Loading...
HomeMy WebLinkAboutBLD97-193City of Port Townsend 540 Water Street Port Townsend, WA 98368 Building and Community Development BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1238 BLAINE ST Issued: 12/E/97 Parcel No: 1024043 Lot: Block: PrD;ect: PERMIT # gLD97-00193 -CONTRACTOR/OWNE~ SEAN RANKINS 1238 BLAINE STREET PORT TOWNSEND, WA 98368 Construction TypelOcc UselOcc Load Construction Occupancy Type 1: SN Group 1: R-3 Load 1: Type 2: Group 2: Load 2: Residential Addition: Add slab foundation, two floors of unheated space with deck above; replace window/door. City Contact: JZ Type of work: ADD Type of use: SF Census Category: 434 Estimated Value: $12,000.00 Zoning: R-II SI Code: Type 3: Type 4: WNE SEAN RANKINS 1238 BLAINE STREET PORT TOWNSEND, WA 98368 Group 3: Load 3: Group 4: Load 4: SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS I Call 48 hours before you dig for utility line locates 1-800-424-5555 Inspection Date Inspector Inspection Date Inspector TEMP EROSION & SDM'T CON -Joists Insp-See Special Conditions ~ -Blocking SLAB FRAMING Insp-See Special Conditions #a Insp-See Special Conditions # -Setbacks Insp-See Special Conditions .~5 -Forms Insp-See Special Conditions -Monolithic Slab/Fdn 2~l~ ;~~:' ~ --' -Walls ~ 5 !f t~,. ~ -Slab/Radiant ' ~ -Engineered Shear Walls L ~r ~ ~ }~ ~~ -Anchor Bolts -Ceiling -Lat. Restraint Holdown Hdwr _ ~~ ;~ 1i ::~; . d -Roof -LIFER 7 -Windows: Egress FLOOR FRAMING -Window U Value sl p-See Special Conditions ~3 -Window Safety Glazing ~ ~ !C~ ~/ ,~ Page 1 of 3 City of Port Townsend Building and Community Development 540 Water Street Port Townsend, WA 96358 BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1238 ELAINE ST Parcel No: 1024043 Project: Inspection Date Inspector -Door U Value -Weather Resistive Barrier $ S DRYWALL NAILING -Walls -Ceiling FINAL Insp-See Special Conditions ~ 7 Final-House Number Final-Smoke Det. Througout Final -Building SPECIAL CONDITIONS /RESTRICTIONS Issued: 1 Z/8/97 PERM{T # BLD97-00193 TJ.ISUL~L'trG~ a G~t~'E" /Q~ew1' V~LbLLS ~-f~ td~(IIOi ~LOOR. ~` ~ l C~it_r~~ ~-3fl 1 . TESC: The public right-of-way shall be kept clean of sediment and debris through sweeping or other means as needed. Failure to comply with this condition will result in all work on the site being stopped. 2. SLAB: See sheet 2 of architectural talcs and last page of plans for holdown strapping Iccations. 3. FLOOR FRAMING: See sheet 2 of architectural talcs for floorjoist and ledger specs. 4. FRAMING: See sheet Z of architectural talcs forjoist, header and ledger specs. FRAMING: See sheet 2 of architectural talcs and pages 5 & 6 of plans for shear wall locations and details; blocking required at all panel edges for Shear Wall A (northwest end walls). FRAMING: Separate electrical permit is required for service to addition. Inspection by L & I required prior to building department framing inspection. FINAL: Smoke detectors are required throughout house per 1994 UBC: one in each bedroom, in hallway/area giving access to bedroom, with minimum one detector on each floor. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 City of Port Townsend Building and Community Development 540 Water Street Port Townsend, WA 98169 BUILDER'S PERMIT AND INSPECTION RECORD THIS CARD & APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME Call 385-2294 For Inspection Site Address: 1238 BLAINE ST Issued: 12!8/97 Parcel No: 1024043 Lot: Block: Protect: PERMIT # BLD97-00193 GENERAL CONDITIONS t. A separate electrical permit is required for any electrical work. 2. Reinspections are required after any corrections are complete. 3. Final Inspections and approvals are required prior to occupancy. 4. All building permits expire if no progress has been made within six months, or if no inspections have been made by the Building Department within one year. Call for at least one inspection per yearto keep your building permit active. 5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 Watuman & KatzBuilding 181 Quinry Street, Suik 301 Poo rowvend, WA 98368 Phone: (360)379-3208 Fax (360)379-6923 CITY OF PORT TOWNSEND C~ CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LD97-193R-1 Issued: 8118/99 Parcel Number: 001024043 & 965700012 Job Address: 1238 Blaine Street Zoning: RR=II Type: V`N Occupancy: R_3 Total Occupant Load: No chance Nature of Work: Revision # 1• Replace two existing windows: enlarge bedroom window from 3°5° to 5°4°; enlarge deck area Owner: Sean Rankins Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE See Also Original Permit and Plans SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF(1TTTRFTI TN.CPFf TT(lNC APPROVED/DATE SLAB/FLOOR FRAMING/INSULATION/ DRYWALL/FINAL: See original permit FRAMING: See also original Inspection Record Windows - .65 U-factor NFRC sticker must be on new wtradotivs at time of inspection Windows -Safety Glazing FINAL: See also original Inspection Record Final - Deck/Handrails/Guardrails Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit& BLD97-193R-I GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt ,debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenri-four hours notice is required Public Works approval must be received prior to • _i_~ _c ~~_ D _~J• T..~....~~..~~f.. G....1 L........rl..... Final Inspections are required prior to occupancy; A CertiScate of Occupancy is required fora non- residential project. 8. All building permits expire iF no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at feast one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2