HomeMy WebLinkAboutBLD98-165City of Port Townsend 540 Water Street
Port Townsend, WA 98168
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1200 SIMS WAY
Parcel No: 948333001
Project:
~ONTRACTOR/OWNE
VICTORIAN PROPERTIES INC
718 WASHINGTON
PORT TOWNSEND, WA 983685718
Issued: 9!23198
Lot: Block:
I~ERMIT # BLD98-00165
WNE
VICTORIAN PROPERTIES INC
718 WASHINGTON
PORT TOWNSEND, WA 983685718
Repair/Remodel for commercial business office rentals, SuiteB, Building B;replacement of damaged windows,interior
walls,reshingle perimeter roof
City Contact: JZ Construction TypelOcc UselOcc Load
Type of work: ALT Construction Occupancy
Type of use: COM Type 1: Group t: Load 1:
Census Category: 437 Type 2: Group 2: Load 2:
Estimated Value: $12,500.00
Type 3: Group 3: Load 3:
Zoning: C-IIM
SI Code: Type 4; Group 4: Load 4:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE PAGE 2
REQUIRED INSPECTIONS
Date Ins Date Insp
FRAMING ~~~ ~ (? -Window U Value
-Air Seal -Rafter/Truss Pos. Conn.
{NSULATION ~ -Ceiling (R-30)
-Baffles -Fill Exposed Cavities Z
VAPOR BARRIER DRYWALL NAILING
-Walls -Ceiling
Final-House Number Final-Building
Final-Fire Dept. Sign-Off -Smoking/Non Area Signage
Final -Electrical (L&I) Final -Building ~-rp;~~''" /
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
City of Port Townsend 540 Water Street
Port Townsend, WA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1200 SIMS WAY Issued: 9123198
Parcel No: 948333001 Lot: Block:
Project: BLD98-00165
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. Al! building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit alive.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
ti
Page 2 of 2