HomeMy WebLinkAboutBLD98-152City of Port Townsend b40 Water Street
Port Townsend, WA 98386
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD 8r APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION 71ME
Call 385-2294 For Inspection
3a3
Site Address: >~ WILLOW Issued: 9/1198
Parcel No: 931402801
Project:
Lot: Block:
PERMIT # BLD98-00152
OWNE
MIKE OCONNOR
10165 NW CAROLINA LANE
BREMERTON, WA 98312
-CONTRACTOR/OWNE
MIKE OCONNOR
10165 NW CAROLINA LANE
BREMERTON, WA 98312
Residential; New foundation/retaining walls.
City Contact: JZ Construction TypelOcc UselOCC Load
Type of work: NEW Construction Occupancy
Type of use: SFR Type 1: SN Group 1: R-3 Load 1:
Census Category: 329 Type 2: Group 2: Load 2:
Estimated Value: $8,000.(10
Type 3: Group 3: Load 3:
Zoning: R-II
SI Code: Type 4: Group 4: Load 4:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector Inspection Date Inspector
InsirSee Special Conditions ~/ -Reinforcement
TEMP EROSION & SDMT CON -Waterproofing
Insp-See Special Conditions ',
-Silt Fence
-Drive Off Mat
FOOTINGS
-Setbacks
-Footings
-Forms
-Reinforcement
FOUNDATION
-Stem Wall
-Forms
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
City of Port Townsend Port ownsend `WA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME •
Call 385-2294 For Inspection
Site Address: 325 WILLOW Issued: 9n/9s
Parcel No; 931402801 Lot: Block:
Protect: PERMIT # BLD98-00152
SPECIAL CONDITIONS /RESTRICTIONS
1 . Future permit shall be compatible with this foundation design.
2. TESC: Temporary erosion control measures shall be installed and inspected prior to any
building activity. Rights-of-way shall be kept clean. Applicant is responsible for protection of
adjacent properties.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 or 2