Loading...
HomeMy WebLinkAboutBLD98-213City of Port Townsend Water Street Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2375 HIGHLAND LP Parcel No: 955900048 Project; -CONTRACTOR/OWNE ALLEN WIEGAND 2375 HIGHLAND LOOP PORT TOWNSEND, WA 98368 Issued: 12/14/98 Lot: 48. Block: PERMIT # BLD98-00213 OWNE ALLEN WIEGAND 2375 HIGHLAND LOOP PORT TOWNSEND, WA 98368 rrwo~.v, vwvwr ~,v.. Single-family Residential: construct access ramp at entry to house. City Contact: JZ Type of work: ADD Construction Type of use: SFR Type 1: SN Census Category: 434 Type 2: Estimated Value: $1,900.Oo Type 3: Zoning: PUD SI Cade: Type 4: Construction Type/Occ UselOcc Load Occupancy Group is load 1: Group 2: Load 2: Group 3: Load 3: Group 4: Load 4: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection Date Inspector FOOTINGS -Setbacks -Porch/Deck Bay Piers FLOOR FRAMING -Joists -Shield Under Posts -Positive Connection -Treated Wood to Concrete FINAL Insp-See Special Conditions Final -Building S Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 City of Port Townsend 640 Water Street Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 2375 HIGHLAND LP Issued: 12/14/98 Parcel No: 955900048 Lot: 48' Block: Project: PERMIT # BLD98-00213 SPECIAL CONDITIONS /RESTRICTIONS 1 . FINAL: Landings required to be five (5) feet in direction of ramp run; ramp surface to be slip-resistant; one (1) handrail to extend 12 inches min. beyond ramp. GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corcections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates i 1-800-424-5555 Page 2 of 2