Loading...
HomeMy WebLinkAboutBLD98-210f '.. ~ Waterman & Kafx Building 1S1 Quincy Street. Suite 301 Par[ Towneend~ WA98368 PM1one: 36037937A8 Faa 3bOJ79fi973 CITY OF PORT TOWNSEND tip' -k~ 0~~ - R~° (o CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD98-00210 Issued: 1/26//99 Parcel Number: 972600810 Job Address: .1671 31't Street Zoning: R-11 Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 512 Nature of Work: New Single-family Dwelling wf Qarase Owner: C. L. Flint Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Mechanical -Propane Tank Placement & Exterior Piping 7?Ti l1TTi7?FTl TNCPF(''TT(1NC APPRnVF,T)/DATE TEMP EROSION & SDM'T CONTROL Silt Fence Drive Off Mat GROUNDWORK PLUMBING Pressure test ~ . \~ • ~~ ~~' Pipe joints exposed Pipe bedding FOOTINGS ~ y5 Setbacks~b~. ~~1j ~, 1-' \ Footings Forms `~j,n, ~~P Reinforcement ~,~ - 1 Interior Foo ' ickened Slab Footings Pi ers J orch/Deck Bay oSG. ~ob~• ~' 4-5 y Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 t.-- ~ RE UIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms ~.~ ` Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers Engineered holdowns is & __-- garagebeam end @ base Waterproofing SLAB R-10 rigid insulation @ perimeter w/ thermal break @ garage FLOOR FRAMING (okay @ framing) Girders Joists Blocking for 1BWP Positive Connection Treated Wood to Concrete Anchor Bolts & Washers PL Rough-In (D-V-T & Cln u ~~ Water Supply ~ Gas Supply ' ~~ e Bibs (bckflw pro. re 'd C~ , ~ -~ (! Pipe nsu ron Pressure Reduction Valve if> 80 psi Water Heater 18" A.F.F. Seismic Restraint - 2 places R-10 under if electric Pressure relief valve drain to exterior • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 rr '~ RF.OTTTRF,n TNSPECTIONS APPROVED/DATE • • MECHANICAL Furnace -LPG ~mbu is ions---- -__ _------------- _ _. __. _ _- Venting '~( ~- ~ Ducts & Duct Insulation -. ~i} ~ ~~ ~~ ~ __ ~ . __ Whole House Fan - _ -- Source Specific Fan Environmental Air Exhaust ducting, insulation and terminus (located 3' from opening) FRAMING: - - -.__ `~L , (~;~p 17 `b ~ `~'~l r't ..~ ~}- Walls - Engineered Sfiear Walls - - - -- -_ __ -"-~ -- - - " in eyed Roof Diaphragm agarage - - - Roof-Eng'd truss plan req'd at framing inspection Attic Venting Ceilings Posts, beams & headers Windows -egress. Windows -safety glazing Windows Ufactor - .60 max. t b i k NFRC i d n ~# ~ ' I '~ ~ ~ ~ e on er mus n ow st c w O ~ _ , }. windows at inspection time Air Seal Fresh Air Intake (Window) Door UValue - .40 max. Rafter/Truss Pos. Conn. Fire Blocking Weather Resistive Bamer INSULATION Slab (R-10 ) Floor (R-19) (R-30) ceilin q ~ - ~ ~ ~~ g Ba es~-"` ~ , 1 ~,//~ ~ L ~" ~.`~ 1 Vapor Barrier: paint DRY WALL NAII,ING Walls ~[ ~ Ceiling ~ ~t' . i~ j~ ~ ,~ Interior Braced Wall Panels ~ ' ~~ ~f~""` ~ Garage/House Occ. Separation ~ ~`~' , ~,~~ ~ ~ " Enclosed Space Under Stairs /~~,~ ' ~~,~'~~ Call 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 3 of 4 ,_, a RE INSPECTIONS TE FINAL LPG (Fire Dept.) Public Works Sign-Off Rouse Number Plumbing Mechanical Insulation Certificate V. B. Paint Certificate Smoke Detectors Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilize: with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4