HomeMy WebLinkAboutBLD98-133Waterman ~ Katz Building
I81 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)3'/9-6923
~rrl~v n>F PnRT TnWNSEND
Vl l i v+ ~ v~-~ - - ~ ~ -- - -
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD9tS-0O133 Issued: 6114/99 Parcel Number: 948303106
Job Address: 442 West Sims Wav Zoning : CC=II Type: III-N Occupancy: M/W-1
Total Occupant Load 1468 Nature of Work: Add 13 003 SF & Remodel Existin
Use of Building: Retail
Owner: Safewa Inc.
Contractor: S D Decon Corp of Washineton
Gate Parker 42/454/5038
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Plumbing or Mechanical Permit (Refrigeration piping)
Mechanical Permit (LPG tanks & exterior LPG piping)
Building Permit (Sprinkler system for building & Type I Hood)
Electrical Permit (See WA State Labor & Industries)
SPECIAL INSPECTIONS REQUIRED: (See Approved Plans: Sheet S0.1 for list
Special Inspection categories
ICBO certified inspector to either be listed in current edition of WABO "Agency and Inspector
Register" or present ICBO credentials to Building Department PRIOR to performing
inspections.
• Special Inspection Reports to be copied to Building Department in a timely manner. Permit
Holder or Permit Holder's Agent shall review and oversee correction of any and all
deficiencies noted by required special inspections.
HOURS OF CONSTRUCTION
7:00 AM - 6:00 PM, Monday -Friday
Except National Holidays
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 6
Pamitp BLD98-133 r
1
RF.OT7TRF.1l TNSPF,C:TTONS APPROVED/DATE
DEMOLITION
All construction debris to be deposited in
approved areas in accordance with local, state,
and federal laws.
FOUNDATION
Auger-cast Concrete Piles \ ~ L~ _
> ~
~~ ~
' ~ ~ ~'t
--~
Setbacks/location , 0
/
Reinforcement
Grade Beams
Reinforcement J "~ ~
~-olo ~
~
- ~ ~ ~ ~
J
.
y
(jQAO~ ~ m I'+~+"'• G L Z • J ~- ~ g~ l7%~I
Structural Slab
Reinforcement ~fp ~ r C.~'e ~®~ G_..,..~Y.7- d ~ ~ 2 • ~' ~
Anchor Bolts
Holddowns _ n ,w d G
g 6 L Z •S' D ~~7~% //~V
CMU WALLS ~ ~ ~ L~~r !~I L- +~~' CAL- (~ ~'1~i4 B?N/rl~Iv~~,S'
~
i
,
'
~ ,
L,~ 7- ~~ ~~
g 3! ~.
~ ~/,
Reinforcement
' 3` fr GL ~ ~Z•s 9/~fg9 ~
4
Lifts
Veneer Ties
PLUMBING (Barrier Free Standards Bt ~ l~ _ ~~ Z S , A _, p" y g+(~/Qd
GL
1
6
YV
Required) ~2o0t/G6sCAaiL A'Ai.~S
S
S .
Z/l5/00
D-W-V Rough in
M
0
G
`
D
~"
~ ~1
~pC~ ~~. ~~/ ~G ~.c5 _6 %~9~
Island ventin
~'
~
'
~
'
'
g l~OQ
~ ~
` ~ll Yo~.C~/oY~ 17 ~~ ~j2.3 ~~~
'~
7
Floor drains-tra seal
a er, upply ~ ~e,~ AY..~R ~ M 1 L
Hose Bt s ackflow protection require
Grease raps
i
l
d
t
D
C
~
ra~
on
ensa
e
/ps
OtherPipi~g l~i~°sBm.QCtJkst bt®c 3~q~o
Hot water heater C !
(~ ~,~. ~~ (~ ~ •a3 ' 4
b,V ~.~ ~l'A~~
Seismic restraint ~~A~G~GL p~V®~x"r!'~~o~,i, ~(.I~LGS l0 / Q
~ZSI ~
~ ~ f?,lld0
PTR Valve to extenor ~~-c~ b !
~
Z l~lod ~,~„
a~~ C~aoc~es /1131Qy C~
7
r3~~
~ ~.
Ga~ID~~ D,eA~Ng ~pZ~R- 5~ "/~ / ~ mGZI ~~1.~f9 ~C
~,;,. o,~ [2 (!9 ~,vjlza}satr W+~SfiC CoL G / Z%/~ DO ~ •
~~~ ld ~ ~ C91I48 hb4ts before you dig for ut~hty line locates ~/J
~ I~CV (~ ~~ U ,~ i ' Gi I Pa e 2 of 655 12 Z N~ !2 ~~"„ 3`S ~b ~3~0~ ~-C.
~.~~ /~ g ,~ dw~~
lZ~9lgq~ ~~Ai~®GLOi ,~~26COo ~"A~Z ~ 3/r3`oo~
~xq~ ~~~
Pumi[N BLD9&133
~~
REQUIRED INSPECTIONS APPROVED/DATE
MECHANICAL
U~~y ~ ~e~Tri.~~/ D~~-rs ! l7~QP
HVAC Units ll
Factory applied nameplate
Manu's operating instructions attached r
UJ/~ ~ ~l'd/aiC~Gt~ ~ ~~7~/,Z Z/.~
l
>
Unit ID'ed for area served ( ( i
0
Access and work space for maintenance
Disconnect •
!-~l/~`~ rL.o~L ~'~~-'t `~~~~~' ~-~:
Condensate drain
NREC Temperature Zones
Thermostat Controls
Deadband control
Night Setback w/7 different day types -
Microprocessor controls w/heat indicates
Dampers
Duct Insulation
FRAMING
i
~~gw~•ra~ ~ DAL t ~o G L '-F- U~ ~T "
or
Street & Utility Development Permit pr
To Framing Inspection
All engineered elements require inspection , 7N • ~ WD ~ ~,~~
C/~~~ ~~~~~~~ ~
-prior to cover SIYStf~LMkNot~
~(• ~lu~s"ft~
Walls
Front wall -fire treated wood
._
~iF'6irn... t"nCiv ~~GcN"~s'L ~.F.~T{, ~~ ~~C7d('~
Steel moment resisting frames
Drag strut connection @ fdn and roof lines
(adding hardware in existing building) _
Roof !_~r~c~=' ~,~~,~~;~ `r~,'<~ ,'711~,.~4~
l ~ ~
„~
Windows ~
Safety glazing ~ r v; ,~,,.„ ~' ~~;wr ~~,;~ ~~ <'-"/~ ,/ f~ ~ ~J/'
.55 U-factor
Doors ~(-1 A.Ci77liG~ 2// ~~01~ ~j
/
1.1 U-factor ~•~oo~-- 3~IO~Op ~
Fire blocking
Attic draft stop
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 6
DD~%~
r7 c'l
~tLS
~~~~q9
Y_-
Pmnit # BLD98-I33
REQUIRED INSPECTIONS. APPROVED/DATE
FRAMING -continued
Soffit draft stop
Air Seal
Weather resistive barrier
I
INSULATION ~ D~ ~ ~ ~ IQ _ ~ ~ //l~/q Q
(!
~
Slab (No insulation required) ~
~vr~~D~+~ ~~~ ~1~i~00
Walls R-13
Roof R-21 (built up deck) -
Fill exposed cavities in existing construction
VAPOR BARRIER
y
DRYWALL NAILING ~, ~ ~~L ~ ... ~'L ~ - Q~l 1~~9
Walls ~ ~ ,~ A~rvOCR- t'~1~~~~
Ceiling
SUSPENDED CEILING ~ 19 q ~
~R~~mr~~--rte ON~~ tZ~ 1
Frame and supports
stallation)
ili
th
i
I
t
i
t ~
,,:L/J _
~ Z't' 3'-! 9 ~~ ~ „/~°~, ~"~
_/ ~"""~
or
ng
e
n
(
nspec
pr
o ce
Q
rp~~ ~((prQ(~
l
LIGHTING ,~rf1,~, ~ ~, (
-
;Y~'""
See approved plans and NREC Lighting
Summary
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 6
Pemti[M B
y REQUIRED INSPECTIONS APPROVED/DATE
PARHING
For inspection call Jeff Randall
379-3208 x. 1124 ~ -,
",, ~, c~
f ., --~.~ ~. ~
'! ,
LANDSCAPING
1
For Inspection call Jeff Randall .
h ~~ i
y jj ! ,
F r ;.~ ~
379-3208 x. 1124 $
~ %°" ~~'`~'"~
~
4 _,~
FINAL
Plumbing Final ;_, ^ '`
Barrier Free required '
Mechanical Final --
WSVIAQ
Certification letter req'd from installer
Stating compliance w/ "fresh air"regmnt's
Fire Department Final
Public Works Final Signoff
Electrical Final (L& I)
Jefferson County Health Dept. Final
Signoff for req'd mitigation per SEPA 98-58-'" ~~ ` ~ -
Call Jeff Randall - 379-3208 x. 1124 ^'
Final Building
Revalue construction for additional permit fee
calculation.
Ca1148 hours before you dig for utility line locates
1-800-424-5555.
Page 5 of 6
Pmti[# BLD98-133 y
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shutdown while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall 6e kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty four hours notice is required Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 6 of 6
Walertnav & Katz Bwlding
187 Quincy S[reet, Sui[e 301
Port rownaend, WA 98368
P6ove: (360)379-3208 Fes (360).379-69:3
rrTY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MiIST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD9H-133R'1 Issued: 6/14/99 Parcel Number: 948303106
Job Address: 442 West Sims Wav Zoning : CC=II Type: III-N Occupancy: 1VI/W-1
Total Occupant Load 1468 Nature of Work: Addendums 1-4 (misc details and clarification); K-1
- K 4 (New numbering system for deli area• dimensions equipment electrical & plumbing)• and 2 sets of
refrigeration information
Use of Building: Retail
Owner: Safeway, Inc. Contractor: S D Decon Corp of Washington
Gale Parker 425/454/038
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
. Plumbing or Mechanical Permit (Refrigeration piping)
Mechanical Permit (LPG tanks & exterior LPG piping)
Building Permit (Sprinkler system for building & Type I Hood)
Electrical Permit (See WA State Labor & Industries)
SPECIAL INSPECTIONS REOUIRED: (See Approved Plans: Sheet S0.1 for list
Special Inspection categories)
ICBO certified inspector to either be listed in current edition of WABO "Agency and Inspector
Register" or present ICBO credentials to Building Department PRIOR to performing
inspections.
Special Inspection Reports to be copied to Building Department in a timely manner. Permit
Holder or Permit Holder's Agent shall review and oversee correction of any and all
deficiencies noted by required special inspections.
HOURS OF CONSTRUCTION
7:00 AM - 6:00 PM, Monday -Friday
Except National Holidays
•
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
PermitB 6LD9$-133R-I
INSPECTIONS
See main permit BLD99-00133 for required
inspections
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shallbe kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and .alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections. •
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty four hours notice is reouired Public Works approval must be received arior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Waterman & Kazz Building
181 Quinry Stree4 Suite 301
Port Toml9end, WA 98368
Plane: (360) 379-3208 Fax: (360) 379-6923
i
r.ITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD98-133R-3 Issued:9/27/99 Parcel Number: 948303106
Job Address: 442 West Sims Way Zoning : CC=II Type: III-N Occupancy: MIS-1
Nature of Work: Revised plan sheets for revisions 1- 9. 1-Addendum #1. 2 -Addendum #2: 3 - Plumbing
Revisions• 4 -Addendum #4. 5 -Public Works• 6 - V.E. Revision• 7 -Pile Revision w/attached Revised
Foundation Sketches• 8 -Plumbing Revisian• 9 -Owner Revision• 10 -Owner Revision
Owner: Safeway. Inc. Contractor: S.D. Deacon Corn of Washington
Mark Dry 379-1190 & 206/571-2723
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Plumbing or Mechanical Permit (Refrigeration piping)
Mechanical Permit (LPG tanks & exterior LPG piping)
Building Permif (Sprinkler system for building & Type I Hood)
Electrical Permit (See WA State Labor & Industries)
HOURS OF CONSTRUCTION
7:00 AM - 6:00 PM, Monday -Friday
Except National Holidays
INSPECTIONS
See main permit BLD99-00133 for required
inspections
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pmmit M BLD98-133R-3
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of sih fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspeMion is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspeMion call 385-2294, press 3. A
minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building.
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
- 1-800-424-5555
Page 2 of 2
Watmnan & Kazz Bwlding
181 Quinry Shee4 Swle 301
Pon'. Towveod, WA 98368
Phone: (360)379-3208 Fax: (360)379-6923
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED. AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD98-133R-2 Issued:?/29!1999 Parcel Number: 948303106
Job Address: 442 West Sims Wavy Zoning : CC=II Type: III-N Occupancy: M/W-1
Total Occupant Load 1468 Nature of Work: Revise underground plumbing for addition.
Use of Building: Retail
Owner: Safeway. Inc. Contractor: S.D. Deacon Coro of Washington
Gale Parker 425/454/5038
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Plumbing or Mechanical Permit (Refrigeration piping)
Mechanical Permit (LPG tanks & exterior LPG piping)
Building Permit (Sprinkler system for building & Type I Hood)
Electrical Permit (See WA State Labor & Industries)
HOURS OF CONSTRUCTION
7:00 AM - 6:00 PM, Monday -Friday
Except National Holidays
•
INSPECTIONS
See main permit BLD99-00133 for required
inspections
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page I of 2
PetmitM BLO98-133R-2
GENERAL CONDITIONS _
•
1. Contractors working on this project are required to have a Labar & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
i
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior'to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2