HomeMy WebLinkAboutBLD98-178City of Port Townsend B40 Water Street
Port Townsend, WA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 126 QUINCY
Parcel No: 989700608
Project:
Jssued: 10!13!98
Lot: Block:
PERMIT # BLD9800178
OWNE
WATER STREET CORPORATION
635 WATER STREET
PORT TOWNSEND, WA 98368
-CONTRACTOR/OWNE
WATER STREET CORPORATION
635 WATER STREET
PORT TOWNSEND, WA 98368
-PROJECT DESCRIPTIO
Commercial: Installation of projecting sigri for Maxwell's Brewpub.
City Contact: JZ Construction TypelOCC Use/OCG Load
Type of work: ALT Construction Occupancy
Type of use: COM Type t: SN Group 1: Load t:
Census Category: 437 ~ Type 2: Group 2: Load 2:
Estimated Value: $175.00
Type 3: Group 3: Loatl 3:
Zoning: C-III
SI Code: Type 4: Group 4: load 4:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE PAGE 2
REQUIRED INSPECTIONS
Date Insp Date Insp
FRAMING Insp-See Special CondBions J,E~ II
FINAL I _ Insp-See Special Conditions~,~ I
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 7 of 2
City of Port Townsend Port o`w~5e d`WA 98368
Building and Community Development
BUILDER'S PERMlT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 Far Inspection
Site Address: 126 QUINCY Issued: 10/13/9E
Parcel No: 989700608 Lot: Block:
Pr°je°t: PERMIT # BLD9800178
SPECIAL CONDITIONS /RESTRICTIONS
1 . FRAMING: Applicant to attach projecting sign to brick wall with 1/2" screw anchors and bolts.
Anchor is designed for installation in brick; average tension load is 5900. Inspection may be
done at time of final
2. FINAL: Load test required by Building Department at final inspection.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if rio progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
i
Page 2 of 2