Loading...
HomeMy WebLinkAboutBLD98-178City of Port Townsend B40 Water Street Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 126 QUINCY Parcel No: 989700608 Project: Jssued: 10!13!98 Lot: Block: PERMIT # BLD9800178 OWNE WATER STREET CORPORATION 635 WATER STREET PORT TOWNSEND, WA 98368 -CONTRACTOR/OWNE WATER STREET CORPORATION 635 WATER STREET PORT TOWNSEND, WA 98368 -PROJECT DESCRIPTIO Commercial: Installation of projecting sigri for Maxwell's Brewpub. City Contact: JZ Construction TypelOCC Use/OCG Load Type of work: ALT Construction Occupancy Type of use: COM Type t: SN Group 1: Load t: Census Category: 437 ~ Type 2: Group 2: Load 2: Estimated Value: $175.00 Type 3: Group 3: Loatl 3: Zoning: C-III SI Code: Type 4: Group 4: load 4: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE PAGE 2 REQUIRED INSPECTIONS Date Insp Date Insp FRAMING Insp-See Special CondBions J,E~ II FINAL I _ Insp-See Special Conditions~,~ I Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 7 of 2 City of Port Townsend Port o`w~5e d`WA 98368 Building and Community Development BUILDER'S PERMlT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 Far Inspection Site Address: 126 QUINCY Issued: 10/13/9E Parcel No: 989700608 Lot: Block: Pr°je°t: PERMIT # BLD9800178 SPECIAL CONDITIONS /RESTRICTIONS 1 . FRAMING: Applicant to attach projecting sign to brick wall with 1/2" screw anchors and bolts. Anchor is designed for installation in brick; average tension load is 5900. Inspection may be done at time of final 2. FINAL: Load test required by Building Department at final inspection. GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if rio progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. i Page 2 of 2