Loading...
HomeMy WebLinkAboutBLD98-168City of Port Townsend 54o Water Street Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1004 WATER ST Issued: 9/18!98 Parcel No: 9897039D1 of Block: Pro;ect: PE~IVI~T # BLD98-00168 -CONTRACTOR/OWNE PORT TOWNSEND HOTEL INVEST 31919 FIRST AVE S, #206 FEDERAL WAY, WA 98003 OWNE PORT TOWNSEND HOTEL INVEST 31919 FIRST AVE S, #206 FEDERAL WAY, WA 98003 -PROJECT DESCRIPTIO Repair/RemodeVTenant Improvement -Frame in existing skylight opening (8 x 20) and re-roof (hot mop) building. City Contact: JLZ Construction TypelOcc UselOcc Load Type of work: ADD Construction -Occupancy Type of use: COM Type 1: SN Group t: R-t Load 1: Census Category: 555 Type 2: Group 2: Load 2: Estimated Value: $18,700.00 Type 3: Group 3: Load 3: Zoning: C-III Type 4: Group 4: Load 4: 51 Code: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE PAGE 2 REQUIRED INSPECTIONS Date Insp Date Insp FRAMING -Walls -Ceiling -Roof i ~. f / -Air Seal INSULATION 2 2 3"~" ~'' -Ceiling (R-38) DRYWALL NAILING Insp-See Special Conditions ." -Ceiling -Fire Rated Ceilings Reroof FINAL Final-House Number Final -Building ~ J Call 48 hours before you dig for utility line locates • 1-800-424-5555 Page 1 0! 2 City of Port Townsend Port ownsetndeWA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1004 WATER ST Issued: 9/18198. Parcel No: 989703901 t Block: Proved: PERM IT # BLD98-00168 SPECIAL CONDITIONS !RESTRICTIONS 1 . DRYWALVNAILING: 1 1/4" GWB required for Type V-1 hour construction. Although building is vested with 3 stories @ V-N construction, new construction requires compliance with V-1 hr. GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Page 2 of 2