Loading...
HomeMy WebLinkAboutBLD98-025? City of Port Townsend ~wovnsend`wasasca Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1110 20TH ST Parcel No: 948308903 Project: -CONTRACTOR/OWNE ItCCHA 9265 BAYSHORE DRIVE SiLVERDALE, WA 98383 Issued: 5/21198 t Block: PERMIT # BLD98-00025 OWNE PATRICIA FINNIGAN 1110 - 20TH STREET PORT TOWNSEND, WA 98368 -PROJECT DESCRIPTIO Residential: Construct 1232 sq. ft. home with 320 sq. ft. garage, entry parch and patio. City Contact: JZ Construction TypUOcc UselOcc Load Type ofwork: NEW Construction Occupancy Type of use: 8FR Type 1: SN Group 1: R-3 Load 1: 4 Census Category: 101 Type 2: Group 2: U-1 Load 2: 1 Estimated Value: $100,209.28 Type 3: Group 3: Load 3: Zoning: R-II . SI Code: Type 4: Group 4: Load 4: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS Inspection Date Inspector Inspection Date Inspector Insp-See Special Conditions ~ -Stem Wall TEMP EROSION & SDM'T CON -Forms Insp-See Special Conditions a. -Reinforcement FOOTINGS -Anchor Bolts i ~-Setbacks -Vents ~~ '~`~ ~ Y (,~ -Footings -Crawl Access 1~T~~,~L ~ -Forms -Beam Pockets -Reinforcement -Alt BWP Haldown Hdwr ~- ~, ~ ~~ -Interior Footing FLOOR FRAMING -Porch Bay Piers Insp-See Special Conditions ~ , -LIFER ~ C~ -Girders ~ ~.1 FOUNDATION ,~ /'~ -Joists a-See Special Conditions ~ 3 -Blocking Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 City ®~ i. Oi 7L ToYY~J~61~ 540 WaownsendWA 88368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME . Call 385-2294 For Inspection Site Address: 1110 20TH ST Issued: 5/21/98 Parcel No: 948308903 Block: Pro;ect: PE~M1T # gLD98-00025 Inspection Date Inspector Inspection Date Inspect -Shield Under Posts ~ rf ~ ~ -Windows: Egress -Positive Connection ~' -Window U Value -Girder to Concrete -Window Safety Glazing -Beam Pockets N -Air Seal -Treated Wood to Concr e ~ 7 !~8 nob ~ -Fresh Air Intake (Window) -Anchor Bofts & Washers -RafterlTruss Pos. Conn. -FDN Vents -Fire Blocking PLUMBING IZ -Weather Resistive Barrier Insp-See Special Conditions INSULATION -Rough-In (D-V-T & Cln Outs) -Floor (R-30) i -Water Supply -Under WH (R-10) -Hose Bibs (bckflw pro. regd) -Wall (R-79) 7i (ld -Pipe Insulation -Ceiling (R-38) -Water Heater -Baffles -Seismic Restraint VAPOR BARRIER MECHANICAL -Paint Insp-See Special Conditions ~(P -Crawl Space - 6 Mil Poly -Duct Insulation DRYWALL NAILING Z -Whole House Fan ~ -Walls -Source Specific Fan -Ceiling -Environmental Air Exhaust -Interior Braced Wall Panels FRAMING 2 ~ q -Garage/House Occ. Separation -Walls -Enclosed Space Under Stairs -Alternate Braced Wall Panel FINAL -Ceiling Insp-See Special Conditions -Roof Final-House Number -Attic Venting Final-Plumbing Call 48 hours before you dig for utility fine locates 1-800-424-5555 1 J J Page 2 of 3 pity of ~'ar~ ~t~w~s~r~d Building artd Community Development 6d0 Water Street Port Townsend, WA 88368 BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1110 20TH ST Issued: 5121198 Parcel No: 948308903 Lpot: Block: Project: PERM~~ ~ BLD98-00025 Inspection Date :' Inspector Final-Mechanical/Heating Final-Insulation Certificate Final-Vapor Barrier Cert. / Final-Smoke Detectors ~ i LFinal-Public Works Sign-Off ' , Final -Building ~ ~~./~Z ~~ Y SPECIAL CONDITIONS /RESTRICTIONS t . ALL ELEMENTS OF BRACED WALL PANELS REQUIRE INSPECTION PRIOR TO COVER. .2. TESL: Applicant to install erosion control measures per attached details (see Minor Improvement Permit) and per approved engineered drainage plan. 3. FOUNDATION: Crawl girder end post/fdn. wall requires positive connection or use beam pocket (3" bearing, typ.). 4. FLOOR FRAMING: Crawl girder end posUfdn, wall requires positive connection or use beam pocket. 5. PLUMBING: If water pressure exceeds 80 psi, pressure reducing valve required. 6. MECHANICAL: Protection of appliances required when located in garage path-of-travel. 7. FINAL: Contact the Engineering Office far inspection and approval of Public Works requirements prior to scheduling final inspection. GENERAL CONDITIONS 1. A separate electrical permit is required for any electrical work. Z. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call far at least one inspection per year to keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. \J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3