HomeMy WebLinkAboutBLD98-061CITY OF PORT TOWNSEND
PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STIR
CALL 385-2626 FOR INSPECTION
Permit No: BLD98-00061 Issued: 5/08/98 Receipt No. Date
Job Address: 3300 San Juan Avenue Zoning: R-111
Nature of Work: Install Fire Sprinkler System Use of Building: Government
Assisted Residential Facility
Owner: San Juan Commons (Hearthstone Group) Contractor: Fox Fire Prevention Inc.
**(SEE ATTACHED FIRE DEPT. MEMO DATED 4/17!98)**
REQUIRED INSPECTIONS
Site Inspections (Locates)
^. Fire Department Connection
^ Vault
^ Post Indicator Valve
/nspector
Construction Inspections
Date
^ Piping, Bracing, Valve Installation
^ Check valves
^ Drain and drip device between FDC and Check Valve
^ Thrust Block Installations
^ Approval for Cover (except joints-prior to flow test)
/nspector
Date
^ Public Works Department Inspection Approval (double check detector assembly
prior to installation)
!nspector
Date
d
O
Hydrostatic Test (2 hour, 200 psi min.)
Pressurized Air Test (24-hour dry test to 40 psi)
Flush (with sieve)
Flow Test(s) (Water pressure gauge reading:--Drop:_)
Fire Alarm System Interne Test, Local Waterflow Alarm Req'd. (Tamper and
Flow) _ Seconds
Sprinkler head installation: N & S stairwell sprinkler coverage per UBC
Standard 9-3 with heads installed at ceiling of each landing and elevator shaft
requires sprinkler heads at bottom (sidewall) and top with appropriate valves
Labeling (Control Valves, Drains, etc.)
Sprinkler Box Contents (wrench, heads, etc.)
Water Motor Alarm
Fire Department Connection
Adequate heat provision for piping protection
lnspectoi Date
d
Contractor's Material & Test Certificate filed:
As-built Plans (24 x 36" maximum format) provided on-site in a formal plans
box adjacent to sprinkler riser:
As-built Plans (24 x 36" maximum format) filed:
Fire Department Final Inspection Approval
Date