BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1238 BLAINE ST Issued: 12/E/97
Parcel No: 1024043 Lot: Block:
PrD;ect: PERMIT # gLD97-00193
-CONTRACTOR/OWNE~
SEAN RANKINS
1238 BLAINE STREET
PORT TOWNSEND, WA 98368
Construction TypelOcc UselOcc Load
Construction Occupancy
Type 1: SN Group 1: R-3 Load 1:
Type 2: Group 2: Load 2:
Residential Addition: Add slab foundation, two floors of unheated space with deck above; replace window/door.
City Contact: JZ
Type of work: ADD
Type of use: SF
Census Category: 434
Estimated Value: $12,000.00
Zoning: R-II
SI Code:
Type 3:
Type 4:
WNE
SEAN RANKINS
1238 BLAINE STREET
PORT TOWNSEND, WA 98368
Group 3: Load 3:
Group 4: Load 4:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
I
Call 48 hours before you dig for utility line locates
1-800-424-5555
Inspection Date Inspector Inspection Date Inspector
TEMP EROSION & SDM'T CON -Joists
Insp-See Special Conditions ~ -Blocking
SLAB FRAMING
Insp-See Special Conditions #a Insp-See Special Conditions #
-Setbacks Insp-See Special Conditions .~5
-Forms Insp-See Special Conditions
-Monolithic Slab/Fdn 2~l~ ;~~:' ~ --' -Walls ~ 5 !f t~,. ~
-Slab/Radiant ' ~ -Engineered Shear Walls L ~r ~ ~ }~ ~~
-Anchor Bolts -Ceiling
-Lat. Restraint Holdown Hdwr _ ~~ ;~ 1i
::~; . d -Roof
-LIFER 7 -Windows: Egress
FLOOR FRAMING -Window U Value
sl p-See Special Conditions ~3 -Window Safety Glazing ~ ~ !C~ ~/ ,~
Page 1 of 3
City of Port Townsend
Building and Community Development
540 Water Street
Port Townsend, WA 96358
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1238 ELAINE ST
Parcel No: 1024043
Project:
Inspection Date Inspector
-Door U Value
-Weather Resistive Barrier $ S
DRYWALL NAILING
-Walls
-Ceiling
FINAL
Insp-See Special Conditions ~ 7
Final-House Number
Final-Smoke Det. Througout
Final -Building
SPECIAL CONDITIONS /RESTRICTIONS
Issued: 1 Z/8/97
PERM{T # BLD97-00193
TJ.ISUL~L'trG~ a G~t~'E" /Q~ew1'
V~LbLLS ~-f~ td~(IIOi
~LOOR. ~` ~ l
C~it_r~~ ~-3fl
1 . TESC: The public right-of-way shall be kept clean of sediment and debris through sweeping or
other means as needed. Failure to comply with this condition will result in all work on the site
being stopped.
2. SLAB: See sheet 2 of architectural talcs and last page of plans for holdown strapping
Iccations.
3. FLOOR FRAMING: See sheet 2 of architectural talcs for floorjoist and ledger specs.
4. FRAMING: See sheet Z of architectural talcs forjoist, header and ledger specs.
FRAMING: See sheet 2 of architectural talcs and pages 5 & 6 of plans for shear wall locations
and details; blocking required at all panel edges for Shear Wall A (northwest end walls).
FRAMING: Separate electrical permit is required for service to addition. Inspection by L & I
required prior to building department framing inspection.
FINAL: Smoke detectors are required throughout house per 1994 UBC: one in each bedroom,
in hallway/area giving access to bedroom, with minimum one detector on each floor.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
City of Port Townsend
Building and Community Development
540 Water Street
Port Townsend, WA 98169
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1238 BLAINE ST Issued: 12!8/97
Parcel No: 1024043 Lot: Block:
Protect: PERMIT # BLD97-00193
GENERAL CONDITIONS
t. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per yearto
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
Watuman & KatzBuilding
181 Quinry Street, Suik 301
Poo rowvend, WA 98368
Phone: (360)379-3208 Fax (360)379-6923
CITY OF PORT TOWNSEND
C~
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LD97-193R-1 Issued: 8118/99 Parcel Number: 001024043 & 965700012
Job Address: 1238 Blaine Street Zoning: RR=II Type: V`N Occupancy: R_3
Total Occupant Load: No chance Nature of Work: Revision # 1• Replace two existing windows: enlarge
bedroom window from 3°5° to 5°4°; enlarge deck area
Owner: Sean Rankins Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
See Also Original Permit and Plans
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF(1TTTRFTI TN.CPFf TT(lNC
APPROVED/DATE
SLAB/FLOOR FRAMING/INSULATION/
DRYWALL/FINAL:
See original permit
FRAMING: See also original Inspection Record
Windows - .65 U-factor
NFRC sticker must be on new wtradotivs at time of
inspection
Windows -Safety Glazing
FINAL: See also original Inspection Record
Final - Deck/Handrails/Guardrails
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit& BLD97-193R-I
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
,debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenri-four hours notice is required Public Works approval must be received prior to •
_i_~ _c ~~_ D _~J• T..~....~~..~~f.. G....1 L........rl.....
Final Inspections are required prior to occupancy; A CertiScate of Occupancy is required fora non-
residential project.
8. All building permits expire iF no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at feast one inspection per year to keep your
building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2