Loading...
HomeMy WebLinkAboutBLD98-100City of Port Townsend 540 Water Street Port Townsend, WA 98368 Building and Community Development • BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 734 WATER ST Parcel No: 989704206 Project: -CONTRACTOR/O W N E HAYWARD BAKER 2701 CALIFORNIA AVE SW SEATTLE, WA Issued: 6H 7198 SEATTLE FIRST NAT'L BANK PROPERTIES OPERATIONS P O BOX 34033 HOB 16 -PROJECT DESCRIPTIO Compaction grouting to lift and stabilize floor slabs for vault and teller window area. City Contact: RS Construction Type/Occ Use/Occ Load Type of work: ALT Construction Occupancy Type of use: COM Type 1: 5N Group 1: B Load 1: Census Category: Type 2: Group 2: Load 2: Estimated Value: $50,000.00 Type 3: Group 3: Load 3: Zoning: C-III Type 4: Group 4: Load 4: SI Coda: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection Date Inspector' Insp-See Special Conditions Insp-See Special Conditions F I NAL __.._-_ SPECIAL CONDITIONS I RESTRICTIONS 1 . PEDESTRIAN PROTECTION: Pedestrian protection is required. Call for inspection when same is in place and prior to start of work. 2. COMPACTION GROUTING: Call for inspection during grouting operations. 01 Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 City of Port Townsend 540 Water Street Port Townsend, WA 96368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 734 WATER ST Parcel No: 989704206 Project: GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. Issued: 6!17198 BI >~17-~ BLD98-00100 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2