HomeMy WebLinkAboutBLD97-191City of Port Townsend Port ownsend?WA 9868
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD 8 APPROVED PLANS MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection /~I~;``,,~ ~wv 1tlr~~, ~~(,.' ~~~a I
Site Address: 1818 LAWRENCE ST
Parcel No: 965701102
Project:
Issued: 12/11/97
Y Blocl
~~~,Nrr ~ BLD97-00191
OWNE
SHERRY MITTLESTADT
1818 LAWRENCE ST
PORT TOWNSEND, WA 98368
-CONTRACTOR/OWNE
SHERRY MITTLESTADT
1818 LAWRENCE ST
PORT TOWNSEND, WA 98368
PROJECT DESCRIPTIO
Remodel existing dwelling. Other permits: BLD96-00181 (fdn), MIS96-00027, PLM97-00007 and MEC97-00023.
City Contact: RS Construction Type/Occ UselOcc Load
Type of work: ALT Construction Occupancy
Type of use: SF Type t: SN Group 1: R3 Load t: 4
Census Category: 434 Type 2: Group 2: Load 2:
Estimated Value: $12,000.00
Type 3: Group 3: Load 3:
Zoning: R-II
Type 4: Group 4: Load 4:
SI Code:
SPECIAL CONDITIONS/RESTRICTIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
Inspection Date Inspector Inspection Date Inspector
( FRAMING ~ ~'. r ~~ ' ~ -Firestopping
yNOL'ti DEj ZotJ6}{- Ih-I INSULATION ~ ~~ %~
-Floor (R-19)
Insp-See Special Conditions -Ceiling (R-30)
j -Walls -Baffles
-Ceiling j -Fill Exposed Cavities
-Roof VAPOR BARRIER
-Attic Venting Insp-See Special Conditions
~
-Windows: Egress DRYWALL NAILING ~
-Window U Value ,{,51~-/~.,(, ~' !Q , ~[ •i~g(' ~ N n~
-Air seal -~~9 Lavrtti lu1Gt-~t~J
or U Value
-Fire Blocking -Enclosed Space Under Stairs
FINAL ~• s
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
City of Port Townsend Port ownsend [WA 98368
Building and Community Development
BUILDER'S PERMIT AND INSPECTION RECORD
THIS CARD & APPROVED PLAN5 MUST BE ON CONSTRUCTION SITE AT INSPECTION TIME
Call 385-2294 For Inspection
Site Address: 1818 LAWRENCE ST
Parcel No: 965701102
Project:
Inspection Date Inspector
iFinal-House Number
Final-Plumbing
Final-Mechanical/Heating
jFinal-Insulation Certificate
Final-Vapor Barrier Cert.
Final-Smoke Det. Througout
Final-LPG (Fire Dept.)
Final -Building jNGLUVIrIC,t !~j 3 5
G 2Au/~- SPac.~ J
SPECIAL CONDITIONS /RESTRICTIONS
Issued: 12/11/97
BI ck:
NIT ~k#- BLD97-00191
P ~- ~ ~.
FRAMING: Plumbing and mechanical permits are active for this job, however, certain
elements of those permits may require inspection at Framing Inspection.
VAPOR BARRIER: V.B. is required, either kraft-faced insulation, 4 mil poly over insulation or
APPROVED vapor barrier paint. Certification required for paint at Final Inspection.
GENERAL CONDITIONS
1. A separate electrical permit is required for any electrical work.
2. Reinspections are required after any corrections are complete.
3. Final Inspections and approvals are required prior to occupancy.
4. All building permits expire if no progress has been made within six months, or if no inspections have
been made by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
5. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2