Loading...
HomeMy WebLinkAboutBLD98-201Waterman & Katz Building 181 Quincy Street, Suite 301 Part Townsend, WA 98368 Phone: 360J793208 Fax 360-3795923 CITY OF PORT TOWNSEND • CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD98-00201 Issued: 1127//99 Parcel Number: 948305009 Job Address: 1355 Jackman Street Zoning: R-11 Type: V_N Occupancy: R-31U-1 Total Occupant Load: 9/5 Nature of Work: New Single-family Dwelline w/ earase Owner: James D. Carlson Contractor: Same as Owner GENERAL CONDITIONS APPLY.- SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 _ ~~elctirtie.,a~~/~e~xc~ ~ lvrJ, ~~,~.~., ~ ~ /`~Q'-9~ a3~ J DZ'l1TTTUL'71 TNCPF('TT(1NC APPRnVED/DATE aia~ vaaau..i ~. ...» ~. ~.--~-- .... TEMP EROSION & SDM'T CONTROL Silt Pence Drive Off Mat GROUNDWORK PLUMBING - / ~;,!!_` ~ !,? ~, Pressure test Pipe joints exposed Pipe bedding FOOTINGS ~- ! " " " ~' V ~ ' Setbacks / : Footings Forms ~ Reinforcement Interior g Continuous Footings orch/Deck Bay Pier I UFER _ _" Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 REOIJIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall ~ Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers Engineered holdowns @ garage walls Waterproofing ~/ 21~ (~ V SLAB R-10 rigid insulation @ perimeter w/ thermal break @ garage FLOOR FRAMING (okay @ framing) Girders (24F-V-8 glu-lam req'd. in garage if continuous over posts) joists Engineered Floor Diaphragm Nailing @ Deck l7EZ~. IC(A tUN(o J~/~~~~ /f~ `~~ Blocking for IBWP ! Positive Connection Beam Pockets (see engineering) Treated Wood to Concrete Anchor Bolts & Washers PLUMBING: ~l ~' Rough-In (D-V-T & Cln Out s Water Supply Hose Bibs (bckflw pro. req'd Pipe Insulation Pressure Reduction Valve if> 80 psi Water Heater I Seismic Restraint - 2 places I R-10 under if electric Pressure relief valve drain to exterior .J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 RE(7I1iRED INSPECTIONS APPROVED/DATE i MECHANICAL t~ /; ~~ ;? ~ Heat Pump -split system / Ducts & Duct Insulation Whole House Ventilation HVAC Integrated Fresh Air 8" Smooth Duct J Automatic (electric) Damper: req's letter of certification for flow rates Source Specific Fans Environmental Air Exhaust ducting, insulation ' :,-~'~ ~~ `~? ;~~ from opening) and terminus (located 3 FRAMING: ~ ~< ~ `~ ~ ; Walls -Engineered Shear Walls Engineered Floor Diaphragm @ deck Roof - Eng'd truss plan req'd on-site at framing inspection Attic Venting Ceilings Posts, beams & headers Windows -egress Windows -safety glazing Windows Ufactor - .65 max. NFRC window sticker must be on windows at inspection time Air Seal Door UValue - .40 max. Rafter/Truss Pos. Conn. Fire Blocking I Weather Resistive Barrier INSULATION rr, E~e•/=~ L^.t~=c ~_ ~'" 44;x: f: f ~:~,° C~(~~"~t ` Slab (R-10) Floor (R-19 ) Wall(R-19) Ceiling (R-30 ) Baffles Va or Barrier: aint DRY WALL NAILING Walls ~~G~~~ ~ ~~~; , '~ Ceiling Engineered Shear Wall @ KitchenLBdrm. Interior Braced Wall Panels Garage/House Occ. Separation Enclosed Space Under Stairs Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 ~~ INSPECTIONS FINAL Public Works Sign-Off House Number Plumbing Mechanical -Ventilation Certification for Integrated System Insulation Certificate V. B. Paint Certificate Smoke Detectors Final - Buildine 7, GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shalt include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulchin plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. Alf elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. APPROVED/DATE Ca11 48 hours before you dig for utility line locates I-800-424-5555 Page 4 of 4