz Building
I B I Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)379-fi923
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 far Inspection
Permit Number: BLD7H-OU223 ~DIU~T. A) ~V~ ~~<~~~ ~~/`~~~
~k ~~~ ~~~zlo~ ~ ~._
Issued: 4/29!99 Parcel Number: 957301702, -801 & -80~
Job Address: 1807 Water St. Zoning: CC=2 Type: V-1 Hr., Sarinklered Occupancy: R-1
Nature of Work: Addition to Existing Hotel of Two 3-Stow Buildings w/Basements-Bldg. A (11 Units, 8193
SF) & Bldg B {10 Units-#101 Accessible, 9800 SF)
Owner: Mr. Simon Lee-Tides Inn Motel Contractor: McNeilus Painting and Construction
Devon X360/458-li70 (o), 23/381-2620 (c)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Building -Sprinkler
Mechanical -Propane Tank Placement & Exterior Piping
Electrical -Contact Labor & Industries @ 360-417-2702
SPECIAL INSPECTIONS REOUH2ED:
CONCRETE-Strength, Reinforcement
MASONRY-Prism Testing, Reinforcement, 4' Lifts
EPOXY GROUTED-Anchor bolts, Reinforcement
HOURS OF CONSTRUCTION
per SEPA:
8: 00 AM to S: 00 PM
Monday -Friday
Work prohibited on weekends
And national holidays
NOTE: If Special Inspector and Agency Lab are not listed in WABO Register, Special Inspector
must present ICBO credentials to Building Department for approval PRIOR to any inspections.
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition No 2
Drive off mat
Silt fence
GROUND WORK PLUMBING
Pressure test
Pipe joints exposed
Pipe bedding
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 6
Permit d BLD98-00223 (,Bldg. A)
REQUIRED INSPECTIONS APPROVED/DATE
FOOTINGS
Setbacks
/~~ ~~
Footings ~
Uriderfloor space footings set into adjacent
ground 8" min.
Forms
Reinforcement
Anchor bolts & holdowns
Interior footings/piers
Eleva or pit
ER ~ ~~
FOUNDATION ~1
~ ~ L
Zl~
Stem wall h
6
Forms
Reinforcement `
Holdowns
Anchor bolts w/2"x 2"x3/I6" square washers '
Vents-18 typical foundation vents required
Water proofing-basement walls only
SLAB
R-10 insulation
CONCRETE MASONRY UNITS l ST'& Z L r~ t5 icy /1 E` f3, ~`G/¢~
~
d
Reinforcement
4' lifts ~
p~ OvT Gt6rM~ q/~/~Q ~ q,Qoar ~,Q~gY~L~-t. gy
BRICK VENEER
Attachment
Weep flashing at base
FLOOR FRAMING
Girders S~ 6 ~ ~ n
~O/y
/ (~/
Joists /
Positive connections
Treated wood to concrete
J
~'. 7~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 6
PermitkBLD98-00223 (Bldg. A}
r~
L
REQUIRED INSPECTIONS APPROVED/DATE
PLUMBING ~ ~ b ~ ~ f/ /^ /~ Z~~ s~~U
vv
Rough-in (D-W-V & clean outs)
Floor drain-trap seal protection 2 ` ~ (,l/ V ~ (~,/ 5 ~ ~ ~p 3~ 7/QO /~ n
~J l~Y
Water supply-re-circulating; insulation ~
Required on hot water supply
Gas supply
Hose bibs (backflow protection required)
Pipe insulation
Pressure reducing valve if> 80 psi ~
Water heaters
Seismic restraint - 2 places ~
P & T Relief valve to exterior
Barrier Free required several places
MECHANICAL-Split system heat
pumps/gas furnace; gas frunace (Bldg. A);
thru-the-wail heat pump (ea. unit), LPG fire
places/furnace (ea. Unit)
Factory applied nameplate
Manu's operating instructions attached
Unit ID'ed for area served
Access and work space for maintenance
Disconnect
Condensate drain to approved location
Ducting & duct insulation
Smoke/fire dampers
GWB lined joist bays
Whole house fans-(EF-1) 1.5 sones max., w/
programed time switch
Source specific fans
Environmental air exhaust ducting, insulation
& terminus (3' from building openings)
Dwelling unit fresh air-wall or window port
Fresh air for common areas per WSVIAQ-
contractor to provide certification letter for
fresh air per calculations
NREC temperature zones
Thermostat controls
Deadband control
Night setback w/7 different day types
Microprocessor controls w/heat indicates
Dampers
Ca11 48 hours before you dig for utility line locates
1-500-424-5555
Page 3 of 6
REQUIRED INSPECTIONS APPROVED/DATE
Permit # BLD98-00223 487dg. A)
FRAMING
See General Condition No. 3 ~2aw.-,u~ GL~IA~ren- ~o~s~" 3/
Floors/ceilings - 1 Hr.
Blocked floor diaphragm per detail Sheet S1
Walls - 1 Hr.
Shear wall nailing 1
~~ t rfi 2 5/~~
Roof-truss/wall positive connection '
Attic venting-eave & gable
Elevator shaft
Elevator hoistway venting
Decks
Windows
Safety glazing
40 U-factor-NFRC sticker must be on
windows at inspection time
Air Seal
Fresh air-wall or window port
Doors--.20 U-factor
Fireblocking
Firestopping
Draft stops-none required - sprinklered
Weather resistive barrier
INSULATION
Slab R-10 / .
~~ C ~ Z ~C> ~
Floor R-30
Wall R-19 _
Roof R-38
Baffles
Vapor barrier
DRYWALL NAILING
waus
~/L S/d p ~ Q
Ceilings 7 ~ ~~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 6
' .REQUIRED INSPECTIONS
APPROVED/DATE
Permit # BLD98-00223 (Bldg A)
LIGHTING
Per NREC Lighting Budget-attached
EXTERIOR LIGHTING PER SEPA
Call Jeff Randall, 379-3208, x1124
PARKING PER PTMC
Call Jeff Randall, 379-3208, x1124
LANDSCAPING
Call Jeff Randall, 379-3208, x1124
FINAL
Revaluation construction cost for additional
permit fees
Planning Department sign-off-Jeff Randall i
379-3208, xl 124
Fire Department sign-off
Public Works sign-off
EI ectrical sign-off (L&I)
Building Address
Barrier Free parking & access throughout
Plumbing
Mechanical/HVAC
Smoke detectors
Decks ',
Buildin
GENERAL CONDITIONS
1. To mitigate adverse air impacts due to dust during dry weather, construction areas shall be watered to
suppress dust. In order to reduce potential surface and ground water contamination, chemical dust
suppressants will not be used.
2. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
3. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures may include installation of silt fencing and
graveled construction entrance. Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed
during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 6
PertnitdBLD98-002:3 ryBIdg. A)
4. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
5. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
6. Re-inspection is required after inspection report corrections are completed.
7. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works aoaroval must be received arior to
scheduling the Building Deaartment's final inspection.
8. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
9. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 6 of 6
r
Waterman & Katz Building
181 Quincy Street Smte 30i
Pon Townsend, WA 98368
Ptwne: (360)3]9-3208 Fax'. (360)3"79-6923
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
,~n~~ ~~tl~nt~
Permit Nnmber: BLD98-00223 (Bldg. B) it ~- ,
( ~~ l~~
Issued: 4/29/99 Parcel Number: 957301702, -801 & -803 ~~ ! r ~' '
Job Address: 1807 Water St. Zoning: C`2 Type: V-1 Hr., Sarinklered Occupancy: R-1
Nature of Work: Addition to EYisting Hotel of Two 3-Story Buildings w/Basements-Bldg. A (11 Units, 8193
SF) & Bldg B (10 Units-#101 Accessible. 9800 SF)
Owner: Mr. Simon Lee-Tides Inn Motel Contractor: McNeilus Painting and Construction
Devon / 360/458-1670 (o), 253/381-2620 (c)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Building -Sprinkler
• Mechanical -Propane Tank Placement & Exterior Piping
Electrical -Contact Labor & Industries @ 360-417-2702
SPECIAL INSPECTIONS REOUH2ED:
CONCRETE-Strength, Reinforcement
MASONRY-Prism Testing, Reinforcement, 4' Lifts
EPOXY GROUTED-Anchor bolts, Reinforcement
HOURS OF CONSTRUCTION
per SEPA:
8: 00 AM to S: 00 PM
Monday -Friday
Work prohibited on weekends
And national holidays
NOTE: If Special Inspector and Agency Lab are not listed in WABO Register, Special Inspector
must present ICBO credentials to Building Department for approval PRIOR to any inspections.
RF(ITTIRFTlT1~IQPRf TT(lN~
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition No 2
Drive off mat
Silt fence
GROUND WORK PLUMBING
Pressure test
Pipe joints exposed
Pipe bedding
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 6
PertnitN BLD98-00:2'r (Bldg B)
RF.(~T1TRF.1~ INSPECTIONS APPROVED/DATE '
---~-
FOOTINGS
Setbacks (~,y
~/Z 7 Gil
Footings l
/ [ ~/l,
Underfloor space footings set into adjacent
ground 8" min.
Forms
Reinforcement
Anchor bolts & holdowns
Interior footings/piers
Elevator pit
LIFER
FOUNDATION
Stem wall I
~~ `~ l
Forms
Reinforcement
Holdowns
Anchor bolts w/2"x 2"x3/16" square washers '
Vents-18 typical foundation vents required
Water proofing-basement walls only
SLAB
R-10 insulation
CONCRETE MASONRY UNITS
Reinforcement
4' lifts
BRICK VENEER
Attachment
Weep flashing at base
FLOOR FRAMING
Girders
Joists
Positive connections
Treated wood to concrete
J
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 6
Parmrt k BLD9R-W?23 (Bldg. B)
•
Ci~
IN ~r>J~ i Luiv a
PLUMBING
Rough-in (D-W-V & clean outs)
Floor drain-trap seal protection
Water supply-re-circulating; insulation
Required on hot water supply
Gas supply
Hose bibs (backflow protection required)
Pipe insulation
Pressure reducing valve if> 80 psi
Water heaters
Seismic restraint - 2 places
P & T Relief valve to exterior
Barrier Free required several places
MECHANICAL!--Split system heat
pumps/gas furnace; gas frunace (Bldg. A);
thru-the-wall heat pump (ea. unit), LPG fire
places/furnace (ea. Unit)
Factory applied nameplate
Manu's operating instructions attached
Unit ID'ed for area served
Access and work space for maintenance
Disconnect
Condensate drain to approved location
Ducting & duct insulation
Smoke/fire dampers
GWB lined joist bays
Whole house fans-(EF-1) 1.5 sones max., w/
programed time switch.
Source specific fans
Environmental air exhaust ducting, insulation
& terminus (3' from building openings)
Dwelling unit fresh air-wall or window port
Fresh air for common areas per WSVIAQ-
contractor to provide certification letter for
fresh air per calculations
NREC temperature zones
Thermostat controls
Deadband control
Night setback w/7 different day types
Microprocessor controls w/heat indicates
Dampers
HYYtCV V IJ1J/ 1JH 11~,
,~'.Z ~i~~11~~~5 ~~~j~I
i
~v~-ors
~i/~rV
Ca11 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 6
Permit d BLD98-0022?(Bldg. B)
REQUIRED INSPECTIONS APPROVED/DATE
FRAMING
See General Condition No. 4 ~~.~' G{ /D
J / ^~(~~7'~ `N6 2 / (~
D~
Floors/ceilings - 1 Hr.
Blocked floor diaphragm per detail Sheet S1
Walls - 1 Hr.
Shear wall nailing ~
~^ ~~~~~~
Roof-truss/wall positive connection /
~G~
Attic venting-eave & gable
Elevator shaft
Elevator hoistway venting
Decks
Windows
Safety glazing
40 U-factor-NFRC sticker must be on
windows at inspection time
Air Seal
Fresh air-wall or window port
Doors--.20 U-factor
Fireblocking '
Firestopping
Draft stops-none required - sprinklered
Weather resistive barrier
INSULATION
Slab R-10 ~/„ ~/~
` iy /J
`/''lv
FloorR-30
Wall R-19
Roof R-38
(}'
~/Z r/ Q ~ "l,
Baffles /
Vapor barrier
DRYWALL NAILING
Walls
$/~/Q~ n~
~~ J~i ~ /C
Ceilings ~j/z s ~D D ~~
`~
Call 48 hours before you dig for utility line locates
i-800-424-5555
Page 4 of 6
REQUIRED INSPECTIONS APPROVED/DATE
•
Pe,mrt p BLD9&00223 (H ldg B)
LIGHTING
Per NREC Lighting Budget-attached
EXTERIOR LIGHTING PER SEPA
Cal] Jeff Randall, 379-3208, x1124
PARKING PER PTMC
Call Jeff Randall, 379-3208, x1124
LANDSCAPING
Call Jeff Randall, 379-3208, xl 124
FINAL
Revaluation construction cost for additional
permit fees
Planning Department sign-off-Jeff Randall
379-3208, x1124
Note: Prior to occupancy a revised Shoreline Public
Access Easement to be reviewed by BCD (Jeff '
Randall) & City Attorney & recorded w/Jefferson
County Auditor's Office
Fire Department sign-off
Public Works sign-off
Electrical sign-off (L&I)
Building Address
Barrier Free parking & access throughout
Plumbing
Mechanical/HVAC
Smoke detectors
Decks
Buildin
GENERAL CONDITIONS
1. To mitigate adverse air impacts due to dust during dry weather, construction areas shall be watered to
suppress dust. In order to reduce potential surface and ground water contamination, chemical dust
suppressants will not be used.
2. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
3. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures may include installation of silt fencing and
graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed
during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 5 of 6
Pertni[%BLD98-00225(Bldg. B)
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
4. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
5. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
6. Re-inspection is required after inspection report corrections are completed.
7. The Building Department is unable to pass Final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
scheduling the Building Deaartment's final inspection.
8. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non-
residential project.
9. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours pefore you dig for utility line locates
1-800-424-5555
Page 6 of 6