HomeMy WebLinkAboutBLD98-069City of Port Townsend ~°""'`"~'°°t
port rownaand, wn sa5se
Building and Community Development
,~ BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1028 TYLER ST
Parcel No: 988802404
Project:
Issued: 5128/98
PE~tMIT # BI°ck:
BLD98-00069
MARSHALL RANEY
1028 TYLER ST
PORT TOWNSEND, WA 983686544
-PROJECT DESC
Remodel Kitchen
WNER-
MARSHALL RANEY
1028 TYLER ST
PORT TOWNSEND, WA 983686544
City Contact: JLZ Construction TypefOcc UselOec Load
Type of work ALT Construction GccuPancY
Type or use: SFR Type 1: Group 1: Load 1:
Census Category: 434 Type 2: Group 2: Load 2:
Estimated Value: 56,196.5°
Type 3: Group 3: Load 3:
Zoning: R-11
.
SI Code: Type 4: Group 4: Load 4:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector
PLUMBING ~ ~ r~ '"
-Rough-In (D-V-T 8 Cln Outs)
/-
-Water Supply ~
-Gas Supply
-Pressure Reduction Valve `"
MECHANICAL
Insp-See Special Conditions
-Environmental Air Exhaust ~~ _3 y
FINAL
Final-House Number
Final-Smoke Det. Througout Z /a 0~
iFinal-LPG (Fire Dept.)
G~ ~ ~f' rL ~' ~'r~~~ f~k~'~4 Cv~iG~~i
Call 48 hours before you dig for utility line locates
1-800-424555
Page t o/ 2
City of Port Townsend 6'°W~°ra~'°t
Port Townsend, WA 88366
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1028 TYLER ST Issued: S/2a/9e
Parce{ No: 988802404 Lot: Block:
Project: BLD98-00069
SPECIAL GONDITIONS l RESTRICTIONS
1 . Smoke detectors (SD) are required throughout the house per the 1994 UBC: SD's in each
sleeping room and in hallwaysJareas giving access to the sleeping area with a minimum of one
on each floor. Inspection required.
2. Environmental air exhaust ducts must terminate outside the building 3' from properly lines and
3' from openings into the building to minimize recirculation.
GENERAL CONDITIONS
1. A separate electrical pernR is required for any electrical work.
2. Reinspections are required after any corections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building pernits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
• keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2