HomeMy WebLinkAboutBLD98-207Wnterman & Katx Building
181 Quinry Street, Suite 301
Port Tawreend, WA 98368
Phone: 3603793208 Fn: J60-3795923
CJ
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD98-00207 Issued: 3/9/99
Job Address: 934 Holcomb Zoning: RR=II
Parcel Number: 948319012
Type: VV=N Occupancy: UU=1
Total Occupant Load: 1 Nature of Work: Storage Shed (80 SF) Attached to House
Owner: Candace & Raymond Hulbert Contractor: Same as Owner
385-0566
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUII2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF(1TTTRFT) TNSPFC'TTnNS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2-Inspection req'mts
Silt Fence
Drive Off Mat
FOOTINGS
Setbacks
Footings
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
LIFER
FOUNDATION
Stem Wall-Wood w/PT bottom plate &
PT plywood on exterior
SLAB
Existin
FLOOR FRAMING
PT 2x6 @ I6" O.C.
Underfloor ventin
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
ATi (ITTTRFTI TNCPF.!'TTnNS APPROVED/DATE
FRAMING: ~.
Walls
Roof-2x6 @ 16" O.C.
Rafter Positive Connection
Weather Resistive Barrier
FINAL
Final-Storage shed
Smoke Detectors in existin house er UBC
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance {see attached details). Adjacent rights-of-way shall be kept
free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deSciencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3.
A minimum of twenty four hours notice is required Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. PO5T THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2