HomeMy WebLinkAboutBLD98-168City of Port Townsend 54o Water Street
Port Townsend, WA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1004 WATER ST Issued: 9/18!98
Parcel No: 9897039D1 of Block:
Pro;ect: PE~IVI~T # BLD98-00168
-CONTRACTOR/OWNE
PORT TOWNSEND HOTEL INVEST
31919 FIRST AVE S, #206
FEDERAL WAY, WA 98003
OWNE
PORT TOWNSEND HOTEL INVEST
31919 FIRST AVE S, #206
FEDERAL WAY, WA 98003
-PROJECT DESCRIPTIO
Repair/RemodeVTenant Improvement -Frame in existing skylight opening (8 x 20) and re-roof (hot mop) building.
City Contact: JLZ Construction TypelOcc UselOcc Load
Type of work: ADD Construction -Occupancy
Type of use: COM Type 1: SN Group t: R-t Load 1:
Census Category: 555 Type 2: Group 2: Load 2:
Estimated Value: $18,700.00
Type 3:
Group 3: Load 3:
Zoning: C-III
Type 4: Group 4: Load 4:
51 Code:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE PAGE 2
REQUIRED INSPECTIONS
Date Insp Date Insp
FRAMING -Walls
-Ceiling -Roof i ~. f /
-Air Seal INSULATION 2 2 3"~" ~''
-Ceiling (R-38) DRYWALL NAILING
Insp-See Special Conditions ." -Ceiling
-Fire Rated Ceilings Reroof
FINAL Final-House Number
Final -Building ~ J
Call 48 hours before you dig for utility line locates
• 1-800-424-5555
Page 1 0! 2
City of Port Townsend Port ownsetndeWA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1004 WATER ST Issued: 9/18198.
Parcel No: 989703901 t Block:
Proved: PERM IT # BLD98-00168
SPECIAL CONDITIONS !RESTRICTIONS
1 . DRYWALVNAILING: 1 1/4" GWB required for Type V-1 hour construction. Although building
is vested with 3 stories @ V-N construction, new construction requires compliance with V-1 hr.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Page 2 of 2