HomeMy WebLinkAboutBLD98-100City of Port Townsend 540 Water Street
Port Townsend, WA 98368
Building and Community Development
• BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 734 WATER ST
Parcel No: 989704206
Project:
-CONTRACTOR/O W N E
HAYWARD BAKER
2701 CALIFORNIA AVE SW
SEATTLE, WA
Issued: 6H 7198
SEATTLE FIRST NAT'L BANK
PROPERTIES OPERATIONS
P O BOX 34033 HOB 16
-PROJECT DESCRIPTIO
Compaction grouting to lift and stabilize floor slabs for vault and teller window area.
City Contact: RS Construction Type/Occ Use/Occ Load
Type of work: ALT Construction Occupancy
Type of use: COM Type 1: 5N Group 1: B Load 1:
Census Category: Type 2: Group 2: Load 2:
Estimated Value: $50,000.00
Type 3:
Group 3: Load 3:
Zoning: C-III
Type 4: Group 4: Load 4:
SI Coda:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector'
Insp-See Special Conditions
Insp-See Special Conditions
F I NAL
__.._-_
SPECIAL CONDITIONS I RESTRICTIONS
1 . PEDESTRIAN PROTECTION: Pedestrian protection is required. Call for inspection when
same is in place and prior to start of work.
2. COMPACTION GROUTING: Call for inspection during grouting operations.
01
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
City of Port Townsend 540 Water Street
Port Townsend, WA 96368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 734 WATER ST
Parcel No: 989704206
Project:
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
Issued: 6!17198
BI
>~17-~ BLD98-00100
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2