Loading...
HomeMy WebLinkAboutBLD98-127City of Port Townsend 540 Water SVeet Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD Sr APPROVED PLANS S ITE AT INSPECTION TIME all 385-2294 For Inspection Site Address: 734 WATER ST ed: 7116198 Parcel No: 989704206 ot: Project: ~~~ BLD98-00127 -CONTRACTOR/OWNE PIONEER MASONRY RESTORATION CO PO BOX 70110 SEATTLE, WA 98107 -PROJECT DESCRIPTIO Commerical Maintainance: repair and sealing of masonry walls. City Contact: RS Construction TypelOcc UselOcc Load Type of work: REP Construction Occupancy Type of use: COM Type 1: 5N Group 1: load 1: Census Category: Type 2: Group 2: Load 2: Estimated Value: $45,000.00 Type 3: Group 3: Load 3: Zoning: C-III Type 4: Group 4: Load 4: SI Code: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS ____ -- - P Ins ection Date .Inspector Insp-See Special Conditions ~_ ,TEMP EROSION & SDM'T CON ~ ~ ,,Insp-See Specia(Conditions i SPECIAL CONDITIONS /RESTRICTIONS 1. PEDESTRIAN PROTECTION: Ped Pro required where applicable per UBC Section 3303. Call for inspection when Ped Pro is in place and each time it is moved and reset. Safe pedestrian corridors must be maintained. 2. TESC: Owner/contractor shall install and maintain erosion and sediment control measures as needed during construction. SEATTLE FIRST NAT'L BANK PROPERTIES OPERATIONS P O BOX 34033 HOB 16 Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 City of Port Townsend 640 Water SUeet Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 734 WATER ST Issued: 7/1819$ Parcel No: 989704206 ot: Project: ~(~~ BLD98-00127 GENERAL CONDITIONS 1. A separate electrical permit is required for any elecVical work. 2. Reinspections are required after any corcections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • ~J Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2