Loading...
HomeMy WebLinkAboutBLD98-208 ' Waterman&Katz Building 181 Qulnq Strteq Suila 301 Part Townsend,WA98368 Phone: 3603793208 Fax 360379b923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: $I,D9g-20$ Issued: 9116199 Parcel Number: 955900078 Owner: Hamilton Heights LLC Contractor: Kozeliskv's Home Service #KOZELSM200K9 Job Address: 2666 Crest Avenue Zoning: PUD Type: VV=N Occupancy: R-31U-1 Total Occupant Load: 5/2 Nature of Work: Set Manufactured Home: construct earage & deck GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUHtED: Electrical -Contact Labor & Industries @ 360-417-2702 u>cnrTrn~r- Tlvcn~rTrnlvc APPROVF.D/DATE TEMP EROSION & SDM'T CONTROL See attached details and general condition #2 Silt Fence Drive Off Mat SLAB /~G ~~ Q 7 Setbacks l i 7 / Forms ~ /1 /I ~~ //~q n~ `~~l•~ V ~ Monolithic Slab/Fdn. (garage) , ! C~ Reinforcement Anchor Bolts Alt. BWP Holdown Hardware IJFER nA FLOOR FRAMING (prior to skirting) ~ /f Anchors -see attached details from set-up manual ~ Z l ~ ~ / ~ /-',/i ` ' Steel Support Piers -Load-stamped and installed - L ! G per manufacturer's installation manual; clearance of 18"min. from lowest paint ofl--beam and the ground or footingfor min. of 7.i% of area under home w/ 12 "min. elsewhere Area around home graded to provide runoff away from home Call 48 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 Perntit MBLD98-208 REQUIRED INSPECTIONS APPROVED/DATE PLUMBING: see attached set-up manual details Water Supply -Main shut-off valve (port or /~~`"U ball valve) installed in water supply piping prior to connection to home, min. '/> "diameter, same as supply pipe Pressure Reduction Valve if> 80 psi Hose Bibs (bckflw pro.req'd) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s.i. for IS minutes Pressure relief valve drain - to exterior of skirting, exhaust dowmvard between 6" and 24" above ground Drainage Piping -sloped min, j/,'%ft. MECHANICAL -see attached details from _ n set-up manual ,~ ~/Q f V ~~~ Ducts & Duct Insulation / ~ r ! lll// Dryer Exhaust -vented to outside. Extension into crawl space requires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length of ducting not to exceed 14' w/2-90° elbows FRAMING: Engineered truss plan to be on-site at time of t ~/r/l /(a/> t inspection d t l l Walls Alternate Braced Wall Panels Roof -garage Deck -floor joists, beams, posts VAPOR BARRIER 6 mil black poly ground cover not required where area under home is concrete slab floor with a minimum thickness of 3 %s inches DRY WALL NAILING aration Se anc G /H O ~ y 1/,/ /a /1 ~ln `~ `l` l `7 t~ p arage ccup y ouse Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 • Permit #BLD98-288 • RE UIRED INSPECTIONS APPROVED/DATE FINAL Public Works Sign-Off ~~2, //~/a ` _ Electrical (L & I) Sign-Off Z / l House Number Plumbing Mechanical Final -Building Deck No holes or gaps greater then '/: "allowed in skirting. Crawl space ventilation per installation manual @ 1/150 (16 req'd.); located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home; minimum 18 " x 24 "; covered with vinyl, p. t. wood or metal. GENERAL CONDITIONS • 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing,. holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shalt review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. Ca1148 hours before you dig Tor utility line locates 1-800-424-5555 Page 3 of 4 Permit kBLD98-208 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making change to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4