HomeMy WebLinkAboutBLD98-212Watermm B~ KaC BuiNing
181 Quinq Street, Suite 301
Port Tewnund~ WA 98368
Phone: 360J793208 Fnx 360J796927
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD98-00212 Issued: 02/04/199 Parcel Number: 951907305
Sob Address: 2812 Pearv Avenue Zoning: RR_1 Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 713 Nature of Work: New Sin¢le-family Dwelling wl earaee
Owner: William Rudoluh
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Mechanical -Propane Tank Placement & Exterior Piping
RF(1TTTRFI) TNCPRC"TTnNS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
Silt Fence
Drive Off Mat
GROUNDWORK PLUMBING _ , ;,~
, ~ l
Pressure test ,
-
Pipejoints exposed
Pipe bedding
FOOTINGS
Setbacks ~~~~~~
Footings
Forms
Reinfor
eck Bay Pier'
~
I~EIZ -_ _- '-
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
21 ~~~ ~~
Forms I c
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Waterproofing
sLAS
" Z~r4~99 C2,
R-10 rigid insulation @ perimeter < 24
below grade w/ thermal break @ garage
FLOOR FRAMING (okay @ framing) / L/~ ~y I ~ (~
NOTE: TJI submittal req'd to be on-site & `mil f
available to the Inspector @ time of inspection
Joists
Engineered Floor Diaphragm Nailing @
Living Room Cantilever w/ solid
blocking above basement wall
Engineered Floor Ties: TS 22 twist ties (2
locations) & RPS 22 (4 locations)
Positive Connection
Braced Wall Panel @ Ground Floor
Closet Cantilever req's continuous rim
joist w/joists dbl'd @ ea end ofBWP
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING:
Rough-In (D-V-T & Cin Outs) i//// ~~ /'
`T" (O "ll
Water Supply
Gas Supply
Hose Bibs (bckflw pro.req'd)
Pipe Insulation
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint - Z places
R-10 under if electric
Pressure relief valve drain to exterior
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
RF(TTiTRF,T) TNSPF.CTIONS APPROVED/DATE
u
MECHANICAL ~~r ~,~~ /~ Q
'
~`-'
LPG Heater -
Ducts and Duct Insulation
Whole House Ventilation -Utility Room
Source Specific Fans
Environmental Air Exhaust ducting, insulation
and terminus (located 3' from opening)
FRAMING: ~ ~~ ~~~ ~ ~~
NOTE: Engineered Truss Plan to be on-site /
for the Inspector @ time of inspection
Walls
Engineered Shear Walls @ Living Rm.
Cantilever & Gazage Wall Below
Roof - Eng' d truss
Attic Venting -ridge and eave
Ceilings
Posts, beams & headers
Windows -egress
Windows -safety glazing
Windows U factor
NFRC window sticker must be on
windows at inspection time
Air Seal
Door UFactor - .20 max.
Rafter/Truss Pos. Conn.
Fire Blocking
Weather Resistive Barrier
INSULATION ~ //~~(j~//~~ ~^~
Slab Perimeter/Thermal Break (R-10) T / 7
Floor (R-30) / ,-, M /
(
~t~# 1' ~~~
~ ~ 5 J
Wall (R-21) .
.
Ceiling (R-38 )
Baffles
Vapor Barrier: paint
DRY WALL NATLING
Walls //
`l~~~f ~ % / ~,
Ceiling
Interior Braced Wall Panels
Enclosed Space Under Stairs
Garage/House Occ. Separation
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
11V JYEl;11U1V J
FINAL
Public Works Sign-Off
Fire Dept. -LPG
House Number
Plumbing
Mechanical
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors
Final -Building
~/~9~~~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
.construction is complete. Applicant is responsible for protection otadjacent properties.
3. A11 elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedu}ing the Building Department's final inspection.
7. Certificate of Occupancy (commercial) and Final Inspection are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 4 of 4