Permit Number: BLD98-00210 Issued: 1/26//99 Parcel Number: 972600810
Job Address: .1671 31't Street Zoning: R-11 Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 512 Nature of Work: New Single-family Dwelling wf Qarase
Owner: C. L. Flint Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Mechanical -Propane Tank Placement & Exterior Piping
7?Ti l1TTi7?FTl TNCPF(''TT(1NC
APPRnVF,T)/DATE
TEMP EROSION & SDM'T CONTROL
Silt Fence
Drive Off Mat
GROUNDWORK PLUMBING
Pressure test
~ . \~ • ~~ ~~'
Pipe joints exposed
Pipe bedding
FOOTINGS ~ y5
Setbacks~b~. ~~1j ~, 1-'
\
Footings
Forms `~j,n,
~~P
Reinforcement ~,~ - 1
Interior Foo ' ickened Slab Footings
Pi
ers J
orch/Deck Bay
oSG. ~ob~• ~' 4-5 y
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
t.-- ~
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
Forms
~.~ `
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Engineered holdowns is & __--
garagebeam end @ base
Waterproofing
SLAB
R-10 rigid insulation @ perimeter w/ thermal
break @ garage
FLOOR FRAMING (okay @ framing)
Girders
Joists
Blocking for 1BWP
Positive Connection
Treated Wood to Concrete
Anchor Bolts & Washers
PL
Rough-In (D-V-T & Cln u ~~
Water Supply
~
Gas Supply '
~~
e Bibs (bckflw pro. re 'd C~ , ~ -~ (!
Pipe nsu ron
Pressure Reduction Valve if> 80 psi
Water Heater
18" A.F.F.
Seismic Restraint - 2 places
R-10 under if electric
Pressure relief valve drain to exterior
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
rr
'~
RF.OTTTRF,n TNSPECTIONS APPROVED/DATE
•
•
MECHANICAL
Furnace -LPG
~mbu is ions---- -__ _------------- _
_. __.
_ _-
Venting '~(
~- ~
Ducts & Duct Insulation -.
~i}
~ ~~
~~
~
__ ~
.
__
Whole House Fan - _ --
Source Specific Fan
Environmental Air Exhaust ducting, insulation
and terminus (located 3' from opening)
FRAMING:
- - -.__ `~L , (~;~p 17 `b ~ `~'~l r't
..~ ~}-
Walls -
Engineered Sfiear Walls - - - --
-_ __ -"-~
-- -
-
"
in eyed Roof Diaphragm agarage - - -
Roof-Eng'd truss plan req'd
at framing inspection
Attic Venting
Ceilings
Posts, beams & headers
Windows -egress.
Windows -safety glazing
Windows Ufactor - .60 max.
t b
i
k
NFRC
i
d n
~# ~ ' I
'~
~ ~ ~
e on
er mus
n
ow st
c
w O ~ _
,
}.
windows at inspection time
Air Seal
Fresh Air Intake (Window)
Door UValue - .40 max.
Rafter/Truss Pos. Conn.
Fire Blocking
Weather Resistive Bamer
INSULATION
Slab (R-10 )
Floor (R-19)
(R-30)
ceilin q
~ - ~
~
~~
g
Ba es~-"` ~ , 1
~,//~ ~
L
~"
~.`~ 1
Vapor Barrier: paint
DRY WALL NAII,ING
Walls
~[
~
Ceiling ~ ~t' .
i~ j~ ~ ,~
Interior Braced Wall Panels ~ ' ~~ ~f~""`
~
Garage/House Occ. Separation ~ ~`~' ,
~,~~
~
~
"
Enclosed Space Under Stairs /~~,~
'
~~,~'~~
Call 48 hours before you dig Tor utility line locates
1-800-424-5555
Page 3 of 4
,_,
a
RE
INSPECTIONS
TE
FINAL
LPG (Fire Dept.)
Public Works Sign-Off
Rouse Number
Plumbing
Mechanical
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Soils ezposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilize:
with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4