Loading...
HomeMy WebLinkAboutBLD98-166City of Port Townsend Port ownsendtWA 98768 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1395 WILLOW ST Parcel No: 984903104 Project: JOHNSON THOM H LINDA O JOHNSON 1395 WILLOW Issued: 9/18198 Lot: Block: PERMIT # BLD98-00166 WNE JOHNSON THOM H LINDA O JOHNSON 1395 WILLOW -PROJECT DESCRIPTIO Single-family Residential: Repair to Foundation ` City Contact: JZ Construction TypelOcc Use/Occ Load Type of work: REP Construction Occupancy Type of use: SFR Type 1: 5N Group 1: R-3 Load 1: Census Category: 575 Type 2: Group 2: Load 2: Estimated Value: $3,000.00 Type 3: Group 3: Load 3: Zoning: R-II Type 4: Group 4: Load 4: SI Code: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE PAGE 2 REQUIRED INSPECTIONS Date Insp Date Insp FOOTINGS Zg Insp-See Special Conditions #~ -Footings -Forms -Reinforcement -Interior Footing i FOUNDATION Insp-See Special Conditions #fz, % -Stem Wall -Forms ;' -Reinforcement SLAB -Reinforcement -Interior Footing ~a/ g FINAL Insp-See Special Conditions ~3 ` ` Final-House Number Final-Smoke Det. Througout Final -Building • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 City of Port Townsend 54°Water Street Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1395 WILLOW ST Issued: 9!18/98 Parcel No: 984903104 Lot: Block: Project: PERMIT # BLD98-00166 SPECIAL CONDITIONS /RESTRICTIONS 1 . FOOTINGS: See detail C, sheet 3 of plans. 2. FOUNDATION: See detail C, sheet 3 of plans. 3. FINAL: Smoke detectors shall be updated throughout the house per the 1997 Uniform Building Code (UBC): one in each bedroom, in hallway/area outside each sleeping room; minimum one on each floor. Battery powered OK. Inspection required. GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required priorto occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ~~ U Page 2 of 2