CITY OF PORT TOWNSEND
•
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD98-00201 Issued: 1127//99 Parcel Number: 948305009
Job Address: 1355 Jackman Street Zoning: R-11 Type: V_N Occupancy: R-31U-1
Total Occupant Load: 9/5 Nature of Work: New Single-family Dwelline w/ earase
Owner: James D. Carlson Contractor: Same as Owner
GENERAL CONDITIONS APPLY.- SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702 _
~~elctirtie.,a~~/~e~xc~ ~ lvrJ, ~~,~.~., ~ ~ /`~Q'-9~ a3~
J
DZ'l1TTTUL'71 TNCPF('TT(1NC
APPRnVED/DATE
aia~ vaaau..i ~. ...» ~. ~.--~-- ....
TEMP EROSION & SDM'T CONTROL
Silt Pence
Drive Off Mat
GROUNDWORK PLUMBING - / ~;,!!_` ~ !,?
~,
Pressure test
Pipe joints exposed
Pipe bedding
FOOTINGS ~- ! " " " ~'
V
~
'
Setbacks
/
:
Footings
Forms ~
Reinforcement
Interior g Continuous Footings
orch/Deck Bay Pier I
UFER _ _"
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
REOIJIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall ~
Forms
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Engineered holdowns @ garage walls
Waterproofing ~/ 21~ (~
V
SLAB
R-10 rigid insulation @ perimeter w/ thermal
break @ garage
FLOOR FRAMING (okay @ framing)
Girders (24F-V-8 glu-lam req'd. in garage
if continuous over posts)
joists
Engineered Floor Diaphragm Nailing @ Deck
l7EZ~. IC(A tUN(o J~/~~~~ /f~
`~~
Blocking for IBWP !
Positive Connection
Beam Pockets (see engineering)
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING: ~l ~'
Rough-In (D-V-T & Cln Out
s
Water Supply
Hose Bibs (bckflw pro. req'd
Pipe Insulation
Pressure Reduction Valve if> 80 psi
Water Heater
I
Seismic Restraint - 2 places I
R-10 under if electric
Pressure relief valve drain to exterior
.J
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
RE(7I1iRED INSPECTIONS APPROVED/DATE
i
MECHANICAL t~ /; ~~ ;? ~
Heat Pump -split system /
Ducts & Duct Insulation
Whole House Ventilation
HVAC Integrated Fresh Air
8" Smooth Duct J
Automatic (electric) Damper: req's letter
of certification for flow rates
Source Specific Fans
Environmental Air Exhaust ducting, insulation
' :,-~'~ ~~ `~? ;~~
from opening)
and terminus (located 3
FRAMING: ~ ~< ~ `~ ~ ;
Walls
-Engineered Shear Walls
Engineered Floor Diaphragm @ deck
Roof - Eng'd truss plan req'd on-site
at framing inspection
Attic Venting
Ceilings
Posts, beams & headers
Windows -egress
Windows -safety glazing
Windows Ufactor - .65 max.
NFRC window sticker must be on
windows at inspection time
Air Seal
Door UValue - .40 max.
Rafter/Truss Pos. Conn.
Fire Blocking I
Weather Resistive Barrier
INSULATION rr, E~e•/=~ L^.t~=c ~_ ~'" 44;x: f: f ~:~,° C~(~~"~t
`
Slab (R-10)
Floor (R-19 )
Wall(R-19)
Ceiling (R-30 )
Baffles
Va or Barrier: aint
DRY WALL NAILING
Walls
~~G~~~ ~
~~~; , '~
Ceiling
Engineered Shear Wall @ KitchenLBdrm.
Interior Braced Wall Panels
Garage/House Occ. Separation
Enclosed Space Under Stairs
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
~~
INSPECTIONS
FINAL
Public Works Sign-Off
House Number
Plumbing
Mechanical -Ventilation Certification for
Integrated System
Insulation Certificate
V. B. Paint Certificate
Smoke Detectors
Final - Buildine
7,
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shalt include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulchin
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. Alf elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
APPROVED/DATE
Ca11 48 hours before you dig for utility line locates
I-800-424-5555